| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC LID EW SECTION AREEKODE | KANNUR | KERALA | 670002 | ₹4.1 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | MOHAMMED BASHEER K K L3 | SHIHABUDHEEN L1 | MOHAMMED FASIL N L2 |
|---|---|---|---|---|---|---|
| 1.00thodu protection | ||||||
| 1.00 | OD444843/2025-2026: DR Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m derived from 60.7.3 | 8.1 | cum | 695.8 ₹5,635.98 | 674.72 ₹5,465.23 | 681.19 ₹5,517.64 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 21.56 | cum | 330.41 ₹7,124.63 | 320.4 ₹6,908.79 | 323.47 ₹6,974.98 |
| 1.00 | OD444844/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 36.02 | cum | 3,668.07 ₹1.3 L | 3,556.93 ₹1.3 L | 3,591.04 ₹1.3 L |
| 1.00 | OD451387/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble using department rubble stacked in site including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 4.05 | cum | 1,576.07 ₹6,383.08 | 1,528.32 ₹6,189.70 | 1,542.97 ₹6,249.03 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.95 | cum | 8,483.41 ₹16,542.65 | 8,226.36 ₹16,041.40 | 8,305.26 ₹16,195.26 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 86.2 | sqm | 354.69 ₹30,574.28 | 343.94 ₹29,647.63 | 347.24 ₹29,932.09 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 2.1 | cum | 7,286.51 ₹15,301.67 | 7,065.73 ₹14,838.03 | 7,133.49 ₹14,980.33 |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 22.12 | cum | 7,683.01 ₹1.7 L | 7,450.21 ₹1.6 L | 7,521.67 ₹1.7 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 188.53 | kilogram | 103.26 ₹19,467.19 | 100.13 ₹18,877.11 | 101.09 ₹19,058.09 |
Updated dates
Tender Value
₹4.2 L
EMD Value
₹10,588
Closing Date
25 Feb 2026, 9:00 amClosed
AEE Vengara BP
Office of the Assistant Executive Engineer, LID EW Sub division, Vengara Block Panchayat
Annual Plan-Vengara BP Project No.39-2025-26 Side Protection to moochithara Thodu-2nd reach-Thennala GP-General Civil Work
2026_LSGD_835963_3
4/AEE/VGA/TN/2025-26-1
Open Tender
Civil Works - Others
Vengara BP
Please refer Tender documents.
6 documents required · 6 mandatory
₹935
Yes
₹10,588
Yes
Vengara BP
26 Mar 2026
13 Feb 2026
25 Feb 2026
13 Feb 2026
25 Feb 2026
13 Feb 2026
13 Feb 2026
thodu protection
OD444843/2025-2026: DR Dismantling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m derived from 60.7.3
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD444844/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD451387/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble using department rubble stacked in site including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD451386/2025-2026:(OD from DAR 60.6) PVC weep holes - Providing weep holes using 75mm dia PVC pipes working pressure 4Kg/sqcm including cost of materials ,conveyance and labour charges etc complete
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
OD444856/2025-2026:Providing and fixing Granite of any colour and shade for Name board, of required size laid over base of cement mortar 1:4 ( 1 cement : 4 coarse sand), including all charges etc. complete at all, levels, including lettering & fixing
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1407009.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.29 MB
SBD.pdf
Tender Documents • 1.80 MB
PA.pdf
Tender Documents • 0.26 MB
FOT.pdf
Other Document • 0.25 MB
Estimate.pdf
Additional Documents • 0.04 MB
Common.pdf
Other Document • 0.34 MB
BDFEE.pdf
Tender Documents • 0.34 MB
BOQ_1407009.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid