Loading…
Loading…
Tender Value
₹41.0 L
EMD Value
₹82,100
Closing Date
12 Aug 2026, 4:00 pm
Commandant Engr SHQ ITBP Patna
Commandant Engr SHQ ITBP Patna
Upgradation of existing second no. main gate with guard room and boundary wall at 6th Bn ITBP Jalalpur Chhapra
2026_ITBP_918137_1
No. ITBP/SHQ (Patna)/Engg/6th Bn/Main Gate/2026-614
Open Tender
Civil Works - Buildings
Percentage
540 days
Chhapra
As per NIT
3 documents required · 3 mandatory
₹0
₹82,100
6th Bn ITBP Chhapra
21 Jul 2026
21 Jul 2026
13 Aug 2026
21 Jul 2026
12 Aug 2026
21 Jul 2026
21 Jul 2026 - 12 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Civil Work | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. All kinds of soil | 50 | cum | 188.86 | ₹9,443 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 79 | cum | 276.95 | ₹21,879.05 |
| 1.03 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lif. | 129 | cum | 208.54 | ₹26,901.66 |
| 1.04 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 9.5 | cum | 2,259.62 | ₹21,466.39 |
| 1.05 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size) | 14.4 | cum | 7,247.8 | ₹1,04,368.32 |
| 1.06 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) over 75 mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including necessary excavation, levelling & dressing & finishing the top smooth. | 35.1 | sqm | 797.24 | ₹27,983.12 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 41 | sqm | 417.24 | ₹17,106.84 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 32 | sqm | 896.4 | ₹28,684.8 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform | 69.7 | sqm | 986.57 | ₹68,763.93 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.68 MB
BOQ_964929.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].