Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 LAccepted-AOC | ₹3.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹3.7 L+₹21,293.24 (6.12%)Rejected-AOC | ₹3.7 L+₹21,293.24 (6.12%) | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | ALBERT CHERIAN L1 | ANANTHU M S L2 |
|---|---|---|---|---|---|
| 1.00pre monsoon | |||||
| 1.00 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br> | 0.25 | Hectare | 50,000 ₹12,500 | 44,441.3 ₹11,110.33 Lowest |
| 1.00 | 2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. <br> Girth from 900 mm to 1800 mm | 10 | each | 5,000 ₹50,000 | 2,227.4 ₹22,274 Lowest |
| 1.00 | OD53702/2026-2027:Emulsion patch work including all cost and conveyance of graded metal ( 36mm, 12mm. 6mm) , Emulsion (RS). rolling ,Laboure charges etc | 2.16 | cum | 7,500 ₹16,200 Lowest | 32,888.2 ₹71,038.51 |
| 1.00 | OD53703/2026-2027:Filling up potholes with bituminous ready mix compound ( 25 kg bag) and compacting by ramming to get a compact surface after applying bituminous priming coat measured separately including cost of material, laying charges, transportation to site etc.complete rate is arrived for abag of 25 kg | 120 | no | 700 ₹84,000 | 655.5 ₹78,660 Lowest |
| 1.00 | OD53704/2026-2027:Labour engaged for cleaning of chocked culverts and Drain | 82 | each | 1,100 ₹90,200 | 992 ₹81,344 Lowest |
| 1.01 | OD53705/2026-2027:Hire charge for tipper for removing the materials to the dumping place | 56 | hour | 600 ₹33,600 Lowest | 720.9 ₹40,370.4 |
| 1.01 | OD53706/2026-2027:hire charges of jcb | 56 | hour | 1,100 ₹61,600 Lowest | 1,153.5 ₹64,596 |
Tender Value
₹4.2 L
EMD Value
₹10,585
Closing Date
24 Jun 2026, 11:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer, PWD Roads Subdivision, Perumbavoor
clearing chocked up culverts and drains, clearing jungle,cutting dangerous trees etc
2026_PWD_856490_1
PWD/RB/TR/9541/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
180 days
Under Kuruppampady Section
Please refer Tender documents.
9 documents required · 9 mandatory
₹935
Yes
₹10,585
Yes
29 Jul 2026
18 Jun 2026
26 Jun 2026
18 Jun 2026
24 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1pre monsoon | |||||
| 1.001 | 2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness <br> In area of light jungle - By Mechanical Means<br> | - | Hectare | - | - |
| 1.002 | 2.1.3:Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression/pit. <br> Girth from 900 mm to 1800 mm | - | each | - | - |
| 1.003 | OD53702/2026-2027:Emulsion patch work including all cost and conveyance of graded metal ( 36mm, 12mm. 6mm) , Emulsion (RS). rolling ,Laboure charges etc | - | cum | - | - |
| 1.004 | OD53703/2026-2027:Filling up potholes with bituminous ready mix compound ( 25 kg bag) and compacting by ramming to get a compact surface after applying bituminous priming coat measured separately including cost of material, laying charges, transportation to site etc.complete rate is arrived for abag of 25 kg | - | no | - | - |
| 1.005 | OD53704/2026-2027:Labour engaged for cleaning of chocked culverts and Drain | - | each | - | - |
| 1.006 | OD53705/2026-2027:Hire charge for tipper for removing the materials to the dumping place | - | hour | - | - |
| 1.007 | OD53706/2026-2027:hire charges of jcb | - | hour | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1447688.xls
BOQ • 0.30 MB
viewsbd.pdf
Tender Documents • 1.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .