Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance | ₹2.6 L | L1 | Accepted-Finance Lowest Bid Offer |
| 2 | L2₹2.6 L+₹2,811.79 (1.08%)Rejected-Finance VILL P O BHUBANNAGAR P S KAKDWIP DIST SOUTH 24 PARGANAS | KAKDWIP | SOUTH 24 PARGANAS | WEST BENGAL | ₹2.6 L+₹2,811.79 (1.08%) | L2 | Rejected-Finance Higher than L1 |
| 3 | L3₹2.9 L+₹26,252.99 (10.1%)Rejected-Finance 73D SOUTH SINTHEE ROAD KOLKATA 700030 | 24 PARAGANAS NORTH | WEST BENGAL | 700030 | ₹2.9 L+₹26,252.99 (10.1%) | L3 | Rejected-Finance Higher than L1 |
| 4 | L4₹2.9 L+₹29,409.09 (11.3%)Rejected-Finance VILL P O RUDRANAGAR P S SAGAR SOUTH 24 PARGANAS | SOUTH 24 PARGANAS | ₹2.9 L+₹29,409.09 (11.3%) | L4 | Rejected-Finance Higher than L1 |
| 5 | L5₹2.9 L+₹32,278.27 (12.4%)Rejected-Finance AKSHAY NAGAR KAKDWIP KAKDWIP SOUTH TWENTY FOUR PARGANAS 743347 | KAKDWIP | SOUTH TWENTY FOUR PARGANAS | WEST BENGAL | 743347 | ₹2.9 L+₹32,278.27 (12.4%) | L5 | Rejected-Finance Higher than L1 |
Tender Value
₹2.9 L
EMD Value
₹5,738
Closing Date
21 Aug 2026, 2:00 pmClosed
Assistant Engineer, Kakdwip Sub Division
Assistant Engineer Kakdwip Sub - Division, P.H.E. Dte. Akshaynagar Kakdwip, Dist- South 24 Parganas, Pin - 743347
Restoration of damaged 90 mm dia UPVC pipeline under kakdwip Sub - Division of Alipore Division, P.H.E. Dte.
2026_PHED_1036682_1
WBPHED/AE/NIeT-01/KSD/2026-27
Open Tender
CIVIL WORKS
Percentage
Namkhana
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,738
Yes
11 Sept 2026
7 Aug 2026
24 Aug 2026
7 Aug 2026
21 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, with necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. | |||||
| 1.01 | N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv) Payment will be made on actual consumption of materials. v) UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi) Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves. | - | - | - | - |
| 1.02 | a) 90mm dia. | 510 | Mtr. | 342 | ₹1,74,420 |
| 2 | Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source). B) For UPVC/HDPE Pipe a) 90mm dia. | 510 | Mtr. | 3.6 | ₹1,836 |
| 3 | Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source). B) For UPVC/HDPE Pipe f) 90mm dia. | 510 | Mtr. | 0.88 | ₹448.8 |
| 4 | Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for village road where light traffic run and for main road where heavy traffic run as deptt.approved drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling over150mm.thick sand filling in foundation including earth work in excavation and disposal of excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement type:- Other manufactuerers not specified] ii) 150 mm dia. | 1 | Each | 12,649 | ₹12,649 |
| 5 | Supply and delivery of CIDF sluice valve (Special type) PW-1.00 of different dia make with CI double flanged non rusting spindle sluice valves conforming to IS 14846 -2000 with latest emended having body dome/bonnet and cover of C.I.Gr-F.G 210mtr. spindle of IS-6603 G.R- 12/Gr-13 non-magnetic, nuts seat rings are of Gunonetal as per IS:318 LTB-2 flanges and drilled to IS:1538 Part IV & VI valves are suitable for max. working pressure of 10kg/cm2(seat test) and body tested to 15kg/cm2. N.B: The above item should be procured from the reputed manufactures as per deptt. approved vender list ii) 150 mm dia. | 1 | Each | 9,174 | ₹9,174 |
| 6 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick | 5 | Cum. | 939 | ₹4,695 |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety | 5 | Cum. | 6,022.49 | ₹30,112.45 |
| 8 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. | 10 | Sqm. | 361 | ₹3,610 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2546622.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .