Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 4TH FLOOR VOLTAS HOUSE A BLOCK DR BABASAHEB AMBEDKAR ROAD CHINCHPOKLI MUMBAI MAHARASHTRA 400033 | MUMBAI | MAHARASHTRA | 400033 | ₹1.5 Cr | L1 | Accepted-AOC LOWEST AND AWARDED |
| 2 | L2₹1.8 Cr+₹34.8 L (23.3%)Rejected-AOC 226 DANTALI INDUSTRIAL ESTATE GOTA VADSAR ROAD NR AHMEDABAD CITY AT DANTALI TA KALOL GANDHINAGAR GUJARAT 382721 | GANDHINAGAR | GUJARAT | 382721 | ₹1.8 Cr+₹34.8 L (23.3%) | L2 | Rejected-AOC HIGHEST |
| 3 | Rejected-Technical 145 A HSIDC HSIDC SECTOR 31 FARIDABAD FARIDABAD HARYANA 121003 | FARIDABAD | HARYANA | 121003 | - | - | Rejected-Technical Not qualfiied eligibility |
Tender Value
₹29,500
EMD Value
₹2 L
Closing Date
10 Mar 2020, 1:00 pmClosed
HOU (TP)
The Kerala Minerals and Metals Ltd. Sankaramangalam, Chavara, Kollam, 691583
Design Engineering Procurement Manufacturing inspection packing and forwarding supply transportation to site unloading storage at site site fabrication painting testing erection commissioning of a 150 TR Brine Chilling Unit with accessories as per sc
2020_KMML_341625_1
TP/PROJ/BCP/02
Open Tender
Miscellaneous Works
Supply and Service
240 days
TP UNIT, KMML
Please refer Tender documents
7 documents required · 7 mandatory
₹29,500
Yes
online
₹2 L
KMML, Chavara
5 Jan 2021
10 Feb 2020
11 Mar 2020
10 Feb 2020
10 Mar 2020
19 Feb 2020
19 Feb 2020
SUPPLY Items :
Design, Engineering, Procurement, Manufacturing, inspection, packing & forwarding, supply, transportation to site, unloading, storage at site of 150 TR Brine Chilling Unit with associated auxiliaries including electrics and instrumentation but excluding civil foundation and structural building works.
Supply of essential Spares for the safe and reliable operation of the 150 TR Brine Chilling Unit - (List of essential items with detailed price to be attached separately)
Description of Work / Item(s)
ERECTION & COMISSIONING
Erection, Testing & Commissioning, Carrying out performance guarantee tests, training of operating/ maintenance personnel and handing over of 150 TR Brine Chilling Unit as detailed in the Tender Specification (Excluding civil foundation and structural building works).
Three years comprehensive annual maintenance contract (CAMC) for 1 No online chlorine stack monitoring system with consumables and spares required for the system.(detailed rates with tax split up of the item with each taxes to be enetred in the attched pdf document)
ICE MAKE REFRIGERATION LIMITED
VOLTAS LIMITED
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .