Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹5.0 L
EMD Value
₹5,000
Closing Date
12 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Panchayat Road and Building Division, Morbi
Compound wall near the kund in Rafaleswar village, A.Ja. area, Taluka and District: Morbi
359253
88/2026
Open
Civil - All
Works
Morbi
6 documents required · 6 mandatory
₹600
Executive Engineer, Panchayat Road and Building Division, MORBI
₹5,000
26 Oct 2026
26 Oct 2026
26 Oct 2026
12 Nov 2026
26 Oct 2026
120 days
Name of work :- રફાળે વર ગામે અ. . િવ તારના ુ ંડ પાસે ક પાઉ ડ વોલ. તા ક
BILL OF QUANTITIES
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
1 Excavation for foundation upto 1.5m depth 42.48 One 267.08
including sorting out and stacking of useful Cum
materials and disposing of the excavated
stuff upto all lead. (C) Hard Murrum
2 Providing and laying cement concrete 1:2:4 7.08 One 2769.69
(1- Cement : 2Coarse sand : 4- graded stone Cum
aggregates 20 mm nominal size) and curing
complete excluding cost of formwork in (A)
Foundation and Plinth
3 Providing and Laying Cement concrete 1:3:6 7.97 One 3095.25
( 1 Cement, 3 Coarse Sand, 6 hand broken Cum
stone aggregate 20MM nominal size) and
curing complete excluding cost of formwork
in foundation and plinth
4 Providing 15mm thick cement plaster in 491.94 One 180.40
single coat on Rough (Similar)side of single Sqm
or half brick walls for interior plastering
upto floor two level and finished even and
smooth in (i) Cement mortar 1:3 (1 cement:3-
5 Providing and fixing 112.50 One 109.24
M.S.Grill/Shutter/frame of required pqttern Kgs.
weighing maximum 25Kg par smt
includingtower bolt, stopper, priming coat
and two coat of oil paint etc comp
6 Providing and fixing marble plate of size 1.00 One 279.69
15cm*25cm*1.5cm with cement mortar 1:2 as No
per instruction of EIC
7 Precast concrete block mesonary with solid 42.48 One 3771.97
concrete blocks of approved size made of Cum
cement concete blocks of approved size
made of cement concrete 1:3:6 mix in
foundation and plinth cement mortar 1:6
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
8 Precast concrete block mesonary with solid 43.17 One 4053.69
concrete blocks of approved size made of Cum
cement concete blocks of approved size
made of cement concrete 1:3:6 mix in
Superstructure cement mortar 1:6
9 White washing with lime on wall surface 491.94 One 12.70
(two coats) to give an even shade including Sqm
thoroughly booming the surface to remove
all dirt, dust; mortar drops and other foreign
Rupees Four Lakh(s) Ninety Eight Thousand Four Hundred Seventeen And Paise
Ninety Nine Only
I \ We am \ are willing to carry out the work at ……………………… % above \ bellow
percent ( Should be written in figures and words ) of the estimated rate mentioned above.
Amount of My \ Our tender works put as under.
Item Description of Item (With brief specification Quantity Unit Rate Amount
No. and reference to book of Specification)
* Estimated Amount * Estimated Amount
Put to tender Rs…………………… Put to tender Rs……………………
Deduct……..……..% Add……..……..%
In words………………….……………… In words………………….………………
1.The Contractor shall exhibit a board with detailed specification and details of work as directed
by the Engineer-In-Charge for which no extra payment shall be made.
2.The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3.GST and Income tax TDS will be deducted at a source while making payments of bills
4.In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt. G.R.: PRC-10/2017 Cement Consumption/16/C Date:11/05/2017 as stated in
S.O.R. therefore in R.C.C. items where there is a change as per actual mix design the cost
of difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Signature of Contractor.
Deputy Executive Engineer Executive Engineer
Panchayat R&B Sub Division Panchayat R&B Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 SBD Rafalewsar Comp. Wall.pdf
2 Speci. Rafalewsar Comp.pdf
3 Sch -B.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .