Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAdmitted-Finance | ₹2.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.8 Cr+₹2.7 L (0.96%)Admitted-Finance | ₹2.8 Cr+₹2.7 L (0.96%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 Cr+₹44.9 L (15.9%)Admitted-Finance UP | ₹3.3 Cr+₹44.9 L (15.9%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 Cr+₹51.0 L (18.1%)Admitted-Finance | ₹3.3 Cr+₹51.0 L (18.1%) | L4 | Admitted-Finance |
| 5 | L5₹4.4 Cr+₹1.6 Cr (55.6%)Admitted-Finance | ₹4.4 Cr+₹1.6 Cr (55.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Suman Engineering Works L1 | LAXYO ENERGY LIMITED L4 | ABHISHEK ENTERPRISES L2 | Kedar Construction and Supplier L3 | VIVEK CONSTRUCTION L5 | Kamal Builders L6 |
|---|---|---|---|---|---|---|---|---|---|
| 10.00Earthwork in filling up ground depressio | |||||||||
| 10.00 | Earthwork in filling up ground depressio | 14,000 | M3 | 138 ₹22,79,760 Lowest | 275 ₹43,12,000 | 160 ₹26,43,200 | 300 ₹49,56,000 | 203 ₹33,53,560 | 245 ₹40,47,400 |
| 10.00 | Amount linked to safety compliance | 1 | LPS | 39,000 ₹46,020 | 5,00,000 ₹5,90,000 | 1,50,000 ₹1,77,000 | 1,00,000 ₹1,18,000 | 2,00,000 ₹2,36,000 | 25,000 ₹29,500 Lowest |
| 20.00Filling for site levelling work with po | |||||||||
| 20.00 | Filling for site levelling work with pon | 1,67,000 | M3 | 117.5 ₹2,31,54,550 Lowest | 141 ₹2,47,24,350 | 119 ₹2,34,50,140 | 125 ₹2,46,32,500 | 185 ₹3,64,56,100 | 200 ₹3,94,12,000 |
| 20.00 | Filling for site levelling work with pon | 16,100 | M3 | 118 ₹22,41,764 | 149 ₹25,18,845 | 108 ₹20,51,784 Lowest | 130 ₹24,69,740 | 185 ₹35,14,630 | 220 ₹41,79,560 |
| 20.00 | Amount linked to safety compliance | 1 | LPS | 4,30,000 ₹5,07,400 | 10,00,000 ₹11,80,000 | 1,50,000 ₹1,77,000 Lowest | 4,60,000 ₹5,42,800 | 3,00,000 ₹3,54,000 | 1,75,000 ₹2,06,500 |
Tender Value
₹3.4 Cr
Closing Date
25 May 2021, 3:30 pmClosed
Ajay Kumar Verma
Sipat Super Thermal Power Proj PO Ujwal Nagar District Bilaspur 495555
Filling of Low lying areas inside the Township and Helipad area withPond ash at NTPC Gadarwara
2021_NTPC_48983_1
NTPC/SSC - WR-II(Sipat)/9900218833
Open Tender
Civil Works
Works
180 days
Sipat Super Thermal Power Proj PO Ujwal Nagar Dist
As per tender documents
4 documents required · 4 mandatory
₹2,250
Exempted
21 Oct 2021
30 Apr 2021
27 May 2021
30 Apr 2021
25 May 2021
30 Apr 2021
30 Apr 2021 - 15 May 2021
Amount
Earthwork in filling up ground depressio
Earthwork in filling up ground depressio
Amount linked to safety compliance
Filling for site levelling work with po
Filling for site levelling work with pon
Filling for site levelling work with pon
Amount linked to safety compliance
ABHISHEK ENTERPRISES
Kedar Construction and Supplier
LAXYO ENERGY LIMITED
VIVEK CONSTRUCTION
Kamal Builders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.65 MB
TD9900218833.pdf
Tender Documents • 10.15 MB
BOQ_52105.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .