Loading…
Loading…
Tender ID
Tender Value
₹61.8 L
EMD Value
₹1.2 L
Closing Date
20 May 2026, 11:00 amClosed
Superintending Engineer
Office Superintending Engineer 14th Circle Irrigation Work Azamgarh
Construction of the Minor
2026_UPIDC_1147928_11
04/S.E./2026-27
Open Tender
Civil Works
Item Rate
180 days
Azamgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,850
₹1.2 L
Yes
Azamgarh
15 Jul 2026
14 May 2026
20 May 2026
14 May 2026
20 May 2026
14 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in Cutting including lift up to 1.5 mtr and lead up to 30mtr including cost of driver /assistant driver,POL,maintenance of machine ,contractor's profit ,taxes etc including levelling,dressing and compaction. | 651.25 | M3 | - | - |
| 1.02 | Earth work by power Transport for a lead of up to 1 Km. including excavation loading, unloading, stacking, manual compaction & dressing including all lift shall be applicable for lead up to 1 Km.excluding Royalty. | 13,099.55 | M3 | - | - |
| 1.03 | E/W in foundation in all kind of soil with all lead and lift and including back filling, watering, ramming of excavated earth into the trenches and removal and disposal of surplus earth as directed by Engineer-in-charge within a distance of 30M from the foundation trenches. | 417.04 | M3 | - | - |
| 1.04 | Laying Local sand including cost of all material labour T &P etc per m3 as directed by Engineer-in-charge | 22.39 | M3 | - | - |
| 1.05 | Laying of C.C in (1:3:6) with stone ballast (20mm to 40mm) size and coarse sand FM not less than 2 including all cost of materials labour and T&P complete.as per direction by Engineer in charge. | 57.6 | M3 | - | - |
| 1.06 | M 150 (1st class) brick work in 1:4 CM with coarse sand FM not less than 2 including cost of all material, labour and T&P etc. Complete. as per direction by Engineer in charge. | 169.12 | M3 | - | - |
| 1.07 | Centering and shuttering for R.C.C. work including cost of all materials, labour and T&P etc for proper completion of work as per direction by Engineer-in-Charge | 101.81 | M2 | - | - |
| 1.08 | Bending, binding ,cutting,placing in position steel reinforcement including materials with cost of binding wire and tack welding for proper completion of work. As per direction of Engineer in Charge. | 1.89 | MT | - | - |
| 1.09 | Reinforced cement concrete (1:1.5:3) in all RCC work with Coarse sand having F.M. Not less than 2.0, Crushed Stone Aggregate of size (4.75 mm to 20 mm) Mechanically mixed and properly compacted by Vibrator including cost of all materials labours T&P etc. as per direction of Engineer in charge. | 25.06 | M3 | - | - |
| 1.1 | Struck Deep Cement Pointing 1:2 C.M. with coarse sand including with all cost of material, labour & T&P etc. as directed by Engineer-in-Charge | 252.76 | M2 | - | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.63 MB
Biddocument11.pdf
Tender Documents • 1.93 MB
BOQ_2148457.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .