| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.0 LAccepted-AOC | ₹18.0 L | L1 | Accepted-AOC Accept |
| 2 | L2₹18.3 LRejected-Finance SEVALUR | SEVALUR | ₹18.3 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | RRD CONSTRUCTION L2 | SRISURYAASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00Name of the Work :Strengthening the Road from Manavasi Modakku Salai to KM.2/4 of Mayanur Sengal Road (Mangamma Road) (R-384) Km.1/500 - 1/575 H/O. Mayanur Panchayat | |||||
| 2.00 | Clearing the Scrub Jungle including all labour Charges for urrying and burning etc., | 92.25 | m3 | 6 ₹553.50 | 6 ₹553.50 |
| 3.00 | Picking 5cm to 10 cm old metailed surface and sectioning including etc., complete | 125 | m3 | 24 ₹3,000 | 23 ₹2,875 |
| 4.00 | Earth Work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting sideration etc., complete as per SS20B | 186.57 | m3 | 143 ₹26,679.51 | 140 ₹26,119.80 |
| 5.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading. watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | 32.81 | m3 | 346 ₹11,352.26 | 341 ₹11,188.21 |
| 6.00 | Construction of Granular Sub Base by Providing Well graded material (25mm to 4.75 mm IRC metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%&2.36mm below IRC HBG metal @ 15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity | 93.72 | m3 | 3,093 ₹2.9 L | 3,046 ₹2.9 L |
| 7.00 | Providing and laying spreading and compacting graded stone aggregate to Wet machanical mix plant carriage of mixed material by tipper to site 'aying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-0/250 | 150.65 | m3 | 3,168 ₹4.8 L | 3,119 ₹4.7 L |
| 8.00 | Providing and laying of prime coal using Emulsion at the rate of 7 Kg per ten square meter over the WAM surface preparatory to another bituminous construction over it. | 780 | m2 | 89 ₹69,420 | 87 ₹67,860 |
| 9.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material. labour charges, rentals for machinery, fuel and all other incidental charges etc.. | 780 | m2 | 21 ₹16,380 | 21 ₹16,380 |
| 10.00 | Providing and laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50 13.20mm, 0.43 cum of 13.20-2.36 mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site. heating the bitumen, aggregate and mixing them in required temperature using central hot mix plant 20-30 ton capacity | 39.01 | m2 | 10,031 ₹3.9 L | 9,878 ₹3.9 L |
Tender Value
Refer Docs
EMD Value
₹18,180
Closing Date
6 Feb 2026, 3:00 pmClosed
BDO(B.Pt), Krishnarayapuram
BDO(B.Pt), Krishnarayapuram
Strengthening the Road from Manavasi Modakku Salai to of Mayanur Sengal Road Mangamma Road R-384 Mayanur Panchayat
2026_RDTN_648973_1
Strengthening the Road from Manavasi Modakku Salai to KM.2/4 of Mayanur Sengal Road (Mangamma Road)
Open Tender
Civil Works - Others
90 days
Krishnarayapuram Union Office
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,180
Yes
14 Mar 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
6 Feb 2026
30 Jan 2026
Name of the Work :Strengthening the Road from Manavasi Modakku Salai to KM.2/4 of Mayanur Sengal Road (Mangamma Road) (R-384) Km.1/500 - 1/575 H/O. Mayanur Panchayat
Clearing the Scrub Jungle including all labour Charges for urrying and burning etc.,
Picking 5cm to 10 cm old metailed surface and sectioning including etc., complete
Earth Work excavation and depositing on bank within initial lead and lift in hard gravelly soil for cutting sideration etc., complete as per SS20B
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading. watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of Granular Sub Base by Providing Well graded material (25mm to 4.75 mm IRC metal @ 65% 4.75 to 2.36mm IRC HBG metal @ 20%&2.36mm below IRC HBG metal @ 15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity
Providing and laying spreading and compacting graded stone aggregate to Wet machanical mix plant carriage of mixed material by tipper to site 'aying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0-0/250
Providing and laying of prime coal using Emulsion at the rate of 7 Kg per ten square meter over the WAM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material. labour charges, rentals for machinery, fuel and all other incidental charges etc..
Providing and laying 50mm consolidated thick Bituminous Macadam using 0.20 cum of 26.50 13.20mm, 0.43 cum of 13.20-2.36 mm and 0.08 cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site. heating the bitumen, aggregate and mixing them in required temperature using central hot mix plant 20-30 ton capacity
Providing and laying Bituminous concrete to 25mmthick using 0.13 cum of 19.00-9.50 mm 0.17 cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by lipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory / Phenumatic roller to the required density etc.,
Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:354. The finished surface to be level uniform and free from streks and holes etc., complete
Road Stud with lens reflactor
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_778009.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid