| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-AOC | ₹2.0 L | 1 | Accepted-AOC O.K. |
| 2 | 2₹2.0 LRejected-AOC | ₹2.0 L | 2 | Rejected-AOC O.K. |
| 3 | 3₹2.0 LRejected-AOC | ₹2.0 L | 3 | Rejected-AOC O.K. |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
15 Apr 2020, 5:00 pmClosed
S.E., E.T.C., Bareilly
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Periodic Patrolling and Routine/Preventive/Breakdown Maintenance of 33KV Incoming Lines from 220KV/132KV S/S Dohna to 400KV S/S Bareilly for Station Supply at 400KV S/S Bareilly under E. 400KV S/S Div., Bareilly during the Period of 1 Year
2020_UPTCL_453947_1
E-Tender No. 117 / W / ETC(B) / 2019 - 20
Open Tender
Electrical Works
365 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
A/c No 10897666087 IFSC SBIN0000615 S.B.I. Bly
₹2,000
8 Sept 2020
21 Mar 2020
16 Apr 2020
21 Mar 2020
15 Apr 2020
21 Mar 2020
21 Mar 2020 - 15 Apr 2020
Amount
Periodic Patrolling & Routine / Preventive / Breakdown Maintenance of 33KV Incoming Lines from 220KV / 132KV Sub Station Dohna to 400KV Sub Station Bareilly for Station Supply at 400KV Sub Station Bareilly alongwith other associated Works during the Period of 1 Year w.e.f. 01.05.2020 to 30.04.2020, with all Cost of Men, Materials, Misc. Consumables T&Ps etc. Required for Satisfactory Completion of the Work, as per Technical Specification and Direction of Supervising Engineer : (1) Monthly Patrolling of Following 33KV Incoming Lines from 220KV / 132KV Sub Station Dohna to 400KV Sub Station Bareilly for Station Supply at 400KV Sub Station Bareilly and Providing of Patrolling Report : (a) Monthly Patrolling of 33KV Line from 220KV 132KV Sub Station Dohna to 400KV Sub Station Bareilly. (3.5 Km Length × 12 Months = 42.0 Km)
(b) Monthly Patrolling of 33KV Line from Tapping Point of 33KV Dohna (132KV Sub Station Dohna) - Nawab Ganj (33KV Sub Station Nawab Ganj) Line to 400KV Sub Station Bareilly. (1.0 Km Length × 12 Months = 12.0 Km)
Periodic Lopping & Chopping of Branches of different types of Trees like Mango, Neem, Sheesham, Peepal, Semal, Eucalyptus, Popular etc. Falling in Corridor of the above 33KV Power Lines to Provide Minimum Clearance of about 8 Meter between the Tree & Conductors on both side of the Towers / Line with all due Care of Safety & Precautions to Avoid any Damage to Nearby Buildings, Power & Telephone Lines Passing Nearby, Crops, other Nearby Trees etc. The Work also includes Removing, Eliminating & Cleaning the Line Sites after Lopping & Chopping of the Trees during the Period of 1 Year w.e.f. 01.05.2020 to 30.04.2021.
Replacement of Old & Damaged Stay Set (due to Rusting) by new Stay Set (G.I. Stay Rod of size 20 × 1800 mm, 7 / 8 SWG Stay Wire, Stay Clamp, Bolts - Nuts - Washers etc. with due Concrete Grouting. (1 Job per Stay Set)
Providing & Fixing of Danger Board alongwith associated Fixtures.
Re-Concreting of Damaged Stone Pad of S.T. Poles.
Restringing of Loose Sagged Conductors, if Found Loose.
Providing of 33KV XLPE Cable Out Door End Jointing Kit of standard make.
Cable Jointing Work of 33KV XLPE Cable Out Door End Jointing Kit. (1 Job per Cable Out Door End Jointing Kit)
Providing of 33KV XLPE Cable Straight Through Jointing Kit of standard make.
Cable Jointing Work of 33KV XLPE Cable Straight Through Jointing Kit. (1 Job per Cable Straight Through Jointing Kit)
Replacement of Damaged 33KV Tension Disc Insulator / Insulator String by new Disc Insulator / Insulator String to be Provided by the Department Free of Cost as per Requirement. (1 Job per Tension Insulator String)
Replacement of Damaged 33KV Pin Insulator by new Pin Insulator to be Provided by the Department Free of Cost as per Requirement. (1 Job per Pin Insulator)
Replacement of Damaged Pin of 33KV Pin Insulator by new Pin of 33KV Pin Insulator to be Provided by the Department Free of Cost as per Requirement. (1 Job per Pin)
Replacement of Damaged P.G. Clamp (ACSR Dog Conductor to ACSR Dog Conductor) by new ones to be Provided by the Department Free of Cost as per Requirement. (1 Job per P.G. Clamp)
Tightening of Jumper / Clamp including Replacement of Damaged Bolts - Nuts - Washers, if any by new ones to be Provided by the Department Free of Cost as per Requirement. (1 Job per Jumper / Clamp)
Replacement of Damaged Jumper by new One whenever Snapping Occurs. The Location of Snapped Jumper will be Informed by the Supervising Engineer. (1 Job per Jumper)
Attending Break Down of Snapped Conductor due to Damage of Conductor / Tension Insulator String, whenever Snapping Occurs. The Location of Snapped Jumper will be Informed by the Supervising Engineer. (1 Job per Conductor)
LASHANI ENTERPRISES
SHRI BALAJI ENGG. WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf