Tender Value
₹16.6 L
EMD Value
₹16,555
Closing Date
2 Mar 2026, 5:00 pmClosed
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
EXECUTIVE OFFICER, BIRMITRAPUR MUNICIPALITY
Construction of Shop room near champu talab west side in w.no-03 of Biramitrapur Municipality
2026_ORULB_126260_3
EO/BRMP/04/2025-26
Open Tender
Civil Works - Others
Percentage
180 days
BIRMITRAPUR MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,555
Yes
24 Apr 2026
20 Feb 2026
5 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil including dressing and leveling the bed and disposal of the excavated materials with mechanical means within 5.00km. initial leads and lifts as per direction of E.I.C. | 70.2 | cum | 276.88 | ₹19,436.98 |
| 2 | Supplying & filling foundation and plinth with sand well watered and rammed including cost, cost of all labour, carriage, royalty, taxes, T&P etc complete. | 46.5 | cum | 1,131.14 | ₹52,598.01 |
| 3 | Cement Concrete (1:4:8) using 40mm size hard granite metal (C.B.) approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of labour T.&P. etc complete and as directed by E.I.C. | 14.97 | cum | 5,886 | ₹88,113.42 |
| 4 | Supplying all materials, labour and T&P etc. and prmriding Fly Ash Bricks of 8ize 23cm. x 11cm. x 8cm. havîng crushing strength not less than 75 kg./cm2 with dimensional tolerance+-2% in cement morlar (1:6) Including transportaton of all materials to sita as declared by the Engineer-in-charge, all complete. SUB STRUCTURE | 22.04 | cum | 5,642.01 | ₹1,24,349.9 |
| 5 | Supplying all materials, labour and T&P etc. and prmriding Fly Ash Bricks of 8ize 23cm. x 11cm. x 8cm. havîng crushing strength not less than 75 kg./cm2 with dimensional tolerance+-2% in cement morlar (1:6) Including transportaton of all materials to sita as declared by the Engineer-in-charge, all complete. SUPER STRUCTURE | 30.58 | Sqm | 5,675.01 | ₹1,73,541.81 |
| 6 | Supplying all materials, labour and T&P etc and providing M25 Cement Concrate In R.C.C. works including hoisting end laying using 20mrn and downgraded siza hard granite crusher broken chips, including transportation of all materials to site and as directed by the Engineer-in-charge, all complete. | 37.49 | cum | 6,630.84 | ₹2,48,590.19 |
| 7 | Supplying , fitting and placing uncoated HYSD bar reinforcement complete as per drawing and techincal specification including cost of steel binding wire and labour required for bending, binding etc. | 37.49 | Qtl | 8,583.94 | ₹3,21,811.91 |
| 8 | Rigid and smooth centering and shuttering for C.C. Works including false work & dismantalling them after casting including all cost, convenyance, required labour T & P other taxes etc all complete. (FOOTING) | 76.01 | Sqm | - | - |
| 9 | Rigid and smooth centering and shuttering for C.C. Works including false work & dismantalling them after casting including all cost, convenyance, required labour T & P other taxes etc all complete. (LINTEL) | 13.14 | Sqm | 574.02 | ₹7,542.62 |
| 10 | Rigid and smooth centering and shuttering for C.C. Works including false work & dismantalling them after casting including all cost, convenyance, required labour T & P other taxes etc all complete. (COLUMN&BEAMS) | 89.16 | Sqm | 1,204.48 | ₹1,07,391.44 |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_581925.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_581925.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .