| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹4.1 L (2.30%)Admitted-Finance | ₹1.8 Cr+₹4.1 L (2.30%) | L2 | Admitted-Finance |
| 3 | L3₹1.9 Cr+₹7.2 L (3.98%)Admitted-Finance | ₹1.9 Cr+₹7.2 L (3.98%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | akbar L1 | DE LIMRA BUILDCON LLP L3 | Daybro constructions L2 |
|---|---|---|---|---|---|---|
| 1.00CIVIL WORK | ||||||
| 1.01 | 2.3.2.B : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness
In area of thorny jungle - By Mechanical Means | 0.08 | Hecter | 60,855.2 ₹4,625 Lowest | 60,855.2 ₹4,625 Lowest | 60,855.2 ₹4,625 Lowest |
| 1.02 | 55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 3.56 | cum | 2,400.06 ₹8,553.81 Lowest | 2,400.06 ₹8,553.81 Lowest | 2,400.06 ₹8,553.81 Lowest |
| 1.03 | 55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 9.29 | cum | 2,317.52 ₹21,529.76 Lowest | 2,317.52 ₹21,529.76 Lowest | 2,317.52 ₹21,529.76 Lowest |
| 1.04 | 55.9.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 3.56 | cum | 10,718.28 ₹38,199.95 Lowest | 10,718.28 ₹38,199.95 Lowest | 10,718.28 ₹38,199.95 Lowest |
| 1.05 | 55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 9.29 | cum | 4,766.63 ₹44,281.99 Lowest | 4,800.66 ₹44,598.13 | 4,800.66 ₹44,598.13 |
| 1.06 | 3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 410 | cum | 48.58 ₹19,917.8 Lowest | 50.58 ₹20,737.8 | 50.58 ₹20,737.8 |
| 1.07 | 3.15 : Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means | 4,690 | sqm | 5.62 ₹26,357.8 Lowest | 8.62 ₹40,427.8 | 8.62 ₹40,427.8 |
| 1.08 | 4.2.A.2 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Grading-IV - For lower sub base - Mix in Place Method | 2,363.95 | cum | 3,166.44 ₹74,85,309 Lowest | 3,350.4 ₹79,20,181.43 | 3,250.44 ₹76,83,880.89 |
| 1.09 | 4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 1,796.1 | cum | 3,260.62 ₹58,56,399.58 Lowest | 3,380.52 ₹60,71,751.97 | 3,360.62 ₹60,36,009.58 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
17 May 2022, 11:00 amClosed
Manager Projects
KEL Kochi
IMPROVEMENT OF U.K PADI KADUKKA CITY MALA ROAD- MANKADA
2022_KEL_489570_1
KRO/ BDC/1133/2022
Open Tender
Civil Works - Others
Item Rate
360 days
KEL Kochi
As per NIT
6 documents required · 6 mandatory
₹8,850
₹1 L
Yes
23 May 2022
10 May 2022
19 May 2022
10 May 2022
17 May 2022
10 May 2022
10 May 2022 - 17 May 2022
Amount
CIVIL WORK
2.3.2.B : Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of thorny jungle - By Mechanical Means
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.9.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface.
55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
3.6 : Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
3.15 : Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres by Mechanical Means
4.2.A.2 : Construction of granular sub-base by providing graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Grading-IV - For lower sub base - Mix in Place Method
4.12 : Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a : Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.3.2.a : Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder (VG 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. For Grading II - (19 mm nominal size)
5.6.2.a : Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder( NRMB) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects Grading - II (13.2 mm Nominal Size)
3.17 : Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
QUARRY MUCK
51.2.3 : Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade
EXCLUSIVE OF GST
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of installation, testing and commissioning cost for all items
3.Rate should be Exclusive of GST.
4.CEMENT: Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
5.RCC: (Assessment of strength of concrete by Cube testing at Approved Govt labs as per IS) Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
6.VETRIFIED FLOOR TILES/ CERAMIC GLAZED WALL TILES: Make: Khajaria, Jhonson, RAK, NITCO, Cera or Eq. in the order of preference and prior sample approval from KEL, Client
7.CENTERING & SHUTTERING: (Centering and shuttering for different category of work may be considered separately.)
8.PLUMBING & SANITARY FITTINGS: Note: Make of Water supply and sanitary items: Best branded ISI make Jaquar, Cera, Hindware, Parryware or eq. in the order of pref. Water pipe: Supreme, Finolex or eq. with IS and all fittings with IS.
9. ACRYLIC SMOOTH EXTERIOR PAINT/ SYNTHETIC ENAMEL PAINT/WHITE CEMENT BASED PUTTY/ CEMENT PRIMER: Make: Asian, Berger, Nerolas or eq. in the order of pref.
10.DELUXE MULTI SURFACE PAINT SYSTEM: Make: JOTUN, Asian, Berger, Nerolas or eq. in the order of pref.
11. STEEL WORK G.I.PIPE: Make: JINDAL, Tata or eq. primary make in the order of preference.
12. ELECTRICAL: Note: Rate should be inclusive of preparation of schematic diagram and getting approval from KSEB/Electrical Inspectorate. Statutory fees paid to KSEB/EI shall be paid by us separately.
Make of Electrical equipments/materials
All electrical materials/equipments shall be of best branded items with ISI, strictly as per schedule specification
Panel Boards: CPRI certified reputed manufacturers make
MCB/ELCB/DB - L&T/LEGRAND/SCHNEIRDER or equivalent
Cables & wires - Finolex/KEI/POLYCAB/RPG/V-GUARD
Switches/Sockets/Regulators - SCHEIDER/ABB/HAVELS/LEGRAND or equivalent
Rigid PVCPipes/Casing & Capping - A-ONE/REPUTED MAKE with ISI , Precession, Balco, GEO
Cable Glands & Sockets - REPUTED MAKE , Cosmos
Indicating Lamps - TEKINIC/RISHUB/STC, L&T, Schneider or equivalent
Ceiling/Exhaust fan: Havells, Orient, Usha, Crompton Greaves, Bajaj
Daybro constructions
DE LIMRA BUILDCON LLP
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .