Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical VILL SANARLI P O BHANTHAL TEHSIL KARSOG DISTT MANDI H P | MANDI | HIMACHAL PRADESH | 175001 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical CHAUHAN BUILDING LOWER PANTHAGHATTI SHIMLA | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical GOVT CONTRACTOR DISTT CHAMBA HP 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹25.4 L
EMD Value
₹51,000
Closing Date
14 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE HPPWD Division Karsog
O/O EE HPPWD Division Karsog
R/R damages on Sanarli Karsog road Km. 0/00 to 3/300 (SH C/o 4.00 mtr span slab culvert at RD 1/420) under PDNA
2026_PWD_147528_5
2026_PWD_6675-84
Open Tender
Civil Works - Roads
Percentage
90 days
Karsog
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,000
₹51,000
16 Nov 2026
7 Nov 2026
16 Nov 2026
8 Nov 2026
14 Nov 2026
8 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for structure as per drawing and technical specification clause 305.1 including setting out construction for shoring and bracing removal of stamps and other deleterious materials and desposal up to any lead dressing of side and bottom and back filling in trenches with excavated suitable materials ordinary soil upto 50 depth or as per direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. | 243.07 | Per Cubic Meter | 341.4 | ₹82,984.1 |
| 2 | Providing concrete for plain/reinforced concrete 1:6:12 (one cement : six course sand : tweleve graded stone aggregate) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 or as per direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. | 5.49 | Per Cubic Meter | 4,429.2 | ₹24,316.31 |
| 3 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 Nominal mix 1:3:6 (one cement: three sand : six graded stone aggregated ) P.C.C grade M 10 including carriage of material with in all leads and lifts and other incidentals and as per the direction of the Engineer-in Charge | 88.96 | Per Cubic Meter | 5,825.5 | ₹5,18,236.48 |
| 4 | Providing concrete for plain/reinforced concrete 1:2:4 (one cement : two course sand : four graded stone aggregate) Nominal mix RCC/PCC M-15 in sub structure complete as per drawings and technical specifications Clause 802, 804, 805, 806, 807 1202 & 1204 or as per direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. | 202.13 | Per Cubic Meter | 6,440.2 | ₹13,01,757.63 |
| 5 | Providing concrete for plain/reinforced concrete 1:2:4 (one cement : two course sand : four graded stone aggregate) Nominal mix RCC/PCC M-20 in super structure complete as per drawings and technical specifications Clause 800,1205.4 and 1205.5 or as per direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. | 21.05 | Per Cubic Meter | 8,362.55 | ₹1,76,031.68 |
| 6 | Supplying and placing Tor steel bar reinforcement in foundation in super structure complete as per drawing and technical specification Clauses 1002,1010,1202 refer MORD specification 100 Sr. 13.3 or as per direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. | 4,338.5 | Per Kilo Gram | 85.35 | ₹3,70,290.98 |
| 7 | Providing weep holes in brick masonary/stone masonary/plain reinforced concrete abutment,wing wall,return wall with 100 mm (one hundred milimetre) dia PVC pipe extending through the full width of structures with slope of 1(v):20 (H) towads drawing face complete as per direction of Engineer-in- Charge including carriage of materials within all leads and lifts and other incidentals. | 43 | Each | 323.55 | ₹13,912.65 |
| 8 | Drainage spout complete as per drawing and technical specification clause 1209 or as per direction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals. | 4 | Each | 1,885.6 | ₹7,542.4 |
| 9 | Providing and Laying filter media with granular crushed aggregate as per specification to a thickness of not less than 600mm(six hundred millimeter) with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specifications clause 1204.3.8 or as per direction of engineer in charge including carriage of materials with in all lead and lifts and other incidentals. | 37.62 | Per Cubic Meter | 1,157.95 | ₹43,562.08 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.63 MB
SanarliKarsog.pdf
Tender Documents • 4.64 MB
BOQ_220363.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .