| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC 1301 3 SHASTRI NAGAR MEERUT U P 250004 | MEERUT | UTTAR PRADESH | 250004 | ₹4.9 L | L1 | Accepted-AOC L1 BIDDER |
| 2 | l2₹5.0 LRejected-Finance P O PURUWALA TEHSIL PAONTA SAHIB DISTT SIRMOUR 173025 H P | PAONTA SAHIB | SIRMOUR | HIMACHAL PRADESH | 173025 | ₹5.0 L | l2 | Rejected-Finance L2 BIDDER |
| 3 | l3₹5.0 LRejected-Finance | ₹5.0 L | l3 | Rejected-Finance L3 BIDDER |
Tender Value
Refer Docs
EMD Value
₹4,938
Closing Date
17 Apr 2026, 11:00 amClosed
Resident Enginner
Giri Power House Division HPSEBL Girinagar
O and M of 220 Substation. JOB1
2026_HPSEB_134038_1
REGPHD-08/2026-27
Open Tender
Repair and Maintenance Works
30 days
GIRINAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
₹4,938
25 Apr 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
17 Apr 2026
10 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1O/M of 220/132kV Sub-station at Girinagar | |||||
| 1.01 | Complete dismantling of all three poles of 145 kV SF₆ Circuit Breaker (CGL make, Type120-SFM ,Sr No 1453C, MFG 1986) of Machine No-2 including dismantling of all three poles, safe lowering, opening of interrupter chambers, replacement of complete gasket/O-ring set, cleaning of flange faces, servicing of operating mechanism, spring charging motor, gearbox, trip & closing coils (220V DC), auxiliary contacts, checking of main contacts wear, lubrication, replacement of worn bushes/bearings if required, proper re-assembly with torque tightening, pole alignment, refixing on structure, SF6 gas pressure checking, SF₆ gas system including evacuation, moisture removal and topping-up / refilling of SF₆ gas as required; checking of density monitor, pressure switches, control wiring and interlocks; adjustment of operating mechanism, replacement of leaking air pressure copper pipes ,timing verification, mechanical and electrical operations including O-C-O operation, measurement of contact resistance of all three poles, functional testing, final testing, commissioning and submission of test reports, complete in all respects as per OEM recommendation leakage test, breaker timing test, IR test and making the breaker fully operational in all respects as per satisfaction of Engineer-in-Charge. | - | Job | 4,18,500 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
2026Tenderdocument08.pdf
Tender Documents • 1.29 MB
BOQ_198205.xls
BOQ • 0.23 MB