| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC BANIKHET NAVEEN KUMAR BANIKHET CHAMBA HIMACHAL PRADESH 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | ₹1.1 Cr | L1 | Accepted-AOC Work awarded and Contractor has submitted Earnest Money amounting to Rs. 141000 only hence one earnest please refunded the LI Bidder |
| 2 | L2₹1.1 Cr+₹5.0 L (4.72%)Rejected-Finance VPO KALPA TEHSIL KALPA DISTT KINNAUR HIMACHAL PRADESH | ₹1.1 Cr+₹5.0 L (4.72%) | L2 | Rejected-Finance Rates are nodt Justified |
| 3 | L3₹1.1 Cr+₹6.2 L (5.79%)Rejected-Finance V P O SEHAL TEHSIL BAIJNATH DISTT KANGRA H P | MANDI | HIMACHAL PRADESH | 175013 | ₹1.1 Cr+₹6.2 L (5.79%) | L3 | Rejected-Finance Rates are not Justified |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical VILLAGE PO KANOH TEHSIL BARSAR DISTT HAMIRPUR HP | HAMIRPUR | HIMACHAL PRADESH | 174304 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Naveen Kumar L1 | SUNNY KAPOOR L3 | JAI KISHAN CONTRCATOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation In foundations, trenches etc., in earth work,lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm layers, when required in to plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in lead of 20 metres complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 707.1 | Cum | 345 ₹2,43,949.5 Lowest | 400 ₹2,82,840 | 400 ₹2,82,840 |
| 2.00Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | ||||||
| 2.01 | Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge. | 3,622.5 | Sqm | 450 ₹16,30,125 Lowest | 500 ₹18,11,250 | 450 ₹16,30,125 Lowest |
| 2.02 | Flat surfaces such as soffits of suspended floors, roofs, landings and the like floors etc. upto 200mm in thickness complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 6 | Sqm | 450 ₹2,700 Lowest | 500 ₹3,000 | 500 ₹3,000 |
| 3.00 | Providing and laying cement concrete 1:5:10 (1cement:5sand: 10graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining wall/breast wall, the size of plums shall usually 150mm to 300mm as per HPWD / JSV specification complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 332.06 | Cum | 7,600 ₹25,23,656 Lowest | 8,000 ₹26,56,480 | 8,000 ₹26,56,480 |
| 4.00 | Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 122.4 | Cum | 7,200 ₹8,81,280 Lowest | 8,200 ₹10,03,680 | 8,100 ₹9,91,440 |
| 5.00Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in :- | ||||||
| 5.01 | Foundation , footing, bases of columns and the like & mass concrete.complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 165.93 | Cum | 9,680 ₹16,06,202.4 Lowest | 10,000 ₹16,59,300 | 10,000 ₹16,59,300 |
| 5.02 | Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 230.59 | Cum | 9,680 ₹22,32,111.2 Lowest | 10,000 ₹23,05,900 | 10,000 ₹23,05,900 |
| 6.00 | Providing and fixing Tor Steel reinforcement for RCC work including in including bending , binding and placing in position complete upto floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge . | 15,778.07 | Kg | 99 ₹15,62,028.93 Lowest | 100 ₹15,77,807 | 105 ₹16,56,697.35 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
27 Oct 2025, 11:30 amClosed
Executive Engineer
Jal Shakti Division Baijnath District Kangra HP
Construction of RCC kuhl at various RD and Check Dam plum concrete retaining wall at different RDs
2025_HPIPH_118247_1
8793-8850 dated 17-10-2025
Open Tender
Civil Works - Others
Item Rate
270 days
Paprola
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,000
Executive Engineer
₹1.4 L
2 Dec 2025
18 Oct 2025
27 Oct 2025
18 Oct 2025
27 Oct 2025
18 Oct 2025
Amount
Excavation In foundations, trenches etc., in earth work,lift upto 1.50 mts.stacking the excavated soil not more than 3 metres clear from the edge of the excavation and then returning the stacked soil in 15 cm layers, when required in to plinths sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed with in lead of 20 metres complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:-
Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge.
Flat surfaces such as soffits of suspended floors, roofs, landings and the like floors etc. upto 200mm in thickness complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and laying cement concrete 1:5:10 (1cement:5sand: 10graded stone aggregate 40mm nominal size) with 15% plum and curing complete excluding cost of form work in retaining wall/breast wall, the size of plums shall usually 150mm to 300mm as per HPWD / JSV specification complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and laying cement concrete 1:4:8 (One cement is to four sand is to eight graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and laying cement concrete 1:2:4(1cement:2sand:4 graded stone aggregate 20mm nominal size)and curing complete excluding the cost of form work in :-
Foundation , footing, bases of columns and the like & mass concrete.complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
Providing and fixing Tor Steel reinforcement for RCC work including in including bending , binding and placing in position complete upto floor two level complete in all respect in all leads and lifts as per the direction and Entire to the Satisfaction of Engineer in Charge .
JAI KISHAN CONTRCATOR (BID ID -575622)
SUNNY KAPOOR (BID ID -575812)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_172966.xls
BOQ • 0.30 MB
TC.pdf
Tender Documents • 0.05 MB
Form_6.pdf
Tender Documents • 0.26 MB
Form_8.pdf
Tender Documents • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .