| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.1 LAccepted-AOC | 1 | Accepted-AOC First lowest | |
| 2 | 2₹5.6 L+₹52,277.65 (10.2%)Rejected-AOC | 2 | Rejected-AOC Second lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical Third lowest |
Tender Value
₹5.1 L
EMD Value
₹12,710
Closing Date
17 Jan 2025, 5:00 pmClosed
Assistant executive engineer
IIP Sub Division No 2 Angamaly
-IIP-Improvement to drainage system to avoid storm water flooding in the IIP Compound premises at Angamaly and other miscellaneous works
2024_Irrig_717539_2
11/ET/AEE II/IIP/2024-25
Open Tender
Civil Works - Others
Item Rate
180 days
Angamaly
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,125
Yes
₹12,710
Yes
21 Feb 2025
7 Jan 2025
20 Jan 2025
7 Jan 2025
17 Jan 2025
7 Jan 2025
Amount
Improvement to drainage system and other allied works
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD26747/2024-2025:Providing and laying in position cement concrete 1:2:4 (1 cement:2 coarse sand: 4 stone aggregate 6 mm nominal size) excluding the cost of centering and shuttering as per direction of Engineer-in-charge
OD25367/2024-2025:Engaging labour for removing waste materials and cleaning of drainage system as per direction of Engineer-in -charge
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
16.91.1:Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.60mm thick cement concrete paver block of M-35 grade with approved colour, design & pattern.
50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
OD26928/2024-2025:Dismantling roofing and stacking the material within 50 metres lead of: Asbestos sheet
12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
14.43:Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
13.50.3:Applying priming coat:With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron /steel works
9.1.3:Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately).Kiln seasoned and chemically treated Hollock wood
9.7.2:Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured), Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick:Kiln seasoned and chemically treated hollock wood
50.14.1.1:Removing and refixing door shutters after necessary repairs for easy opening and closing etc complete as per the direction of site Engineer-in-charge.
50.14.1.2:Removing and refixing window shutters after necessary repairs for easy opening and closing etc complete as per the direction of site Engineer-in-charge
14.54.1:Painting with synthetic enamel paint of approved brand and manufacture of required colour to an give even shade:One or more coats on old work
OD25364/2024-2025:Conveying available excavated earth by mechanical transport including loading, transporting, unloading for lead up to 5km for all lifts, complete as per direction of Engineer in Charge.
OD26743/2024-2025:Filling with available earth(excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of Engineer-in-charge
50.2.26.1:Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
OD25350/2024-2025:Repairing of rolling shutter including replacing of damaged ball bearings, side guides etc and make the shutter in operating condition. The rate shall include cost for replacing of damaged parts, greasing charges and all labour charges.
OD25351/2024-2025:Repairing of rolling shutter by replacing top cover of 1.20 mm thick
OD25414/2024-2025:Engaging labour for dismantling rolling shutter
10.6.2:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x1.20 mm M.S. laths with 1.20 mm thick top cover
10.7:Providing and fixing ball bearing for rolling shutters.
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
15.56:Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
OD27467/2024-2025:Providing and fixing of solar street lighting system with 80W solar light including bracket, fixing on 4m high 50 mm dia 3.6 mm thick GI pole with base plate of size 150mmx150mm, 12mm dia foundation bolt and required end cap. Rate shall include the cost of solar light with accessories, GI pole and all fixing charges excluding the cost of foundation.
P O Thomas (BID ID -2064850)
Martin A A (BID ID -2065410)
Bidder Name
BAIJU.C.NAIR
P O Thomas
Martin A A
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1148477.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .