| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.2 LAdmitted-Fee/PreQual/Technical/Finance | -41.33% | ₹32.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹32.8 L+₹66,873.12 (2.08%)Admitted-Fee/PreQual/Technical/Finance | -40.11% | ₹32.8 L+₹66,873.12 (2.08%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹32.9 L+₹73,450.80 (2.28%)Admitted-Fee/PreQual/Technical/Finance | -39.99% | ₹32.9 L+₹73,450.80 (2.28%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹33.4 L+₹1.2 L (3.77%)Admitted-Fee/PreQual/Technical/Finance | -39.12% | ₹33.4 L+₹1.2 L (3.77%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹33.6 L+₹1.4 L (4.36%)Admitted-Fee/PreQual/Technical/Finance | -38.77% | ₹33.6 L+₹1.4 L (4.36%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹54.8 L
EMD Value
₹1.1 L
Closing Date
19 Aug 2026, 4:00 pmClosed
Executive Engineer RnB Division Ganderbal
Executive Engineer RnB Division Ganderbal
Lavatory Blocks at Different Grounds at GCOPE, Ganderbal
2026_PWDJK_320878_1
NIT No.50-2026-27
Open Tender
Civil Works
Percentage
180 days
Ganderbal
as per NIT
2 documents required · 2 mandatory
₹1,600
Executive Engineer RnB Division Ganderbal
₹1.1 L
27 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
19 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 150.65 | Cum | 256.85 | ₹38,694.45 |
| 2 | P/L, of dry stone soling duly hand packed for foundation and backfilling with ramming, dressing, and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete. | 40.62 | Cum | 950 | ₹38,589 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) all complete. | 18.36 | Cum | 5,202.9 | ₹95,525.24 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) all complete. | 37.47 | Cum | 7,788.4 | ₹2,91,831.35 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) all complete. | 50.16 | Cum | 6,591.25 | ₹3,30,617.1 |
| 6 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : 1:6 ( 1 cement : 6 coarse sand) including Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level all complete. | 31.71 | Cum | 9,027.2 | ₹2,86,252.51 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : 1:6 ( 1 cement : 6 coarse sand) all complete. | 6.58 | Cum | 7,571.55 | ₹49,820.8 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) complete. | 10.66 | Cum | 9,821.85 | ₹1,04,700.92 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 5,775.98 | Kgs | 123.2 | ₹7,11,600.74 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. | 160.97 | Sqm | 286.35 | ₹46,093.76 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1068187.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .