Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.2 LAccepted-Finance KHASRA NO 203 KHARAKPUR DEVIPURA KASHIPUR | KASHIPUR | ₹42.2 L | L1 | Accepted-Finance financial qualified as L1 |
| 2 | L2₹43.1 L+₹81,548 (1.93%)Accepted-Finance | ₹43.1 L+₹81,548 (1.93%) | L2 | Accepted-Finance financial qualified as L2 |
| 3 | Rejected-Technical CHAMUNDA VIHAR RAMNAGAR ROAD KASHIPUR CAPITAL | - | - | Rejected-Technical The Bidder did not qualifies the FQR |
Tender Value
Refer Docs
EMD Value
₹93,500
Closing Date
5 Oct 2023, 5:00 pmClosed
Superintending Engineer
Superintending Engineer, OandM Circle, 400 KV Substation Campus, Kashipur -244713
Work of repairing and renovation of main store shed at 400KV Sub-Station, Kashipur
2023_PTC12_62783_1
SE (OandM)/PTCUL/KSP/21/2023-24
Open Tender
Repair and Maintenance Works
Item Rate
180 days
Kashipur
5 documents required · 5 mandatory
₹2,360
EE, 400KV OANDM DIVISION, KASHIPUR
₹93,500
Yes
Kashipur
19 Oct 2023
4 Sept 2023
6 Oct 2023
4 Sept 2023
5 Oct 2023
4 Sept 2023
4 Sept 2023 - 5 Oct 2023
19 Sept 2023
Amount
Work of shifting manual/with hydra of all materials and equipments from existing store plinth in to adjacent to siding including stacking the same properly in row upto any height and re-shifting of all above material after renovation of shed at existing location as per direction of Engineer- in-charge.
Earth work in excavation manual mean around outside of chain link fencing with dressing of sides and ramming of bottoms, spreading of antiweed getting out the excavated soil and disposal of surplus as directed within a lead of 50m.
Supply and spreading of earth by earth work in excavation by mechanical means (Hydraulic excavation)/manual means over surface area, in trenches, plinth, sides of foundation etc., In layers not exceeding 20 cm in depth, consolidation cach deposited layer by ramming and watering including all led lifts (land of earth supply to be arranged by the contractor at his own cost).
Work of providing and laying in position cement concrete of specified grade including the cost of centering and shuttering- All work upto plinth level: 1:4:8 (1 cement : 4 Coarse sand : 8 graded stone aggregate 20mm nominal size).
Work of providing and laying in position cement concrete of specified grade including the cost of centering and shuttering- All work upto plinth level: 1:2:4 (1 cement : 2 Coarse sand : 4 graded stone aggregate 20mm nominal size).
Brick work with common burnt clay F.P.S. bricks of class designation 7.5 in foundations of store shed and chainlink fencing with 1:4 (1 cement : 4 coarse sand) including cost of material , labour & T&P
Work of providing and fixing of 50X50X6 mm MS channel and MS plate to give vertical support for shed upto top including cost of material, labour, T&P.
Work of proving and fixing of 50X5mm MS strip for holding of G.I. sheet on roof including cost of material, labour, and T&P.
Work of providing and laying of razor wire barbed fencing on MS angle for safety view of material in store including cost of material, labour, and T&P.
Work of complete painting of chainlink fencing after cleaning of MS angle , strip then apply one coat red primer and two coat green paint including cost of material, labour and T&P.
Work of providing corrugated of GI sheet roofing including curved surface fixed with polymer coated j hooks, bolts and nuts 8mm, diameter with bitumen and GI limpet washers including coat of approved steel primer and two coats of approval paint on overlapping of sheets complete with 1 mm thick zinc coated GI sheet with cost of material, labour and T&P.
Work of providing and fixing 25X25X5mm hollow MS pipe for support of GI sheet outside of top area of store shed cost of material , labour and T&P.
Work of complete painting of fabricated store shed after cleaning of MS angle , strip then apply one coat red primer and two coat green paint including cost of material, labour and T&P.
Work of repairing of main gate with cost of welding, shaping, machining and adjustment on rail, lock and key arrangement including cost of material, labour and T&P.
Work of complete painting of fabricated gate of store shed and main gate of substation after cleaning of MS angle, strip then apply one coat red primer and two coat yellow/green paint including cost of material, labour and T&P.
M/s Belwal Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .