| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.0 LAccepted-AOC HOUSE NO 517 2 EE NEAR CHAPEL QUEPEM GOA | SOUTH GOA | GOA | 403103 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹15.7 L+₹1.6 L (11.6%)Rejected-Finance | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹18.0 L+₹4.0 L (28.2%)Rejected-Finance | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹18.2 L
EMD Value
₹36,360
Closing Date
1 Jan 2022, 4:00 pmClosed
EE II, WRD
Aquem Baixo Rawanfond
Construction of Flood protection wall for the Verna Lake at Ambulor in V.P Verna in Nuvem Constituency of Salcete Taluka.
2021_WRD_2335_1
ASW/F.17/42(e)/2021-22/Sr.No.2
Open Tender
Miscellaneous Works
Item Rate
60 days
Rawanfond
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹36,360
21 Mar 2022
22 Dec 2021
3 Jan 2022
22 Dec 2021
1 Jan 2022
22 Dec 2021
Amount
Earthwork in excavation by mechanical / manual means in all types of strata comprising any of the materials such as soil, sand, silt, clay, gravel, moorum of all varieties, shingles, pebbles, all types of conglomerates, laterite rock, soft rock, disintegrated rock, fissured/shattered, decomposed rock or weathered rock and all such other materials either in full or in parts as the case may be adopting any approved method or methods as may be convenient or permitted including chiseling, wedging etc. excluding blasting in all conditions such as dry, moist, saturated, submerged, foul conditions etc. including setting out construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavated earth to the extent required and disposing the remaining excavated soil / rock as directed by Engineer in Charge for all leads and in all lifts as specified & directed etc. complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Centering and shuttering including strutting, propping etc. and removal of formwork for : a) Foundations, footings, bases for columns and mass concrete.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge. (b) 75 mm dia
francisco dcosta
PAN CONSTRUCTION
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .