Tender Value
₹98.3 L
EMD Value
₹2.0 L
Closing Date
8 Jul 2026, 5:00 pmDue today
EE RWD WORK DIVISION DHANBAD
EE RWD WORK DIVISION DHANBAD
Construction of Approach Road to Tundi Degree College (L- 0.364 KM.)
2026_RWD_115513_1
05/RWD/DHANBAD/26-27
Open Tender
Civil Works - Roads
180 days
DHANBAD
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹2.0 L
23 Jun 2026
23 Jun 2026
10 Jul 2026
23 Jun 2026
8 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 | 0.45 | Ha | 19,760.3 | ₹8,892.14 |
| 2 | Compacting original ground supporting sub-grade ( Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction.) | 670.81 | M3 | 52.6 | ₹35,284.61 |
| 3 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 1,774.35 | M3 | 131.3 | ₹2,32,972.16 |
| 4 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 1)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
With Grading-I Material | 667.6 | M3 | 2,541.81 | ₹16,96,912.36 |
| 5 | Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 859.04 | M3 | 6,500.74 | ₹55,84,395.69 |
| 6 | Direction and Place Identification signs with size more than 0.9 sqm size board (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing) | 1 | Nos | 13,704.3 | ₹13,704.3 |
| 7 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | 94.78 | M3 | 55.8 | ₹5,288.72 |
| 8 | Construction of dry rubble flooring at cross drainage works for relatively less important works. | 11.36 | M3 | 2,545.13 | ₹28,912.68 |
| 9 | Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications.
(P.C.C. Grade M-15) | 14.93 | M3 | 4,867.87 | ₹72,677.3 |
| 10 | Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.
Square Rubble Coursed Rubble Masonry (1st sort) in C.M. (1:3) | 55.15 | M3 | 4,857.88 | ₹2,67,912.08 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
DegreeSBD.pdf
Tender Documents • 0.97 MB
BOQ_156208.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid