Loading…
Loading…
Tender Value
₹8.7 L
EMD Value
₹8,688
Closing Date
15 Oct 2026, 6:00 pm
Executive Engineer Public Health Work Division, Rajkot
PROVIDING,LOWERING,LAYING & JOINTING 110 MM 6 KG/CM2 PVC PIPELINE BTWN OLD SUMP & NEW PROPOSED 1 LAKH LITRE CAPACITY RCC U/G SUMP AT CHITALIYA VILLAGE UNDER REJUVENATION PROGRAM TA.JASDAN, DIST.RAJKOT
350561
15/2026-27
Open
Water Supply/ Sanitation Works
Works
Rajkot
6 documents required · 6 mandatory
₹900
Executive Engineer,Public Health Works Division Rajkot
₹8,688
30 Sept 2026
30 Sept 2026
30 Sept 2026
15 Oct 2026
30 Sept 2026
Name of work: - “PROVIDING,LOWERING,LAYING & JOINTING 110 MM 6 KG/CM2
PVC PIPELINE BTWN OLD SUMP & NEW PROPOSED 1 LAKH LITRE CAPACITY RCC
U/G SUMP AT CHITALIYA VILLAGE UNDER REJUVENATION PROGRAM TA.JASDAN,
Taluka: Jasdan District: Rajkot.
Estimated Cost: - Rs.8,68,795.61/-
Gujarat Water Supply & Sewerage Board
Zone –3, Rajkot.
Volume III: Price Bid
VOLUME – III – PRICE BID
2.0 BID FORM (WITH PRICE)
SUMMARY OF - Grand Summary of Schedules (Covering
Schedule – A Nil
Schedule - B Breakup of Cost for Construction Phase &
Operation and Maintenance.
PROVIDING,LOWERING,LAYING &
JOINTING 110 MM 6 KG/CM2 PVC
PIPELINE BTWN OLD SUMP & NEW
PROPOSED 1 LAKH LITRE CAPACITY
RCC U/G SUMP AT CHITALIYA VILLAGE
UNDER REJUVENATION PROGRAM
TA.JASDAN, DIST.RAJKOT.”
Ta.: Rajkot Dist.: Rajkot
Schedule of Payment for Works
Volume III: Price Bid
Name of work :- PROVIDING,LOWERING,LAYING & JOINTING 110 MM 6 KG/CM2
PVC PIPELINE BTWN OLD SUMP & NEW PROPOSED 1 LAKH LITRE CAPACITY RCC
U/G SUMP AT CHITALIYA VILLAGE UNDER REJUVENATION PROGRAM TA.JASDAN,
Taluka: Jasdan District: Rajkot.
1. The bidder shall quote his firm and fixed price for the entire work under this Contract,
defined in more details in various sections of this bid document.
2. The rates and prices shall be submitted in the electronic formats given by n-procure which
is called Schedule-B (Schedule B1, Schedule B2...., Schedule C), rates and prices received
in any other formats will be rejected and the Bids will be disqualified.
a. The Schedule-B shall constitutes the price summary
b. The Schedule-B1, Schedule-B2,.... & Schedule-C etc shall constitute the price breakup
for Civil, Mechanical, Electrical, O&M works.
3. It will be entirely at the discretion of the Employer to accept or reject the bidder’s proposal,
without giving any reasons whatsoever and the bidder shall not be permitted to withdraw
his bid on this account.
supplied from the by client.
5. In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate as called
for against the BOQ item.
B only will be considered for price evaluation & shall form a part of the Contract Agreement.
8. The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. Bidder shall
give year wise break up of cost for 5 years O&M in Schedule-C/1 to Schedule-C/5
seperately for Schedule-C. The total shall be in line to the price quoted in Schedule-C. The
total shall be carried forward to Schedule-B for comparison and evaluation.
9. Wherever for a particular item the quantities have been specified payment shall be on unit
rate basis and unit variation in quantity will be paid with pro rata basis.
10. Each item is to be individually priced online and the amounts shall be added up to arrive at
except where the item description requires the item to be priced on "as applicable” basis.
The item shall not be priced if it is “not applicable” to the bidder’s design, in which case the
bidder shall add the words “NOT APPLICABLE”. The wording in the item description is for
subject matter guidance only; clause references are indicative only and all other relevant
clauses shall also be referred to. The prices shall allow for all the works covered under the
bid and all liabilities and contractual obligations whether separately specified or not. Items
against which no prices are quoted shall not be separately paid for and the bidder shall be
Volume III: Price Bid
deemed to have covered the cost of execution of such items (according to the requirements
of the bid document) in the prices quoted for other items.
satisfactory working/safety of the system as specified, will not be separately paid for by the
Employer when executed and shall be deemed to be already covered by other items and
rates listed in the price sheets No extra payment shall be given for any item which is
required to complete and perform the project.
during the pendency of the Contract. In case of any discrepancy noted in the various price
schedules, those in Schedule B will be considered and binding on the Contractor. The
arithmetic corrections if any will be considered for financial evaluation of the bid.
13. Schedule ‘D gives the basis of interim payment for construction of civil works.
14. The bidder shall be deemed to have allowed in his price for provision, maintenance and
final removal of all temporary works of whatsoever nature required for construction
including temporary bunds, diverting water, pumping, de-watering etc. for the proper
execution of works. The rates shall also be deemed to include any works and setting out
that may be required to be carried out for laying out of all the works involved.
15. Prices shall be filled online only.
Specifications and other sections of these bid documents and these documents are to be
taken as mutually explanatory of one another.
17. The bidder shall interpret the data furnished and carry out any additional survey work, or
investigation work required at his own cost.
18. The prices quoted shall also include the cost of materials utilized for testing.
19. The bidder should acquaint himself with the site conditions including the access to Work
site. The successful bidder shall have to make suitable access to work sites at his own
cost. These accesses will be used by the other contractors working for GWSSB.
shall include all the equipments / materials / accessories and services required as per the
21. The amount to be quoted for O & M / year shall be as per Volume-IB, General Conditions of
Contract, Clause No. 1, Security Deposit.
22. 1% of the value of work will be deducted from the Running bill against labour cess which is
non refundable.
23. Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the same
will be borne by GWSSB.
24. Any expenditure incurred by inspection/ CSC agency for the work misinformed by the
contractor and charges of inspection/ CSC agency without any work due to misinformation
shall be recovered from the contractor.
Volume III: Price Bid
25. The prices shall be quoted exclusive of all taxes, royalties and duties prevailing at the time
of submission of the bids. Statutory variation if any during the currency of contract shall
have to borne by the agency which shall be not reimbursed by the GWSSB.
26. The rates should be quoted exclusive of GST and all other taxes as per Volume-II(A),
General Conditions of Contract, Clause No.
27. The Ministry of Finance and Company Affairs, Department of Revenue, Government of
India has issued a notification No. 6/2007-Central Excise Circular No. 6/2007, dated 1th
March 2007 regarding the Central Excise Duty Exemption. By this notification, the
notification 659/50/2002 dated 6th September, 2002 has been amended and the earlier
notification 26/2009 dated 4th December, 2009 has been amended and the Items of
materials, instruments, apparatus and appliance, ancillary equipments and their
components/parts, etc. for setting up of Water Treatment Plants and the Pipes needed for
delivery of water from its source to the Plant and from there to the Storage facility (as
mentioned in notification No.6/2007) are exempted from Central Excise Duty subject to the
Certification by the Collector/ District Magistrate/ Deputy Commissioner of the District,
regarding its use on such Projects. Necessary Project Authority Certificate shall be made
available to the Contractor, as per the prevailing rules, to facilitate him to avail the benefit in
terms of Exemption of Central Excise. ( Circulars attached herewith )
28. The Bidders shall have to quote the rates in this tender keeping in view of the Probable
rebate available to them as per the above Circulars of Government of India. The liability of
the Department is limited to issuing the Project Authority Certificate to the Contractor and
the Department does not take any responsibility whether the Agency gets the Excise
Exemption or not. The Complete responsibility rests with the Contractor/Agency only.
29. The process requires that the bidder shall quote his price for the work components
during the entire period of performance of the contract except price variation allowed for
supply of MS/DI/PVC/HDPE pipe as per Volume-II(A), General Conditions of Contract.
30. Payment shall be made for the components for which lump sump prices are quoted, as per
the schedule of payment. Total cost will be worked out on the basis of work done of
individual items and rates quoted against those particular items only.
31. Royalties: The contractor shall be liable to pay the royalty of the quarried materials/
minerals used in the construction of works at the rates specified in the Narmada Water
Resources, Water Supply & Kalpsar Dept. Resolution No. GEN-2010-595- (6)- M.I.Cell ( K-
1) Dt. 29-4-2011 ( Gujarati Version Copy enclosed) and shall be recovered from the
running bills of the work from time to time and remaining amount if any shall be recovered
from the final bill before releasing the security deposit of the work. The contractor shall
furnish the statement showing the quantity of quarried materials / minerals from whom
purchased ( with full address of the seller) and copies of the bills for purchase to the
Executive Engineer of the in charge of the work. The contractor shall also furnished such
additional information as regards royalty payment to the competent authority.
32. Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non compliance entire responsibility shall be rest with
the agency and required amount shall be recovered from any due amount of the agency.
33. GWSSB can recover penalty amount from the agency for not taking the insurance. Though
the penalty amount is recovered, responsibility of the agency for taking insurance shall be
continued and will not be escaped from the responsibility.
34. The contractor shall apply fair means of stock maintenance and shall adopt accounting
Volume III: Price Bid
standard as may be prescribed under GST Act as applicable in the state of Gujarat. For
arriving at the difference in procurement prices due to introduction of GST it will be open for
the Board to ask for original invoices, lorry receipt, weigh bridge slips, payment details and
such other documents as may be required for the purpose.
35. The claim of contractor regarding GST shall have to be backed by documentary evidence
substantiating the actual payment of tax duly certified by the competent tax authority. The
final decision regarding the quantum of claim amount to be recovered or reimbursed shall
be of the competent authority of the GWSSB and shall be binding on the contractor.
Signature of Contractor Deputy Executive Engineer Executive Engineer
P.H.S. Sub Division P.H.W. Division
Volume III: Price Bid
2. BID FORM (WITH PRICE)
Bidders are required to fill up all the blank spaces in this Bid Form.
SUB : Name of work- PROVIDING,LOWERING,LAYING & JOINTING 110 MM
KG/CM2 PVC PIPELINE BTWN OLD SUMP & NEW PROPOSED 1 LAKH LITRE
CAPACITY RCC U/G SUMP AT CHITALIYA VILLAGE UNDER REJUVENATION
PROGRAM TA.JASDAN, DIST.RAJKOT Taluka: Rajkot
District: Jasdan
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of Contract,
including Addenda / Amendments to the above, for the execution of the above Contract, we
the undersigned offer to Design, Engineer, Procure, Construct, Complete, Commission,
operate, maintain and Run the whole of the said works for 06 (Six) Months from the date
of commissioning including defects liability period as given in Conditions of Contract and in
conformity with the drawings, conditions of Contract, specifications, Preamble to Price
Nos.____________________ (insert numbers) for Lump sum fixed price of
____) for Construction including free trial run for three months or such other sum as may be
ascertained in accordance with the conditions.
2. I / We agree that
(a) If we fail to provide required facilities to the Employer’s representative or any other
person / Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
(b) If we incorporate into the Works, materials before they are tested and approved by the
Engineer’s representative
(c) If we fail to deliver pure water of required quantity according to the conditions /
stipulations of the Contract, the Engineer will be at liberty to take any action including
termination of Contract and impose at his absolute discretion any penalties, and / or
reject the work.
3. We undertake, if our Bid is accepted, to complete and deliver the works in accordance with
the Contract with in ......... Months, inclusive of monsoons, from the date or receipt of Letter
of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the last date of submission of
bid and it shall remain binding upon us and may be accepted at any time before the expiry
of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract Agreement
with you incorporating the conditions of Contract thereto annexed but until such agreement
Volume III: Price Bid
is prepared this Bid together with your written acceptance thereof shall constitute a binding
Contract between us.
6. We agree, if our Bid is accepted, to furnish performance Security in the forms and of value
specified in the Clause 1 of Volume-IB, General Conditions of Contract.
7. We have independently considered the amounts of liquidated damages shown in Appendix
to Bid and agree that they represent a fair estimate of the damages likely to be suffered by
you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any bid you may receive.
(Name of the person)
(In the capacity of)
Duly authorized to sign Bid for and on behalf of
(Fill in block capitals)
Volume III: Price Bid
ATKOT VILLAGE WATER SUPPLY SCHEME
TAL. : JASDAN DIST. : RAJKOT
Schedule showing the items to be supplied by the Department for the work of “
PROVIDING,LOWERING,LAYING & JOINTING 110 MM 6 KG/CM2 PVC PIPELINE BTWN
OLD SUMP & NEW PROPOSED 1 LAKH LITRE CAPACITY RCC U/G SUMP AT
CHITALIYA VILLAGE UNDER REJUVENATION PROGRAM TA.JASDAN, DIST.RAJKOT .”
Approximate Place of
Sr.No. Particulars Unit Rate / Unit
Quantity delivery
1) Contractor shall have to buy and bring ordinary portland cement as per IS 8112-1989 & IS
12269-1987 or its latest revision with ISI mark from open market and produce the bill of purchase
along with necessary test certificate at the time of claiming running account bills. The cement shall
be tested in the Departmental laboratory at the cost of the contractor whenever instructed by
Engineer-in-charge. No extra cost should be claimed by the contractor for the same.
2) All materials except shown in Schedule-A and required for the work shall be provided by the
3) The contractor shall arrange lifting and carting of materials from departmental store to site of
work which includes loading, unloading and proper stacking of materials.
4) The contractor has to provide safe store before taking delivery of materials.
5) The materials not shown in Schedule-A will be issued at issue rate or market rate which is on
higher side if the same is available with the departmental and if found in the interest of the work.
6) Any material remaining un-used at the time of completion of work or termination of contract
shall be returned to departmental store in perfectly good condition at contractor's cost. When
materials are supplied free of cost for use in work and surplus and unaccounted balance thereof are
not returned to the department, recovery in respect of such balances will be effected at double the
applicable issue rate of the material or the market rate whichever is higher.
Signature of Contractor Deputy Executive Engineer
P.H.S. Sub Division
Volume III: Price Bid
GUJARAT WATER SUPPLY & SEWERAGE BOARD
NAME OF WORK :- PROVIDING,LOWERING,LAYING & JOINTING 110 MM 6 KG/CM2 PVC PIPELINE
BTWN OLD SUMP & NEW PROPOSED 1 LAKH LITRE CAPACITY RCC U/G SUMP & DESIGN &
CONSTRUCTION OF RCC U/G SUMP 1 LAKH LITER CAPACITY AT CHITALIYA VILLAGE UNDER
REJUVENATION PROGRAM TA.JASDAN, DIST.RAJKOT
TAL : JASDAN DIST : RAJKOT
RECAPITULATION SHEET SCH-B
o. Name Of Component Cost Of Component
1 1.0 lakh Capacity Sump
Connection btwn Old & New proposed 1 Lakh Litre capacity RCC
Grand Total Net Rs.
Grand Total Net Rs.
I/We am/are willing to carry out the work at % above/below percentage (should be written in
figure & words) above/below the estimated rates mentioned above. Amount of my/our tender
worked out as under :-
Rs. Add.% Rs. Deduct%
Above Rs. Below Rs. __________________
Total Rs. Total Rs. ___________________
(In words Rupees (In words Rupees ____________
EXECUTIVE ENGINEER
Volume III: Price Bid
GUJARAT WATER SUPPLY & SEWARAGE BOARD
Rejuvenation Programme
NAME OF WORK :- DESIGN & CONSTRUCTION OF RCC U/G SUMP 1 LAKH LITER CAPACITY AT
CHITALIYA VILLAGE UNDER REJUVENATION PROGRAMME.TA.JASDAN, DIST.RAJKOT
Q U Items Rate Per Amount Rs.
Item No 1:- Preparing structural design of RCC Under
Ground/Partially underground/above high ground level
Reservoir of required capacity as per relevant I.S.S.
and constructing the same, including excavation in all
types of soil strata(Including rock)including shoring
strutting if required for loose soil / to protect from
collapse due to nearby traffic load, casting 100 mm
thick P.C.C. leveling course in M-15, Refilling the pit
with proper soil and disposing of the surplus stuff
within a lead of 50 meters. Including cement plaster in
CM 1:2 with approved water proofing compound to
inside water touching surface to container. Including
all types of labor and material charges of lowering,
laying, erecting / hosting and jointing of pipe assembly
to inlet, outlet overflow, washout and bye pass
arrangement as per hydraulic design.
Providing and fixing accessories like MS / GI Ladder,
CI Manhole frame and cover, water level indicator,
adequate cowl type ventilators or lantern type
ventilator with stainless steel jail.
B.B. Masonry chambers for valves. Providing and
applying three coats of cement paint / snowcem to the
out side face of structure. It also includes satisfactory
water tightness test as per relevant I.S. code and
painting name of scheme and capacity on the tank as
per direction of engineer in charge.
List of Indian Standards for Design of GSR/SUMP :-
The structural design of GSR shall be in accordance
with provisions relevant I.Ss.
(1) I.S. 3370 patr I & II 2009 or latest revised
(1.1) I.S. 3370 patr III & IV 1965 or latest revised
(2) I.S. 456-2000 or latest revised
(3) I.S. 1893-2000 -1984 or latest revised
(4) I.S. 875 Part-1 to 3.1987 or latest revised
General Specifications:-
Volume III: Price Bid
(1) Water depth in container shall be adopted as
per data of tender. If water depth is not specified the
suitable water depth / acceptable to field engineer in
accordance with hydraulic requirement shall be
adopted for capacity.
(2) Shape of container (in plan) specified by in data
shall be adopted in absence circular shape shall be
(3) Size shall be fixed as per availability of space
(land area) at site / acceptable engineer in charge.
(4) Effect of overlapping of pressure bulbs on soil
due near by structure and proposed sump should be
(5) Care shall be taken that no damage should
occur to nearby existing structure. Compensation
shall be paid for the same by agency.
(6) The minimum concrete grade for RCC shall be
(7) HYSD Fe 415 / 500 grade reinforcing bars
confirming to I.S. 1786 / 1139 shall be considered in
design. CRS / TMT bars shall be provided. In saline
atmosphere corrosion resistance stainless steel / HCR
rebar shall be provided. Any other steel can be used
with approval of C.E./ in situation of non availability in
market without extra cost.
(8) Minimum size (or thickness) of various
components shall be provided as per tender criteria /
specifications in absence as per I.S./ Std. practice of
G.W.S.S.B. Minimum dimensions specified for various
components in tender data / specifications shall be
provided without fail.
(9) The safe bearing capacity (SBC) shall be
referred from SBC test report. In absence of report it
shall be referred from data sheet. If poor soil is found /
water table is met with during excavation SBC shall be
scientifically ascertained and design shall be revise.
No extra shall be paid for increase in quantity.
(10) CI pipes and special shall only be used if type is
not specified in tender.
(11) The rate shall include cost of dewatering during
excavation making all arrangement when water table
meets within depth.
(12) The structure shall be designed properly to resist
uplift due to ground water table specified in data or
actual ground water table meets with during
excavation. No extra shall be paid. If GWT / Uplift is
mentioned in tender and during excavation it dose not
meet 7.5% rate shall be reduced.
(13) SS pipes railing shall be provided when sump is
more than 1.5 meter above ground level.
Volume III: Price Bid
(14 a.) RCC Starircase/RCC steps shoud be provided
fro GL to sump top sla based on the height of the GSR
above/below the ground.
(14 b.) RCC stair case with SS railing to be provided
inside reservoir container, BB Masnory stair cabine
with MS sfety door having locking arrangement to be
provided for GSR sump and HGLR of capacity more
than 7.5 lakhs liter with top slab. if dome is
constructed as top slab then provide minimum
poening of 900 mmX 2000 mm with curbing and SS
rainling around.
(15) Appearance of structure should be aesthetically
good looking acceptable to authority.
(16) Any charge in size, shape, depth below GL,
height above GL, water depth, F.B., size of member etc
can be permitted in exceptional case due to site
condition or hydraulic design requirement by C.E. No
extra shall be paid for change.
(17) Any charge in data, dimensions, shape, water
depth, reduction in size if permitted by competent
authority and if it reduces quantity then payment shall
be reduced prorate.
(18) When capacity of GSR / Sump is > 20 lakh liters
two or suitable compartments acceptable to executive
engineer shall be designed and provided.
(19) Agency shall engage qualified (at least graduate)
consulting engineer for designing the structure and he
/ she shall visit the site for guidance of work.
(20) 75% part rate shall be payable for concrete,
reinforcement and plastering items of container until
satisfactory hydraulic testing for water tightness is
performed as per tender condition. Till the work shall
be treated as incomplete.
Above conditions / general specifications Sr. No. 1 to
20 are part and parcel of tender (contact) and prevail
over other provisions in tender
As above without water table (Sub soil water level
below foundation)
1 N 1.0 lakh Liter Capacity Sump @ Chitaliya Village 380598. Rs.
Deputy executive engineer
P.H.S.Sub.Dn.JASDAN
Volume III: Price Bid
NAME OF WORK :- PROVIDING,LOWERING,LAYING & JOINTING 110 MM 6 KG/CM2 PVC
PIPELINE BTWN OLD SUMP & NEW PROPOSED 1 LAKH LITRE CAPACITY RCC U/G SUMP AT
CHITALIYA VILLAGE UNDER REJUVENATION PROGRAM TA.JASDAN, DIST.RAJKOT
TAL : JASDAN DIST : RAJKOT
Qty. Unit Item Rate Per Amount
Providing and supplying in standard length ISI mark rigid
unplasticised PVC pipes suitable for potable water with solvent
cement joints including cost of couplers, as per IS specification
no. 4985/1988 including all local and central taxes,
transportation, freight charges, octroi, inspection charges,
loading, unloading, conveyance to the departmental stores
and including cost of jointing meterial i.e. solvent cement, etc.
0 Mts. 110 mm pvc 6kg/cm2 199.00 Mts.
Excavation for pipe line trenches incl. all safety provisions
using site rails and stacking excavated stuff up to a lead of
mts. cleaning the site etc. complete for lifts and strata as
specified. Up to 1.5 mt depth
275.40 cum (a) In all sort of soils and soft murrum 89.00 cum
275.40 cum (b) In hard murrum 135.00 cum
367.20 cum (c) In soft rock 163.00 cum
Lowring, laying and jointing PVC pipes and specials of
following class and diameter including cost of conveyance
from stores to site of works including cost of labour, material,
except cement solvent, giving satisfactory hydraulic testing as
110 mm pvc 6kg/cm2
Providing and supplying ISI mark CI D/F Sluice Valves
Butterfly Valves & Reflux Valves as per IS:14848 (latest
edition) of following class and diameter including all taxes,
insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to departmental
stores, stacking etc. complete.
1.00 Nos. 100 mm Dia Sluice Valve 3563.00 Nos.
Lowering, laying and jointing in position following C.I./D/F
Reflux valves, butterfly valves, Sluice valves and Air valves
including cost of all labour, jointing material, including nut bolts
and giving satisfactory hydraulic testing, etc. complete.
100 mm Dia Sluice Valve
Volume III: Price Bid
Providing and supplying C.I Air valves of approved make &
quality of following class and diameter including all taxes,
insurance, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to departmental
stores, stacking etc. complete.
50 mm Dia Air Valve Double acting Single acting (s1 type)
Lowering, laying and jointing in position following C. I. / D/F
Reflux valves, Butterfly valves, Sluice valves and Air valves
including cost of all labour, jointing material, including nut bolts
and giving satisfactory hydraulic testing, etc. complete.
50 mm air Valve Double acting Single acting (s1 type)
Erection of air valve riser by installing new MS pipe of 6 mm
thck and 3.2 m length with neccesary fittin such as flange of
appropriate size nut bolt & embeded the pipe in RCC M15 with
offset of 10 cm around pipe with necessary steel etc extra
Dia of 50 mm Air valve & ms pipe
Refilling the pipeline trenches incl. ramming, watering,
consolidating desposal of surplus stuff as directed within a
radius of 3 km.
903.47 cum 22.00 cum
DEPUTY EXECUTIVE ENGINEER
P.H.S. SUB DIVISION JASDAN
Volume III: Price Bid
1. As mentioned in the Conditions of contract, the Contract being a lump sum type turnkey
Contract on EPC basis, the provision of measurement will be applicable only for the
assessment of value of work done for inclusion in any interim certificate for part payment to the
2. The Schedule specifies the procedure for all such assessment of the items specified in
3. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph 6 herein
4. Percentages are indicated against each component of each items specified in Schedule B,
based on the Employer's best appreciation of the value of the component as related to the total
costs of the concerned item as whole. A head titled (any other item(s)) is included in each
breakdown of schedule and the tenderer shall at the time of tendering indicate any additional
items which he considers necessary but cannot be covered by any of the heads indicated in
5. The percentage breakup as indicated in the Schedule may differ from that corresponding to the
tenderer’s scheme and design and he should take this into account while quoting his lump sum
prices for the items specified in Schedule-B.
6. The contractor shall, after approval of his detailed designs and drawings furnish to the
Employer's Representative an initial bill of quantities to all major items, to be reviewed and
updated periodically with the Employer's Representative. This bill of quantities will be used for
assessment of percentage progress of the component at any stage. By measurement jointly
taken by the Employer's Representative and the Contractor, mutually agreed and entered in
the measurement books in the form and by the method approved by the Employer's
Representative, and signed jointly by both the parties.
Volume III: Price Bid
Schedule Of Payment For Pipeline work
1 On receipt of materials at project site 65 %
2 Lowering, laying and jointing 20 %
3 On Hydraulic testing 5%
4 On refilling and disposal of stuff 5%
5 After commissioning 5%
BREAK UP FOR INTERIM PAYMENTS
(CIVIL, MECHANICAL, INSTRUMENTATION & ELECTRICALWORKS)
Item Description of Items Percentage Payment to be
1 GROUND (UNDERGROUND) LEVEL SERVICE
RESERVOIRS/SUMPS
a) On approval of designs 2 % of Quoted rate
b) On completion of excavation and base slab 18 % of Quoted rate
Volume III: Price Bid
Item Description of Items Percentage Payment to be
c) On completion of vertical wall and braces 20 % of Quoted rate
Full supporting structure including column, ring beam
d) 15 % of Quoted rate
and completion of top slab / dome
e) Plastering inside & outside with epoxy etc. complete 15 % of Quoted rate
Procurement and fixing of inlet, outlet, washout,
f) overflow pipes, valves, specials, chambers, lighting 10 % of Quoted rate
arrester conductor and specials at site
Water level indictor, painting of letters, M.S ladder,
pipes, railing and all miscellaneous items such as
g) 10 % of Quoted rate
snowsam paint in three coats etc (Completed with all
respect) including water tightness test
h) On hydraulic testing 10 % of Quoted rate
DATA SHEET for RCC U/G SUMP
Data sheet showing the details of items to be carried out for the work of
constructing RCC U/G Sump.
Items Descriptions
1 Soil barring capacity Design shall be prepared considering minimum soil baring
test capacity of 10 T/M2
2 Structural designer. Contractor has to prepare design through board’s approved
structural designer.
Contractor’s own Work to be carried out on contractor’s own design
4 Approval of Design Design shall be got approved through another board’s approved
structural designer
5 Water Table Water table to considered is @ 5.0 mt below GL Or Concluded
During SBC Test.
Volume III: Price Bid
Items Descriptions
6 Excavation Excavation for foundation in all strata incl. Shoring, strutting
and dewatering as necessary and disposing the excavated stuff
up to lead of 50m for depth 0.0m to 1.50m
7 Cement Concrete Providing and casting in situ cement concrete in grade m-10
M-15 (approx. corresp. to prop. 1:3:6) using granite quartzite trap
metal of size 12 mm to 25 mm inc. consolidation curing etc.
complete. with formwork
8 RCC Work Providing & cast in situ C.C.in grade M-30 using granite,
quartzite trap metal of size 12 mm to 20 mm & or 6mm to
mm incl. Scaffolding, centering, formwork, needle vibrated
consolidation, curing & hydraulic testing etc complete. (excl.
cost of reinforcement ) up to 6.0 mts. height from AV. GL. all
structure with water proofing compound for (A) For flat bottom
slab, (B) Vertical side wall, (C) Ring beam &(D) Top dome etc.
9 Reinforcement Supplying, cutting, bending, binding and placing in position
steel as per plan and design and as per ISS 2502 incl. Cost of
steel and binding wire including lift up to 6.0 mts. Height or
depth below GL for all diameter TMT deformed bards/cold
deformed bars confirming to ISS fe – 415 grade confirming to IS
10 Cement plaster using Cement plaster 20 mm thick in C.M.1:2 using water proofing
water proofing compound of approved quality incl. Finishing etc. comp. For
compound bottom slab & vertical wall (Inside Cistern/sump)
11 Sand faced type 20 mm thick sand faced type cement plaster on walls up to
cement plaster meters above ground level consisting of Cement Mortar 1:3 (1-
Cement : 3-Sand) etc. complete. (Out side cistern/sump over all
exposed surface)
12 C.I. Pipe/MS pipe Providing, supplying, lowering, laying & jointing ISI mark
C.I. pipes with all necessary accessories of 150 mm dia. 3.0 mtr
in length for inlet & 200 mm dia 3.0 mtr in length for out let
(Pumping main) Including all taxes, insurance transportation,
freight charges, octroi, inspection Charges, loading, unloading,
conveyance, stacking etc complete. (IS - 1239 / 1990).
13 Providing And fixing CI Providing CI cowl type ventilator with air filter and jali etc comp.
cowl type ventilator including Fixing C.I cowl type ventilator in C.C.1:2:4 with bolts &
nuts etc comp. Including cost of jointing materials, as per
requirement & design.(100 mm dia)
14 Supplying and Fixing Supplying at store or site of work miscellaneous water work
M.H. Frame & cover hardware incl. freight insurance and taxes complete including
Fixing all type of M.S. frame and cover in C.C. 1:2:4 incl. Carting
etc complete. M.S Ladder And M.S. Manhole Frame & Cover,
nearby 45 kg/No. Weight, with locking arrangement.
Volume III: Price Bid
Items Descriptions
15 Applying approved Applying any approve quality of cement paint (Weather Coat) in
quality of cement paint three coats including cleaning washing etc. complete. Color
sheds and pattern shall be done as per instruction of Engineer-
16 Letter painting "“RCC U/G SUMP 2.0 LAKH LITER CAPACITY
KHARACHIYA(JAM) Village UNDER REJUVENATION
PROGRAMME.(2025-26)" size 40 mm wide & 20 cms Height in
synthetic enamel oil paint with background and border.
17 Expansion joint Providing and fixing water tight construction or expansion
joints made of G.I. plain sheet of 16 to 18 gauge 30 cm wide.
18 Other details The works are to be carried out as per Item of work in
Schedule-B, and as per Approved structural drawing and design
provided by department & as per instruction of Engineer-in-
In case of any ambiguity in the works like dimensions,
material quality, quantity, proportion or any other uncertainty,
the matter is brought to the notice of Executive Engineer and
the decision give by Executive Engineer will be final and binding
to the contractor.
Necessary Concrete Mix Design for Concrete mix M-30 at
“GERI” or Reputed Material Testing Laboratory shall have to be
carried out by contractor at his own cost.
No hand mixed C.C. is allowed. The c.c. work shall be done
with machine mix concrete only.
DATA SHEET FOR RCC U/G SUMP
:: Design Requirement of U/G Sump ::
At SHAPAR Village
Parameters Particular
(1) Avg. G.L of pumping station plot 100.00 mt.
(2) Bottom level of sump/suction chamber 97.00 mt.
(3) Min. water level in sump 0.30 mt
(4) Max. water level in sump RL As per design (not more then 3.50 m
(5) Water depth min. 3.0 mt.
(6) free board 0.30 mt min. below beam bottom
(7) Capacity of sump in litr 2.00 lacs lit.
(8) location At Kharchiya(jam) village
(9) Inlet size of pumping main and type 150 mm dia, minimum 3.0 mt lenght
Volume III: Price Bid
D.I. Pipe incl specials.
Outlet Pipe size 200 mm dia, minimum 3.0 mt lenght
Size of overflow pipe 100 mm dia-D.I. 1.0 mt.
(10) Type of structure RCC as per design
(11) Grade of concrete RCC M300
(12) Steel Fe-145 TMT steel confirming to
relevant IS or As per design
(13) SBC To be carried out by agency. Incase of
impervious strata encounters, than uplift
pressure should be considered.
(14) Shape of sump CIRCULAR WITH TOP COVER
(15) Size of sluice valve (ISI) Same size for inlet pipe total 1 no valve
(16) Vertical wall Min 15 cm thick (As per design)
(17) Bottom Slab Min 20 cm thick (As per design)
(18) Reinforcement As per design
(19) Size of valve chamber 1.0 x 1.0 x 0.60 mt
(20) Cowl type ventilator 100 mm dia as per design (minimum
vent should be provided as per design
(21) Type of counstruction RCC (as per design) –M -300 if mix
design concrete is required cement of
400kg /Cu.mt must be minimum used.
(22) Staging M.S ladder inside and outside the water
Signature of Contractor Deputy Executive Engineer Executive Engineer
P.H.S. Sub Division P.H.W. Dn.
Volume III: Price Bid
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 VOL IA Technical Bid CHITALIYA 110 pvc.pdf
02 VOL 1 B GCC CHITALIYA 110 pvc.pdf
03 Preamble to Price Bid (Volume-III) CHITALIYA 110 pvc.pdf
05 Revised Technical Specification CHITALIYA 110 pvc.pdf
all GR without M and R.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .