Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.6 LAccepted-AOC | ₹18.6 L | L1 | Accepted-AOC L1Bidder |
| 2 | L2₹18.6 LRejected-Finance | ₹18.6 L | L2 | Rejected-Finance Second Lowest bidder |
| 3 | L3₹18.6 LRejected-Finance | ₹18.6 L | L3 | Rejected-Finance Third Lowest bidder |
| 4 | L4₹21.5 LRejected-Finance GSTIN: 30AFEPG8218H1ZUH NO 18 272 SHIRWAI QUEPEM GOA | QUEPEM | SOUTH GOA | GOA | ₹21.5 L | L4 | Rejected-Finance Fourth Lowest bidder |
| Sl No | Description | Qty | Unit | Manju Shankar Gavli L3 | HEERU PANDU RATHOD L2 | SHABNAM CONSTRUCTIONS L1 | M/s. Bitcon L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolishing R.C.C. work including stacking of steel bars & disposal of unserviceable within 50 mts. lead. | 16 | Cum | 1,504 ₹24,064 | 1,294.41 ₹20,710.56 | 799.62 ₹12,793.92 | 1,000.05 ₹16,000.80 |
| 2.00 | Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, silt clay, gravel, moorum of all verieties shingles, pebbles, all types of conglomarets ,laterite rock,soft rock, disintegrated or weathered rock, fissured shattered, decomposed rock, and such materials either in full or parts,as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling,wedging etc. but blasting prohibited in all conditions such as dry, moist,saturated,submerged,foul conditions etc. including pumping or bailing out water/ dewatering including setting out constructed of shoring and bracing, removel of stump and other deleterious matter, dressing of sides and bottom and back filling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas within a 50m lead and with all lifts etc. as per specification & drawing and directed by Engineer-in -Charge etc. complete. | 108 | Cum | 265 ₹28,620 | 228.8 ₹24,710.40 | 149.99 ₹16,198.92 | 150 ₹16,200 |
| 3.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 12 | Cum | 2,056 ₹24,672 | 1,768.82 ₹21,225.84 | 950.03 ₹11,400.36 | 900.16 ₹10,801.92 |
| 4.00 | Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete. | 180 | Sq.m | 379 ₹68,220 | 325.6 ₹58,608 | 300.25 ₹54,045 | 280 ₹50,400 |
| 5.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level | 69 | Cum | 6,333 ₹4.4 L | 5,448 ₹3.8 L | 4,999.01 ₹3.4 L | 5,200.03 ₹3.6 L |
| 6.00 | Centering & shuttering including Strutting, Propping & removal of forms for : xiii) Suspended floors, roofs landings, shelves & their supports | 210 | Sq.m | 599 ₹1.3 L | 515.2 ₹1.1 L | 499.93 ₹1.0 L | 293.1 ₹61,551 |
| 7.00 | Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinforcement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) c) In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level | 65 | Cum | 7,541 ₹4.9 L | 6,487.2 ₹4.2 L | 6,358.05 ₹4.1 L | 8,510.01 ₹5.5 L |
| 8.00 | Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RexcavationexCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.(@ 120kg per cum ) | 7,800 | Kg | 80 ₹6.2 L | 69.6 ₹5.4 L | 79.01 ₹6.2 L | 65 ₹5.1 L |
Tender Value
₹23.2 L
EMD Value
₹46,430
Closing Date
22 Oct 2024, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Improvement to existing nallah with slab covering from the Holy Cross Chappel to Diago House, Vinni Fernandes, Santosh Salgaonkars house and other at Freitas Vaddo in V.P. Verla Canca in Siolim Constituency.
2024_WRD_17886_1
6-9/WDI/WRD/ASW/2024-25/e-14/2
Open Tender
Miscellaneous Works
60 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹46,430
25 May 2026
15 Oct 2024
23 Oct 2024
15 Oct 2024
22 Oct 2024
15 Oct 2024
Amount
Demolishing R.C.C. work including stacking of steel bars & disposal of unserviceable within 50 mts. lead.
Earthwork in excavation by mechanical means in all types of strata comprising any of the materials such as soil, sand, silt clay, gravel, moorum of all verieties shingles, pebbles, all types of conglomarets ,laterite rock,soft rock, disintegrated or weathered rock, fissured shattered, decomposed rock, and such materials either in full or parts,as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling,wedging etc. but blasting prohibited in all conditions such as dry, moist,saturated,submerged,foul conditions etc. including pumping or bailing out water/ dewatering including setting out constructed of shoring and bracing, removel of stump and other deleterious matter, dressing of sides and bottom and back filling the excavated earth to the extent required and disposal of excavated soil/rock at specified areas within a 50m lead and with all lifts etc. as per specification & drawing and directed by Engineer-in -Charge etc. complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering and shuttering including struttings, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Centering & shuttering including Strutting, Propping & removal of forms for : xiii) Suspended floors, roofs landings, shelves & their supports
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinforcement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) c) In beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases upto floor five level
Providing High yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (Confirming to IS 1786 of 1986) for RexcavationexCC work including bending, binding & placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive strength is not less than that of surrounding concrete in the structural member.(@ 120kg per cum )
M/s. Bitcon (BID ID -39324)
HEERU PANDU RATHOD (BID ID -39348)
Manju Shankar Gavli (BID ID -39370)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid