Tender ID
Tender Value
₹7.3 L
EMD Value
₹7,310
Closing Date
3 Feb 2026, 6:00 pmClosed
Executive Engineer Public Health Work Division, Morbi
Providing,Supplying and Lowering, laying of 2260 mt pipeline of Dia 110mm (6kg/cm2) from Baravala HW Tapping Point to Khevaliya Village tapping with ancillary work under M & R to M.M.J RWSS 2025/26
267362
08/2025-26
Open
Water Supply/ Sanitation Works
Works
Morbi
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer, P.H.Works division, G.W.S.S.B., Morbi
₹7,310
Yes
20 Jan 2026
20 Jan 2026
20 Jan 2026
3 Feb 2026
20 Jan 2026
Estimated Cost:- Rs.
Executive Engineer, P.H.Works Division,
G. W. S. & S. Board, Morbi
VOLUME: IV Price Bid
THIS PAGE IS LEFT INTENTIONALLY BLANK
VOLUME: IV Price Bid
Name of Work :- Providing,Supplying and Lowering, laying of 2260 mt pipeline of Dia
110mm (6kg/cm2) from Baravala HW Tapping Point to Khevaliya Village tapping with
ancillary work under M & R to M.M.J RWSS 2025/26
The rates and prices shall be submitted in the electronic formats given by n-procure
which is called Schedule-B. Rates and prices received in any other formats will be
rejected and the Bids will be disqualified.
(1) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder shall
not be permitted to withdraw his bid on this account.
be free supplied from the by client.
(3) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit
rate as called for against the BOQ item.
in Schedule-B only will be considered for price evaluation & shall form a part
of the Contract Agreement.
and evaluation.
(6) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C.
Bidder shall give year wise break up of cost for 5 years O&M in Schedule-C/1
to Schedule-C/5 separately for Schedule-C. The total shall be in line to the
price quoted in Schedule-C. The total shall be carried forward to Schedule-B
for comparison and evaluation.
(7) Wherever for a particular item the quantities have been specified payment
shall be on unit rate basis and unit variation in quantity will be paid with pro
(8) Each item is to be individually priced online and the amounts shall be added
Schedules of prices shall be left blank except where the item description
requires the item to be priced on "as applicable” basis. The item shall not be
priced if it is “not applicable” to the bidder’s design, in which case the bidder
shall add the words “NOT APPLICABLE”. The wording in the item description is
for subject matter guidance only; clause references are indicative only and all
other relevant clauses shall also be referred to. The prices shall allow for all
the works covered under the bid and all liabilities and contractual obligations
whether separately specified or not. Items against which no prices are quoted
shall not be separately paid for and the bidder shall be deemed to have
covered the cost of execution of such items (according to the requirements of
the bid document) in the prices quoted for other items.
executed for satisfactory working/safety of the system as specified, will not
be separately paid for by the Employer when executed and shall be deemed
VOLUME: IV Price Bid
to be already covered by other items and rates listed in the price sheets No
extra payment shall be given for any item which is required to complete and
perform the project.
fixed, during the pendency of the Contract. In case of any discrepancy noted
after carried over and arithmetic corrections if any will be considered for
financial evaluation of the bid.
(11) Schedule ‘D gives the basis of interim payment for construction of works.
(12) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water,
pumping, de-watering etc. for the proper execution of works. The rates shall
also be deemed to include any works and setting out that may be required to
be carried out for laying out of all the works involved.
(13) Prices shall be filled online only.
Contract, the Specifications and other sections of these bid documents and
these documents are to be taken as mutually explanatory of one another.
(15) The bidder shall interpret the data furnished and carry out any additional
survey work, or investigation work required at his own cost.
(16) The prices quoted shall also include the cost of materials utilized for testing.
(17) The bidder should acquaint himself with the site conditions including the
access to Work site. The successful bidder shall have to make suitable access
to work sites at his own cost. These accesses will be used by the other
contractors working for GWSSB.
and the prices shall include all the equipments / materials / accessories and
services required as per the specifications. The bidder shall fill in the price
schedule furnished.
(19) The amount to be quoted for O & M / year shall be as per Volume-IB, General
Conditions of Contract, Clause No. 1, Security Deposit.
(20) 1% of the value of work will be deducted from the Running bill against labour
cess which is non refundable.
(21) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of
the same will be borne by GWSSB.
(22) Any expenditure incurred by inspection/ CSC agency for the work misinformed
by the contractor and charges of inspection/ CSC agency without any work
due to misinformation shall be recovered from the contractor.
(23) The prices shall be quoted inclusive of all taxes, royalties and duties
prevailing at the time of submission of the bids. Statutory variation if any
during the currency of contract shall have to borne by the agency which shall
be not reimbursed by the GWSSB.
(24) The rates should be quoted inclusive of GST and all other taxes as per
Volume-I (B), General Conditions of Contract, Clause No.
VOLUME: IV Price Bid
(25) The rates quoted shall be inclusive of all taxes, duties and GST, also including
of service tax, which shall not be paid extra. The TDS shall be deducted at
source as per provision of IT rules and GWSSB policy.
(26) The Bidders shall have to quote the rates in this tender keeping in view of the
GST. The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(27) The process requires that the bidder shall quote his price for the work
shall remain firm and fix during the entire period of performance of the
contract except price variation allowed for supply of MS/DI/PVC/GI pipe as
per Volume-IB Clause No. 59, General Conditions of Contract.
(28) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on the
basis of work done of individual items and rates quoted against those
particular items only.
(29) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in
the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No.
GEN-2010-595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from time
to time and remaining amount if any shall be recovered from the final bill
before releasing the security deposit of the work. The contractor shall furnish
the statement showing the quantity of quarried materials / minerals from
whom purchased ( with full address of the seller) and copies of the bills for
purchase to the Executive Engineer of the in charge of the work. The
contractor shall also furnished such additional information as regards royalty
payment to the competent authority.
(30) Agency shall have to take Insurance policy and intimate to GWSSB along with
the evidence within time limit. In case of non compliance entire responsibility
shall be rest with the agency and required amount shall be recovered from
any due amount of the agency.
(31) GWSSB can recover penalty amount from the agency for not taking the
insurance. Though the penalty amount is recovered, responsibility of the
agency for taking insurance shall be continued and will not be escaped from
the responsibility.
(32) The contractor shall apply fair means of stock maintenance and shall adopt
accounting standard as may be prescribed under GST Act as applicable in the
state of Gujarat. For arriving at the difference in procurement prices due to
introduction of GST it will be open for the Board to ask for original invoices,
lorry receipt, weigh bridge slips, payment details and such other documents
as may be required for the purpose.
(33) The claim of contractor regarding GST shall have to be backed by
documentary evidence substantiating the actual payment of tax duly certified
by the competent tax authority. The final decision regarding the quantum of
claim amount to be recovered or reimbursed shall be of the competent
authority of the GWSSB and shall be binding on the contractor.
(34) To facilitate bidder during the bidding stage, department has provided the
indicative quantities in the minimum BoQ, which are meant to appraise the
VOLUME: IV Price Bid
bidder about magnitude of the work and these are likely to vary on the basis
of detailed survey and geotechnical investigation depending upon land/ RoU
availability during execution and the contractor shall have no objection to
such minor or major changes or deletion or addition of the item/ items. The
sizing indicated in the drawing and minimum BoQ is binding to contractor and
size smaller/ lower than this may not be permitted. However, in case higher/
larger size is required as per detailed survey and geotechnical investigation
based detailed Design for execution, it shall be provided at no extra cost. This
being turnkey tender, any item specifically not mentioned in the BoQ, but
required for approval of the competent authority is deemed to be covered in
the project. Payment towards various items indicated in minimum BoQ for
shall be made on the prorate basis i.e. in case estimate is X and contractor
has quoted Y, then ratio of X/Y would be applicable for making the payment
towards the item executed. For the item indicated in the minimum BoQ is not
executed by the contractor, payment shall not be made towards that
particular item.
Signature of contractor Executive Engineer
P.H. Works Dn., G.W.S.S.B
VOLUME: IV Price Bid
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB :- Providing,Supplying and Lowering, laying of 2260 mt pipeline of Dia 110mm
(6kg/cm2) from Baravala HW Tapping Point to Khevaliya Village tapping with ancillary
work under M & R to M.M.J RWSS 2025/26
Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of the
above Contract, we the undersigned offer to design, Engineer, procure, construct,
complete, including defects liability period as given in Conditions of Contract and in
conformity with the drawings, conditions of Contract, specifications, Preamble to
(insert numbers) for Lump sum fixed price of
) for Construction including free trial run for six months or such other sum as may be
ascertained in accordance with the conditions.
1. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any other
person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved by
the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
2. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within _________ months, inclusive of monsoons, from
the date or receipt of Letter of Acceptance issued to us by you.
3. We agree to abide by this Bid for a period of 180 days from the Last date of submission
of the bill and it shall remain binding upon us and may be accepted at any time before
the expiry of that period.
VOLUME: IV Price Bid
4. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but until
such agreement is prepared this Bid together with your written acceptance thereof
shall constitute a binding Contract between us.
5. We agree, if our Bid is accepted, to furnish performance /Security in the forms and of
value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
6. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
7. We understand that you are not bound to accept the lowest or any Bid you may
(Name of the Person)
Company Seal _____________________
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature ___________________________
VOLUME: IV Price Bid
NAME OF SCHEME :- Providing,Supplying and Lowering, laying of 2260 mt pipeline of Dia
110mm (6kg/cm2) from Baravala HW Tapping Point to Khevaliya Village tapping with
ancillary work under M & R to M.M.J RWSS 2025/26
Schedule showing the approximately the materials to be supplied to the contractor from
government stores for the work to be executed and the rate at which they are to be
Sr. Particular Qty. Rate at which the Place of
No. material will be charged Delivery to
to the contractor take
1 Nill Nill NIL NIL Any MORBI
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled in
by the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his
own cost for loading, unloading, and transporting safety to the site of work the
cement stipulated in Schedule-A
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but available
with the dept. will be issued on request to the contractor. (for use in this contract
only) at prevailing market rates or departmental issue rates whichever is higher.
5. All the surplus materials supplied by the deptt. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their correctness
and soundness by the contractor before taking the delivery of the materials from the
7. Necessary cement will be purchased by the agency at their own cost from open
8. The persons of firm submitting the Tender should see that rates in the above schedule
are filled up by the Executive Engineer, on the issue of form prior to the submission of
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Executive Engineer
P.H. Works Dn., G.W.S.S.B
GUJARAT WATER SUPPLY & SEWERAGE BOARD
VOLUME: IV Price Bid
SUMMARY (SCHEDULE-B)
Providing,Supplying and Lowering, laying of 2260 mt pipeline of Dia 110mm
(6kg/cm2) from Baravala HW Tapping Point to Khevaliya Village tapping with ancillary
work under M & R to M.M.J RWSS 2025/26
Sr. No. Name of Work Amount Rs.
Providing,Supplying and Lowering, laying of
2260 mt pipeline of Dia 110mm (6kg/cm2)
SCHEDULE B from Baravala HW Tapping Point to
Khevaliya Village tapping with ancillary work
under M & R to M.M.J RWSS 2025/26
Rebate on above tender (if any)…………%
Net Considering Rebate (3-4)
VOLUME: IV Price Bid
Providing,Supplying and Lowering, laying of 2260 mt pipeline of Dia 110mm
(6kg/cm2) from Baravala HW Tapping Point to Khevaliya Village tapping with
ancillary work under M & R to M.M.J RWSS 2025/26
Qty Unit Item Rate Per Amount
PART-(A) PIPELINE
Providing& Supplying in standard length ISI mark rigid
unplasticed PVC pipes suitable for potable water with
ring fit joint including cost of rings, as per IS specification
2260.00 Rmt. no. 4985/1988 incl. All local ¢ral taxes transportation, 199.00 Rmt.
freight charges, octroi, inspection charges, loading,
unloading, conveyance to the departmental stores& incl.
cost of jointing material etc. comp. A) Purchase of
110mm.dia P.V.C. pipe 6Kg/cm^2 as per ISS-4985
Providing supplying at store or site of work incl.freight,
4.00 No loading, unloading and stacking. In su. & all taxes. PVC 421.00 No
a)110mm.dia PVC Bend 90 6kg/cm2 (F)
Providing and supplying ISI mark CI D/F Sluice Valves as
per IS:14846 (Latest Edition) of following class and
diameter including all taxes, insurance, transportation,
2.00 No freight charges, octroi, inspection charges, loading, 3563.00 No
unloading, conveyance to departmental stores, stacking
PN-1 With hand wheel /cap operated (PD type short
Providing and supplying C.I. Air valves of approved make
& quantity of following class and diameter including all
4.00 No taxes, insurance, transportation, freight charges, octroi, 2496.00 No
inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete.
Air valve double acting (DS2) 50mm
Excavation for pipe line trench for water supply,
sewerage line, manhole etc. all with shoring and
shuttering if required as per required gradient and line
including safety provision using site rails and & stacking
excavated stuff up to all required lead. Clearing the site
etc. comp. For lifts & strata as specified.
949.20 Cum. (a)In all sort of soil and soft murrum 89.00 cum
(b)In Hard murrum
Lowering , laying & jointing PVC pipes & specials of
following class and diameter incl. Cost of works incl.cost
of conveyance from stores to site of works incl. Cost of
labour, material,cement solvent giving satis factory
hydraulic testing as per ISI code , etc. comp.
VOLUME: IV Price Bid
2260.00 Rmt a )110 mm dia 19.00 Rmt.
Lowering,laying and jointing in position following C.I./D/F
Reflux valves, butterfly valves, sluice valves and Air
valves incl. Cost of all labour, jointing material, incl.
Nutbolts & giving hydraulic testing
Air valve double ball Flanged (50 mm)
4.00 No. Air valve double ball Flanged (50mm) 379.00 No.
PN-1 With hand wheel /cap operated (PD type short
Erection of air valve riser by installing new M.S. pipe of
mm thick and 3.2 mt length with necessary fittings such
4.00 No. as flange of appropriate size, nut bolts and embedded 3112.00 No.
the pipe in R.C.C M:15 with offset of 10 cm around pipe
with necessary steel etc complete.
Dia of Air Valve 50mm&MS pipe
Refilling the pipe line trenches incl. Ramming , watering,
1402.00 Cum. consolidating, disposal of sur plus stuff as directed within 22.00 Cum.
a radious of 3 km.
construction of valve chamber in brick or bell masonry,
locally available in CM 1:6 foundation concrete150 mm
thick in C.C 1:4:8 of trap metal size 25 mm to 40 mm
thick, inside cement plaster in C:M 1:3 and top cover of
precast RCC slab 100 mm thick ( with key hole in two
part each with handle or M:S bar etc. complete as given
size) up to 1 m depth from GL to pipe invert incl.
complete. civil work but excluding cost of excavation and
refilling with cast in situ RCC slab in one single piece with
fixing of CI-MH frame and cover (excluding cost of CI-MH
frame and cover) with 23 mm thick brick masonry wall in
size 0.90*0.90 m and 1.0 mtr deep
2.00 Nos. with precast slab in two parts 15 mm 7738.00 Nos.
2.00 Nos. for 1 m extra depth 4479.00 Nos.
I/we herby agree to carry out the above work ……..% (…………………percentage)
Above/Below the above mentioned rates
Signature of contractor Executive Engineer
P.H. Works Dn., G.W.S.S.B
VOLUME: IV Price Bid
PAYMENT SCHEDULE
Ite Percentage Payment to
Description of Items be released
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing & refilling and disposal of surplus stuff 10 % of Quoted rate
d After commissioning 5 % of Quoted rate
2 SLUICE VALVES/AIR VALVE
a On receipt of materials on site 70 % of Quoted rate
b On erection 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d After commissioning 5 % of Quoted rate
11 Miscellaneous work
a All other items such as encasing, Canal crossing, 80% of quoted rate on
internal roads, railway/highway crossing, Anchor/thrust completion of works
b On commissioning of the system 20% of quoted rate
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.0 VOL IIB-I Tech Spec Civil (1).pdf
04 VOL III Price Bid (1).pdf
all GR.pdf
Price Variation Paripatra 2023.pdf
SD-EMD GR 03-May-2025.pdf
Document
Document
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .