Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 CrAdmitted-Fee/PreQual/Technical/Finance | +3.97% | ₹2.6 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.7 Cr+₹2.6 L (0.99%)Admitted-Fee/PreQual/Technical/Finance | +5.00% | ₹2.7 Cr+₹2.6 L (0.99%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.7 Cr+₹5.1 L (1.94%)Admitted-Fee/PreQual/Technical/Finance | +5.99% | ₹2.7 Cr+₹5.1 L (1.94%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹2.7 Cr+₹10.2 L (3.88%)Admitted-Fee/PreQual/Technical/Finance | +8.00% | ₹2.7 Cr+₹10.2 L (3.88%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 Cr
EMD Value
₹1 L
Closing Date
17 Aug 2026, 4:00 pmClosed
the Superintending Engineer,
O/o the Superintending Engineer, Public Works Department (PWD), Buildings South Circle, Thiruvananthapuram
GENERAL-Balan Samskarika Nilayam- Construction of new building for Punalur Balan Samskarika Nilayam in Punalur Taluk.-Work- Composite Work
2026_PWD_864621_1
PWD/BLDG/TR/17611/20242321
Open Tender
Civil Works - Buildings
Percentage
540 days
kOLLAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹9,759
Yes
₹1 L
Yes
14 Sept 2026
6 Aug 2026
21 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix 1 Building Proper(Civil work) | |||||
| 1.001 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | 9.27 | - |
| 1.002 | OD256945/2025-2026:Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M30 of specified diameter and length below the pile cap to carry a safe working
load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads
(Length of pile for payment shall be assured unto bottom of pile cap) Excess or less cement used as per design mix is not payable or not recoverable separately.500 mm
dia piles | - | metre | 3,038.29 | - |
| 1.003 | OD256946/2025-2026:Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M30 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be assured unto bottom of pile cap) Excess or less cement used as per design mix is not payable or not recoverable separately.600 mm dia piles | 1 | metre | 4,105.69 | ₹4,101.58 |
| 1.004 | 20.6.2.1:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.
Single pile above 50 tonne and upto 100 tonne capacityInitial test (Test Load 2.5 times the Safe capacity) | - | per test | 72,144.83 | - |
| 1.005 | 20.6.2.2:Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge.
Single pile above 50 tonne and upto 100 tonne capacityRoutine test (Test Load 1.5 times the Safe capacity) | - | per test | 38,253.54 | - |
| 1.006 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.6 | cum | 359.72 | ₹215.83 |
| 1.007 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | 7,932.89 | - |
| 1.008 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | 8,569.14 | - |
| 1.009 | OD257029/2025-2026:Random rubble masonry with hard stone in foundation and plinth up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 1 | cum | 8,180.72 | ₹8,172.54 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
formoftender.pdf
Additional Documents • 0.11 MB
bid.pdf
Tender Documents • 2.55 MB
pa.pdf
Additional Documents • 0.22 MB
epayment.pdf
Tender Documents • 0.05 MB
ip.pdf
Additional Documents • 0.01 MB
fot.pdf
Additional Documents • 0.11 MB
BOQ_1462952.xls
BOQ • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .