Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-AOC | ₹27.9 L | L1 | Accepted-AOC ACCEPTED |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | I SAFARUDEEN L2 | SHAJI BHADRAN L1 |
|---|---|---|---|---|---|
| 1.00APPENDIX A - CONCRETE ROAD | |||||
| 1.00 | 3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br> | 14.61 | cum | 65 ₹949.65 | 57 ₹832.77 |
| 1.00 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 219.22 | cum | 7,000 ₹15.3 L | 6,000 ₹13.2 L |
| 1.00 | 12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br> | 146.15 | cum | 8,000 ₹11.7 L | 7,000 ₹10.2 L |
| 2.00APPENDIX B DR RETAINING WALL | |||||
| 2.00 | 3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 41.4 | cum | 55 ₹2,277 | 45 ₹1,863 |
| 2.00 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br> | 3.45 | cum | 9,000 ₹31,050 | 8,000 ₹27,600 |
| 2.00 | OD267629/2025-2026:Dry Rubble Masonery work for Foundation and Plith of Retaining wall etc complete | 99.36 | cum | 4,050 ₹4.0 L | 4,000 ₹4.0 L |
| 2.00 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 0.26 | MT | 95,000 ₹24,605 | 90,000 ₹23,310 |
Tender Value
₹33.8 L
EMD Value
₹50,000
Closing Date
4 Mar 2026, 3:15 pmClosed
The Exceutive Engineer
The Exceutive Engineer PWD Roads Division Kollam
GENERAL- Budget work 2025-26 Connectivity Roads under Kottarakkara LACStretch 1-Chanthoor Aganawadi -Mahavishnu temple Road - General Civil Work-1
2026_PWD_840144_1
114/EE/ET/2025-26
Open Tender
Civil Works - Roads
180 days
Kollam
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
24 Mar 2026
24 Feb 2026
6 Mar 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
APPENDIX A - CONCRETE ROAD
3.13.1.B:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.1.C:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer - (Without formwork) <br>
APPENDIX B DR RETAINING WALL
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>
OD267629/2025-2026:Dry Rubble Masonery work for Foundation and Plith of Retaining wall etc complete
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1416052.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1416052.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid