| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 CrAccepted-AOC | ₹8.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹8.7 Cr+₹26.6 L (3.16%)Rejected-AOC | ₹8.7 Cr+₹26.6 L (3.16%) | L2 | Rejected-AOC L2 |
| 3 | L3₹9.7 Cr+₹1.3 Cr (15.0%)Rejected-AOC | ₹9.7 Cr+₹1.3 Cr (15.0%) | L3 | Rejected-AOC L3 |
Tender Value
₹9.1 Cr
EMD Value
₹2 L
Closing Date
17 Aug 2022, 5:00 pmClosed
Managing Director, KINFRA
KINFRA HOUSE,TC 31/2312 SASTHAMANGALAMThiruvananthapuram
Development of Electronic Manufacturing Cluster EMC area at KEPIP, Kakkanad
2022_KINFR_501862_1
KINFRA/EMC/18/2022-23
Open Tender
Civil Works - Others
Item Rate
540 days
EMC, kakkanad
As per NIT
2 documents required · 2 mandatory
₹11,800
₹2 L
Hi Tech Park Kalamasserry
10 Oct 2022
2 Aug 2022
22 Aug 2022
2 Aug 2022
17 Aug 2022
10 Aug 2022
10 Aug 2022
Amount
STORM WATER DRAIN : RUBBLE MASONRY
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Earth work excavation for foundation in in all classes of soil other than rock including under water excavation where ever required ,conveying and dumping the excavated soil or liquid mud in convenient places with all leads and lifts including filling the lower portions / undulations if necessary including charges for bailing out water using required capacity pumps if found required and levelling the earth to correct profile, breaking clods , watering ramming etc. complete.
Dry stone pitching 22.5 cm thick including supply of stones and<br>preparing surface complete.
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
15.3 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.<br>140 mm dia PVC 6KSC to 225 mm dia PVC 6KSC
CONSTRUCTION OF DUCT - 600 m length on the side of existing road
15.24 Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material with in 50 metes lead:
15.40.2 Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:Thickness above 40 mm upto 75 mm
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
15.43.2 Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
15.58 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars.
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.36 Providing and placing in position precast reinforced cement concrete waffle units, square or rectangular as per design and shape for floors and roofs in 1:11/2:3 ( 1 cement : 1 1/2 coarse sand : 3 graded stone aggregate 10 mm nominal size), including flush or deep ruled pointing at joints in cement mortar 1:2 (1 cement : 2 Fine sand), making necessary holes of required sizes for carrying through service lines etc., providing steel hooks for lifting etc, form work in precasting, handling, hoisting, centering and erection complete for all floor levels but excluding the cost of reinforcement .
13.35.1 Pointing on stone slab ceiling with cement mortar 1:2 ( 1 cement : 2 fine sand):Flush / Ruled pointing
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
13.18 Neat cement punning
13.4.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
10.25.2 Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
CONSTRUCTION OF ROAD : 7m wide T road with side drain and cable duct
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
Earth work excavation for foundation in in all classes of soil other than rock including under water excavation where ever required ,conveying and dumping the excavated soil or liquid mud in convenient places with all leads and lifts including filling the lower portions / undulations if necessary including charges for bailing out water using required capacity pumps if found required and levelling the earth to correct profile, breaking clods , watering ramming etc. complete.
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.36 Providing and placing in position precast reinforced cement concrete waffle units, square or rectangular as per design and shape for floors and roofs in 1:11/2:3 ( 1 cement : 1 1/2 coarse sand : 3 graded stone aggregate 10 mm nominal size), including flush or deep ruled pointing at joints in cement mortar 1:2 (1 cement : 2 Fine sand), making necessary holes of required sizes for carrying through service lines etc., providing steel hooks for lifting etc, form work in precasting, handling, hoisting, centering and erection complete for all floor levels but excluding the cost of reinforcement .
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
13.18 Neat cement punning
4.1.3 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
15.3 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Lowering PVC rigid pipes and specials to trench and laying to proper grade and alignment, jointing with PVC couplers with cement paste.<br>140 mm dia PVC 6KSC to 225 mm dia PVC 6KSC
15.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.
16.1 Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres.
16.91.2 Providing and laying factory made chamfered edge Cement Concrete paver blocksin footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,thickness & size/ shape, made by table vibratory method using PU mould, laid inrequired colour & pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sand bedding layerthrough vibratory compaction by using plate vibrator, filling the joints with sand andcutting of paver blocks as per required size and pattern, finishing and sweepingextra sand. complete all as per direction of Engineer-in-Charge.80 mm thick C.C. paver block of M-30 grade with approved color design and pattern.
15.24 Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material with in 50 metes lead:
13.4.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
13.61.1 Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
10.25.2 Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
19.6.4 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete:300 mm dia R.C.C. pipe
Supplying, stacking & filling quarry sand in standard profile, for stack measurement and pipe laying <br>without causing any hindrance of traffic etc. as directed by the Engineer-in-charge at site including all leads<br>and lifts, cost and conveyance of all materials etc. complete as directed by the Engineer- in - Charge.
ROAD - 7 m wide T Road
4.1.A.1 Construction of granular sub-base by providing graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 Grading-I - Plant Mix Method
4.12 Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
CONSTRUCTION OF CULVERT : 4 NoS.
15.43.2 Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
15.24 Demolishing dry brick pitching in floors, drains etc. including stacking serviceable material and disposal of unserviceable material with in 50 metes lead:
15.40.2 Dismantling precast concrete or stone slabs in walls, partition walls etc. including stacking within 50 metres lead:Thickness above 40 mm upto 75 mm
15.58 Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars.
15.5 Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work ( Payment shall be made on the cross sectional area of R.C.C. or R.B work) as per direction of Engineer-in-charge.
5.2.2 Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
13.4.1 12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
11.20.1 Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete on 20 mm thick bed of cement mortar 1:4 ( 1 cement : 4 coarse sand).Light shade pigment using white cement
20.3.1 Boring, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M -25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap):300 mm dia piles
20.2.1 Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).300 mm dia piles
20.6.1.2 Vertical load testing of piles in accordance with IS 2911( Part IV) including installation of loading platform and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of engineer -in-Charge.Single pile upto 50 tonne capacityRoutine test
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.33.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
19.36.1 Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes includingcollars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2(1 cement : 2 fine sand) including testing of joints etc. complete.450 mm dia RCC pipes.
2.27 Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.
GATE AND SECURITY CABIN
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
2.27 Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.6 Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and struts
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.33.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
5.33.2 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work above plinth level upto floor V level
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
10.16.1 Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
10.19 Providing and fixing mild steel round holding down bolts with nuts and washer plates complete.
Providing and Fixing of Security Cabin of Concrete platform size- 2.4 x 2.1 x 0.20m, Cabin size - 1.80 x 1.50x1.90m Height (Average)<br>with Powder coated Aluminium (4” x 1.5”) with Aluminium Glazed Door and Window with Lock & Key and Aluminium Corrugated Roofing sheet / zinc-Alum Sheet Back side and Bottom side Cabin Hilum sheet with all necessary electrical fittings with switches for 1 tube light , 2 socket pins, and a fan point as per the direction of Engineer in Charge
CONSTRUCTION OF COMPOUND WALL
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.27 Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming consolidating and dressing complete.
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
7.1.1 Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22A.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
16.19 Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
16.71 Providing and fixing G.I. chain link fabric fencing of required width in mesh size 25x25 mm made of G.I wire of dia 3 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer - in- Charge.
FOUNDATION WORKS FOR ELECTRICAL
20.2.1 Boring, providing and installing bored cast-in-situ reinforced cement concrete piles of grade M-25 of specified diameter and length below the pile cap to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring, with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. all complete, including removal of excavated earth with all lifts and leads (Length of pile for payment shall be measured upto bottom of pile cap).300 mm dia piles
Boring, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M -25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap):300 mm dia piles
15.3 Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.5 Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.6 Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
5.33.1 Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. Note:- Cement content considered in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is payable or recoverable separately.All work upto plinth level
2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.8.1 Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.3.1 Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.2 Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
13.16.1 6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
10.25.2 Item Shifted to head 14 as item 14.74Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
Supply of Treated Water from KEPIP to EMC
2.32 Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m including charges for bailing out water using required capacity pumps if found required and levelling the earth to correct profile, breaking clods , watering ramming etc. complete.
2.6.1 Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.7.1 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Ordinary rock
2.7.3 Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited
2.26.1 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
2.26.2 Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.Ordinary or hard rock
Filling available excavated earth in(excluding rock) trenches, under floors,plinth,sides of foundation,in areas etc. in layers not exceeding 20cm in depth,consoldating each deposited layer by ramming and watering,lead upto 50m and lift upto 1.5m including cost and conveyance of all materials,labour charges, etc complete at all levels as directed by the Engineer-in-Charge
18.72.5 Providing and laying S & S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS : 8329:300 mm dia Ductile Iron CLass K-7 pipes
100.35.5 Testing 300mm DI/CI pipeline with potable water to the required test pressure. 300 mm dia Observed Data derived from item no.1023 of PHED DATA
18.68.1 Providing and laying D.I specials of class K - 12 suitable for push - on jointing as per IS : 9523 :Upt 600 mm dia
18.30.7 Providing flanged joints to double flanged C.I./ D.I pipes and specials, including testing of joints:300 mm diameter pipe
18.69.1 Providing and laying D.I Specials of Class K - 12 suitable for mechanical jointing as per IS : 9523 :Upto 600 mm dia
18.70.5 Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:300 mm dia pipe
Supplying & spreading quarry sand for filling in standard profile, without causing any hindrance of traffic as directed by the Engineer-in-charge at site including all leads and lifts, cost and conveyance of all materials etc. complete as directed by the Engineer- in -Charge.
Cutting of DI pipes of all classes diametrically, the cut being diametrically perpendicular<br>to the axis of pipe and smoothening the cut ends, etc. complete -: 300 mm
Providing and fixing ISI marked C.I. sluice valves with cap or wheel (with caps below ground level and with wheels above ground level as the case may be) complete with bolts, nuts, rubber insersions etc. PN 1.6 as per IS 14846 : 2000 - 300 mm(Multi door)
Providing and fixing ISI marked C.I. double acting air valve of approved quality with isolation valves as<br>per IS 14845 : 2000 - 100 mm dia
4.1.8 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
5.37.1 Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All wiork upto plinth level
5.22.6 Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1 Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.2 Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
5.9.3 Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
WATER SUPPLY LINES
"Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching, bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours ,providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)<br>200mm dia 6kgf/cm2
"Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching, bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)<br>160mm dia 6kgf/cm2
"Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching,bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)<br>110mm dia 6kgf/cm2
Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching, bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)<br>90mm dia 6kgf/cm2
Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching, bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)75 mm dia 6kgf/cm2
"Supply and fixing IS 4985:2000 unplasticized PVC pipes and specials at a depth of 1m including trenching,bedding of soil, lowering to trenches, placing in position, aligning the pipe line to line and levels, jointing the pipes and specials with solvent cement, refilling the trenches after removing rocks if any and testing the pipe line to a pressure of 3kg/cm2 or twice the maximum working pressure which ever is greater, maintaining the test pressure for least 6 hours, providing thrust / anchor blocks at all bends, reducer, Tee, valves etc complete as specified and directed by engineer in charge. (Distribution line)63 mm dia 6kgf/cm2
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 50 mm (PN - 1.0) flanged end
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 65 mm (PN - 1.0) flanged end
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 80 mm (PN - 1.0) flanged end
Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 100 mm (PN - 1.0) flanged end
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 150 mm (PN - 1.0) flanged end
"Providing and fixing CI sluice valve conforming to IS : 14846 hand wheel operated, Non rising stainless steel stem with gunmetal parts : 200 mm (PN - 1.0) flanged end
"Providing and fixing CI Y type strainer : 200 mm (PN - 16) flanged end
"Providing and fixing Forged brass Air release valve of approved quality (screwed end) : 25 mm diameter
Constructing masonry chamber 90x90x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep (inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand: 4 graded stone aggregate 20 mm nominal size), i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand: 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design:With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
Constructing masonry chamber 60x45x50 cm inside, in brick work in cement mortar 1:4 ( 1 cement : 4 coarse sand) for water meter complete with C.I double flap surface box 400x200x200 mm ( inside ) with locking arrangement and RCC top slab 1:2:4 mix ( 1 cement : 2 coarse sand : 4 grades stone aggregate 20 nominal size), i/c necessary excavation, foundation concrete 1:5:10 ( 1 cement : 5fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 ( 1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design:With common burnt clay F.P.S. ( non modular ) bricks of class designation 7.5
18.60.4 Providing and fixing enclosed type water meter (bulk type) conforming to IS: 2373 and tested by Municipal Board complete with bolts, nuts, rubber insertions etc. ( The tail pieces if required will be paid separately):200 mm dia nominal bore
Supply and fixing of Ductile iron flanged puddle pipe of 1m length in tank slab/wall and in plane verticaly and horizontally with necessary projection to the outside as instructed by the site engineer in charge : 65 mm inner diameter
Supply and fixing of Ductile iron flanged puddle pipe of 1m length in tank slab/wall and in plane verticaly and horizontally with necessary projection to the outside as instructed by the site engineer in charge : 100mm inner diameter
Supply and fixing of Ductile iron flanged puddle pipe of 1m length in tank slab/wall and in plane verticaly and horizontally with necessary projection to the outside as instructed by the site engineer in charge : 200mm inner diameter
Supply and fixing 65 mm DI Flanged Mechanical Adapter suitable for 75 mm PVC pipe in position.
Supply and fixing 100mm DI Flanged Mechanical Adapter suitable for 110 PVC pipe in position.
Supply and fixing 200mm DI Flanged Mechanical Adapter suitable for 200 PVC pipe in position.
Supply,erection, testing, commissioning of 200 mm PVC 6Kgf connection from main water supply line including excavation, cutting main pipe, providing CI detachable joints (CID) on either ends and Tee including supply of materials and labour and refilling the pit with soil, complete.
19.32.1 Making soak pit 2.5 m diameter 3.0 metre deep with 45 x 45 cm dry brick honey comb shaft with bricks and S.W. drain pipe 100 mm diameter, 1.8 m long complete as per standard design.With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
18.72.3 Providing and laying S & S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS : 8329:200 mm dia Ductile Iron Class K-7 pipes
Supplying & spreading quarry sand for filling in standard profile, without causing any hindrance of traffic as directed by the Engineer-in-charge at site including all leads and lifts, cost and conveyance of all materials etc. complete as directed by the Engineer- in -Charge.
SITCOASSOCIATES
Kanjiramkunnel Constructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .