Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC VILLAGE GOLHUIEN PO KILOD TEHSIL DISTT CHAMBA HP | CHAMBA | CHAMBA | HIMACHAL PRADESH | ₹7.5 L | L1 | Accepted-AOC Stand as L1 |
| 2 | L2₹8.9 L+₹1.4 L (18.2%)Rejected-AOC VILLAGE PO BANIKHET TEHSIL DALHOUSIE DISTT CHAMBA HP | ₹8.9 L+₹1.4 L (18.2%) | L2 | Rejected-AOC Stand as L2 |
| 3 | L3₹8.9 L+₹1.4 L (18.7%)Rejected-AOC | ₹8.9 L+₹1.4 L (18.7%) | L3 | Rejected-AOC Stand as L3 |
| 4 | L4₹9.0 L+₹1.5 L (19.8%)Rejected-AOC | ₹9.0 L+₹1.5 L (19.8%) | L4 | Rejected-AOC Stand as L4 |
| Sl No | Description | Qty | Unit | SONU GOVT. CONTRACTOR L3 | Abhinav L2 | Kamlesh Kumar L1 | Balvinder Singh L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Removal of slips in all kinds of soil (including saturated soil but excluding boulders and rocky portion requiring blasting upto a distance of 20 metres dosposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface. | 186.9 | CUM | 610 ₹1,34,530.62 | 410 ₹90,422.22 | 280 ₹61,751.76 Lowest | 1,350 ₹2,97,731.7 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 71.31 | CUM | 490 ₹41,231.44 | 210 ₹17,670.62 | 150 ₹12,621.87 Lowest | 450 ₹37,865.61 |
| 4.00 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 23.7 | SQM | 650 ₹18,177.9 | 500 ₹13,983 | 500 ₹13,983 | 350 ₹9,788.1 Lowest |
| 5.00 | P/L 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 28.35 | CUM | 8,500 ₹2,84,350.5 | 9,000 ₹3,01,077 | 9,000 ₹3,01,077 | 7,500 ₹2,50,897.5 Lowest |
| 6.00 | Providing & making Crate work/Gabion structure with Mechanically Woven Double Twisted Hexagonal /rectangular Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge | 109.38 | CUM | 3,200 ₹4,13,018.88 | 3,600 ₹4,64,646.24 | 2,800 ₹3,61,391.52 | 2,350 ₹3,03,310.74 Lowest |
Tender Value
Refer Docs
EMD Value
₹17,471
Closing Date
5 May 2026, 5:00 pmClosed
SENIOR MANAGER HPPTCL PIU CHAMBA
SENIOR MANAGER HPPTCL PIU CHAMBA
Restoration of Protection work at Leg A and B of Tower location 38 of 220KV Transmission line Holi Bajoli Lahal
2026_HPPTC_135228_1
HPPTCL/Sr.Manager (P)/Tenders/Chamba/2025-26/16
Open Tender
Miscellaneous Services
Item Rate
Ratten Village Bharmour
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
₹17,471
Yes
21 Aug 2026
28 Apr 2026
6 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
28 Apr 2026 - 5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removal of slips in all kinds of soil (including saturated soil but excluding boulders and rocky portion requiring blasting upto a distance of 20 metres dosposing of un-serviceable materials, stacking serviceable materials and neatly dressing the surface. | 186.9 | CUM | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 71.31 | CUM | - | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 23.7 | SQM | - | - |
| 5 | P/L 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 28.35 | CUM | - | - |
| 6 | Providing & making Crate work/Gabion structure with Mechanically Woven Double Twisted Hexagonal /rectangular Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12 (D=100 mm with tolerance of ± 2%) Zinc coated, Mesh wire diameter 3.0 mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2mm, supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-charge | 109.38 | CUM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
AlltenderdocT38.pdf
Tender Documents • 0.88 MB
BOQ_200284.xls
BOQ • 0.28 MB
CorrigendumT38.pdf
PDF • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .