| 1 | L1₹45.9 LAccepted-Finance | L1 | Accepted-Finance Quoted L1 Rate | |
| 2 | L2₹46.2 L+₹32,267.65 (0.70%)Rejected-Finance KANNIRAJAPATTI KANNIVADUGAPATTI MANAPPARAI 621306 | MANAPPARAI | TIRUCHIRAPPALLI | TAMIL NADU | 621306 | L2 | Rejected-Finance Quoted L2 Rate |
| Sl No | Description | Qty | Unit | VAR CONSTRUCTION L1 | N PERUMAL L2 |
|---|---|---|---|---|---|
| 1.00 | Strengthening the road Puthanatham Kalpatty Road to Kuppanur Road km 0/0-0/0/880 in Elamanam Panchayat. R- 64(VPR) Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. km 0/0-0/880 | 1,056 | Sq.m | 5.9 ₹6,230.4 Lowest | 10 ₹10,560 |
| 2.00 | BT Picking including all labour charges KM 0/0-0/880 | 1,094.5 | Sq.m | 21 ₹22,984.5 Lowest | 30 ₹32,835 |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A KM 0/0-0/880 | 591.03 | cu.m | 131 ₹77,424.93 Lowest | 150 ₹88,654.5 |
| 4.00 | Providing and Laying US gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. KM 0/0-0/880 | 105.07 | cu.m | 336 ₹35,303.52 Lowest | 350 ₹36,774.5 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-0/880 | 497.48 | cu.m | 2,452 ₹12,19,820.96 Lowest | 2,452 ₹12,19,820.96 Lowest |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. KM 0/0-0/880 | 3,300 | sq.m | 83.46 ₹2,75,418 Lowest | 83.46 ₹2,75,418 Lowest |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/0-0/880 | 3,300 | sq.m | 19.76 ₹65,208 Lowest | 19.76 ₹65,208 Lowest |
| 8.00 | Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as
per clause 507 of MORTH Rev-5 KM 0/0-0/880 | 99 | cu.m | 11,926 ₹11,80,674 Lowest | 11,926 ₹11,80,674 Lowest |
| 9.00 | RCC slab Culvert 3.00m span at ch 0m Earth work excavation and depositingon bank with
all lead and lift in all classes of soil such as
hard stiff claystiff black cotton hard red earth
shales murrams, stoneyearth mixed wilht 50% fair
mixed boulders, hard gravellyetc except sand and
rock requiringblastingwith all incidental
charges etc completefor foundation asper SS 20 B | 121.71 | cu.m | 246.52 ₹30,003.95 Lowest | 246.52 ₹30,003.95 Lowest |
| 10.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered,rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 15.56 | cu.m | 1,840.89 ₹28,644.25 Lowest | 1,840.89 ₹28,644.25 Lowest |
Tender Value
₹48.7 L
EMD Value
₹49,000
Closing Date
22 May 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
DRDA Tiruchirappalli
Strengthening the road Puthanatham Kalpatty Road to Kuppanur Road in Elamanam Panchayat. in Vaiyampatty Block,Tiruchirappalli Dt,pkg25
2025_RDTN_553087_25
DIPR/1714/Tender/2025
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹49,000
DRDA Tiruchirappalli
11 Aug 2025
3 May 2025
22 May 2025
3 May 2025
22 May 2025
3 May 2025
9 May 2025
Amount
Strengthening the road Puthanatham Kalpatty Road to Kuppanur Road km 0/0-0/0/880 in Elamanam Panchayat. R- 64(VPR) Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. km 0/0-0/880
BT Picking including all labour charges KM 0/0-0/880
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A KM 0/0-0/880
Providing and Laying US gravel soling to compacted thick including cost and conveyance of gravel from approved sources to works site including labour for spreading, watering and compacting by power roller to achieve the required proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. KM 0/0-0/880
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-0/880
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. KM 0/0-0/880
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., KM 0/0-0/880
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 KM 0/0-0/880
RCC slab Culvert 3.00m span at ch 0m Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff claystiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravellyetc except sand and rock requiringblastingwith all incidental charges etc completefor foundation asper SS 20 B
Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered,rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement concretein C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoringshutteringbalingout water etc., complete For foundation & basement
Cement concretein C M 1:3:6 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoringshutteringbalingout water etc., complete For Abutment &wing
Supplying & fabrication of steel for RCC works including cost and conveyance of steel to site including labour charges for cutting bending and tying rods and placing the grills in position for premeasurement asper steel schedule.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Bed Block
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Deck Slab
Providing weepholes arrangements
Providing Bitumen pad arrangements
Cautionary Sign Board
60cm Equilateral Triangle Cautonary Sign Board
60 CM Circle Mandatory Sign
Cheveron Sign 90 CM Octogon (Curves)
Provision for HM Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}
N PERUMAL (BID ID -1342109)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .