Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance 7G CORNFIELD ROAD KOLKATA 700019 | KOLKATA | KOLKATA | WEST BENGAL | 700019 | L1 | Accepted-Finance Price inclusive of all taxes. | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.3 Cr
Closing Date
7 Dec 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE (AI), Planning Division, SWID
Planning Division, SWID, Bikash Bhavan, 4th Floor, DF Block, Sector 1, Salt Lake City, Kolkata-700091
CONSTRUCTION OF 432 NOS. PROTECTION WORK AND WASHING CLEANING OF EXISTING GROUND WATER MONITORING WELLS
2020_SWID_303472_1
NCB07/PW_WC/NHP/WBGW/2019-20 (2nd Call)
Open Tender
CIVIL WORKS
Item Rate
365 days
All over West Bengal
Prequalification
6 documents required · 6 mandatory
Exempted
Bikash Bhavan
7 Jan 2021
5 Nov 2020
7 Dec 2020
6 Nov 2020
7 Dec 2020
26 Nov 2020
6 Nov 2020 - 11 Nov 2020
11 Nov 2020
180 days
Amount
Construction of Protection work:
Construction of protection work of P-Tube Stations by 1st class Brick Work (250mm Th.) on Cement Concrete (1:1.5:3) at base( and top) with reinforcement over Single Brick Flat Soling .Shuttering as per requirement for the concreting and all the walls and concrete surfaces to be finished with cement sand plaster( 20mm,1:4) and neat cement as per drawing . The top cover to be made as per design and drawing, locking arrangement and painting the surfaces of steel with best quality synthetic enamel paint after primer. writing the name of the site with Lat/Long and RL if available on the face of the wall. The rate includes supply of all materials and construction all complete including cost of carriage of all tools and materials to the site .
Washing cleaning of P-Tubes:
Washing cleaning of existing P-Tubes by Bucket washing with the help of suitable bucket after applying Chemical treatment including supply of chemical re-agents & necessary labour including Labour charges for carrying bucket, rope, tools & equipments including opening & re-fixing the hand pump and Development of Tubewell with air compressor by surging for minimum 4(four) hours including lowering of reduction pipe, air pipe etc. upto required depth as per direction of Engineering-in-charge including hire and transport charge of air compressor, generator set and other necessary tools and plants and also cost of fuel/lubricants for air compressor Charges for mobilisation / transportation of equipments, tools & plants including personnel for chemical treatment, bucket washing, hand pump/cylinder etc. all complete
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .