| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC agg executed |
| 2 | L2₹2.8 L+₹14,400.46 (5.49%)Rejected-AOC | ₹2.8 L+₹14,400.46 (5.49%) | L2 | Rejected-AOC agg executed by l1 |
| 3 | L3₹2.9 L+₹25,920.97 (9.89%)Rejected-Finance | ₹2.9 L+₹25,920.97 (9.89%) | L3 | Rejected-Finance high quoted |
| Sl No | Description | Qty | Unit | JOSEPH MATHEW L2 | Lenju Moncy L1 | ANIL RAJ L3 |
|---|---|---|---|---|---|---|
| 1.00Shed & interlock | ||||||
| 1.00 | OD170252/2025-2026:Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M- 30 grade made by block making machine with strong vibratory compaction, of approved size,
design & shape, laid in required colour and pattern over and including 50 mm thick compacted
bed of bed of Stone Aggregate (single size): 06 mm nominal size, filling the joints with fine
sand etc. all complete as per the direction of Engineer-in-charge. | 168.8 | sqm | 1,136.83 ₹1,91,896.9 | 1,077.62 ₹1,81,902.26 Lowest | 1,184.2 ₹1,99,892.96 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.56 | cum | 345.33 ₹193.73 | 327.34 ₹183.64 Lowest | 359.72 ₹201.8 |
| 1.00 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 66.16 | kg | 179.57 ₹11,880.17 | 170.21 ₹11,260.92 Lowest | 187.05 ₹12,375.04 |
| 1.00 | 12.50:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. | 24.96 | sqm | 808.45 ₹20,178.91 | 766.34 ₹19,127.85 Lowest | 842.14 ₹21,019.81 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.12 | cum | 7,615.57 ₹913.87 | 7,218.92 ₹866.27 Lowest | 7,932.89 ₹951.95 |
| 1.01 | 50.6.1.1:Solid block masonry using pre cast solid blocks ( factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part 1 of 1979 for foundation and plinth with thickness 20 cm and above in: CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 0.48 | cum | 6,151.71 ₹2,952.82 | 5,831.3 ₹2,799.02 Lowest | 6,408.03 ₹3,075.85 |
| 1.01 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 162.9 | kg | 171.28 ₹27,901.85 | 162.36 ₹26,448.77 Lowest | 178.42 ₹29,064.97 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.81 | cum | 8,866.53 ₹16,012.95 | 8,404.73 ₹15,178.94 Lowest | 9,235.97 ₹16,680.16 |
| 1.01 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 11.9 | sqm | 158.27 ₹1,883.41 | 150 ₹1,785 Lowest | 164.86 ₹1,961.83 |
Tender Value
₹2.9 L
EMD Value
₹7,200
Closing Date
9 Sept 2025, 3:00 pmClosed
PARVATHY R
AE OFFICE, LIDEW SECTION KOTTANGAL GP
Annual Plan-Construction of Shed and paving interlock in MCF-Project no 212/25
2025_LSGD_790761_6
03/2025/AE/LIDEW/KTGLGP/PHASE3
Open Tender
Civil Works - Others
Item Rate
180 days
Kottangal
Please refer Tender documents.
7 documents required · 7 mandatory
₹635
Yes
₹7,200
Yes
20 Nov 2025
27 Aug 2025
10 Sept 2025
27 Aug 2025
9 Sept 2025
27 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1303573.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .