Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.3 L Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | L1 | - | |
| 2 | L2₹32.2 L+₹2.0 L (6.48%)Financial bid opened Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | L2 | Financial bid opened | |
| 3 | L3₹32.8 L+₹2.5 L (8.39%) Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | L3 | - | |
| 4 | L4₹32.9 L+₹2.6 L (8.60%) Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | L4 | - | |
| 5 | L5₹33.4 L+₹3.1 L (10.3%) Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets. | L5 | - |
| Sl No | Description | Qty | Unit | MOHANAN T INDOTECH CALICUT L2 | POWERCARE ELECTRICAL L4 | SURINDRA ELECTRICALS L3 | Sudheesh kumar k K L1 | Techno Engineering Corporation L5 |
|---|---|---|---|---|---|---|---|---|
| 1 | ELECTRICAL | - | - | -14.6 ₹32,24,034.46 | -12.9 ₹32,88,213.14 | -13.07 ₹32,81,757.48 | -19.8 ₹30,27,723.23 Lowest | -11.55 ₹33,39,178.55 |
Tender Value
₹37.8 L
EMD Value
₹75,504
Closing Date
20 Jun 2022, 3:00 pmClosed
EE-(E)-Calicut
SANJAY DHINGRA
KENDRIYA BHAVAN, KALLAI-POST
Upgradation and maintenance work at SAI STC Thalassery. SH: SITC of internal EI, LED light fittings, fans, DG set and drinking water pump sets.
9937
11/CLTED/2022-23
OPEN
Electrical Works
NCB
4 months
Kannur, Kerala
7 documents required · 7 mandatory
₹75,504
Not Applicable
20 Jun 2022
13 Jun 2022
20 Jun 2022
20 Jun 2022
17 Jun 2022
stage.html
html • 0.07 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
NITConditions.pdf
document • 0.92 MB
SCHEDULEOFWORK.pdf
document • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .