Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹55.6 L+₹47,284.69 (0.86%)Admitted-Finance DOOR NO 2 859J KBNSS LTD BUILDING II FLLOOR ERANHIPALAM P O KOXHIKODE 673006 | KOZHIKODE | KERALA | 673006 | L2 | Admitted-Finance | |
| 3 | L3₹59.0 L+₹3.8 L (6.98%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹59.0 L+₹3.9 L (7.12%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹61.0 L+₹5.8 L (10.6%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Madhu Kumar V P L7 | ABDURAHIMAN PP L12 | Roshin.A.K L10 | SALIH N M L8 | TECTONICS ENGINEERING PROJECTS L2 | L&M INFRA BUILDERS L5 | U.SHOUKATHALI L1 | RYLAND BUILDERS AND DEVELOPERS L11 | PRAMOD V L9 | ABDUL BASITH M K L3 | AJMAL ROSHAN P L6 | MUHAMMAD NOWFAL N A L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00YARD WORK | |||||||||||||||
| 1.00 | OD129902/2026-2027:JCB engaged for cutting and leveling the yard | 16 | hour | 1,340 ₹21,440 | 1,700 ₹27,200 | 1,256.8 ₹20,108.8 | 3,750 ₹60,000 | 1,250 ₹20,000 | 1,500 ₹24,000 | 1,360 ₹21,760 | 1,600 ₹25,600 | 1,100 ₹17,600 Lowest | 1,388.1 ₹22,209.6 | 3,500 ₹56,000 | 1,389.92 ₹22,238.72 |
| 1.00 | OD129916/2026-2027:Arrange labour for cleaning premisses | 10 | each | 900 ₹9,000 Lowest | 1,000 ₹10,000 | 1,200 ₹12,000 | 1,250 ₹12,500 | 1,050 ₹10,500 | 1,000 ₹10,000 | 1,050 ₹10,500 | 1,200 ₹12,000 | 990 ₹9,900 | 910.9 ₹9,109 | 1,100 ₹11,000 | 938.2 ₹9,382 |
| 1.00 | 16.79:Providing , laying spreading and compacting graded stone aggregate ( size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub - base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge. | 510.49 | cum | 3,001.23 ₹15,32,100.9 | 3,750 ₹19,14,341.25 | 3,229.31 ₹16,48,533.69 | 3,550 ₹18,12,243.05 | 2,500 ₹12,76,227.5 Lowest | 2,800 ₹14,29,374.8 | 2,600 ₹13,27,276.6 | 3,400 ₹17,35,669.4 | 3,229.31 ₹16,48,533.69 | 2,801.6 ₹14,30,191.59 | 3,425 ₹17,48,431.68 | 2,662.57 ₹13,59,218.02 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 390.6 | cum | 8,927.15 ₹34,86,909.08 | 10,500 ₹41,01,258 | 9,634.13 ₹37,63,052.64 | 9,000 ₹35,15,364 | 8,100 ₹31,63,827.6 | 8,900 ₹34,76,304.4 | 7,750 ₹30,27,119 Lowest | 10,450 ₹40,81,728.2 | 9,625 ₹37,59,486.5 | 8,358.2 ₹32,64,679.49 | 8,750 ₹34,17,715 | 8,565.38 ₹33,45,603.17 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 11,717.88 | kilogram | 85.27 ₹9,99,183.63 | 100 ₹11,71,788 | 103.27 ₹12,10,105.47 | 90 ₹10,54,609.2 | 84 ₹9,84,301.92 Lowest | 90 ₹10,54,609.2 | 86 ₹10,07,737.68 | 105 ₹12,30,377.4 | 103.27 ₹12,10,105.47 | 89.6 ₹10,49,922.05 | 85 ₹9,96,019.8 | 89.48 ₹10,48,515.9 |
| 1.01 | OD129905/2026-2027:Providing and fixing in possition bitumen felt type - 3 grade (two layer) for expansion joint.
Details of cost for a joint of 10m length, 15cm depth
10mx0.15=1.5m2
Double layer 2x1.50m2 = 3m2 | 102.69 | sqm | 2,970 ₹3,04,989.3 | 500 ₹51,345 | 500 ₹51,345 | 450 ₹46,210.5 | 280 ₹28,753.2 | 140 ₹14,376.6 Lowest | 350 ₹35,941.5 | 250 ₹25,672.5 | 500 ₹51,345 | 409.8 ₹42,082.36 | 450 ₹46,210.5 | 241.5 ₹24,799.64 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 69.47 | metre | 201.54 ₹14,001.99 | 250 ₹17,368.75 | 209.54 ₹14,557.79 | 400 ₹27,790 | 180 ₹12,505.5 | 200 ₹13,895 | 150 ₹10,421.25 Lowest | 350 ₹24,316.25 | 209.54 ₹14,557.79 | 181.8 ₹12,630.56 | 350 ₹24,316.25 | 186.43 ₹12,952.22 |
| 1.01 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 5.25 | cum | 2,011.84 ₹10,562.16 | 1,250 ₹6,562.5 | 2,311.85 ₹12,137.21 | 2,100 ₹11,025 | 1,200 ₹6,300 | 1,700 ₹8,925 | 1,500 ₹7,875 | 1,000 ₹5,250 Lowest | 1,900 ₹9,975 | 2,005.7 ₹10,529.93 | 2,000 ₹10,500 | 2,006.7 ₹10,535.18 |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 500 | kg | 132.17 ₹66,085 | 150 ₹75,000 | 128.96 ₹64,480 | 180 ₹90,000 | 115 ₹57,500 | 130 ₹65,000 | 128 ₹64,000 | 195 ₹97,500 | 128.96 ₹64,480 | 111.9 ₹55,950 Lowest | 170 ₹85,000 | 143.34 ₹71,670 |
Tender Value
₹68.0 L
EMD Value
₹50,000
Closing Date
23 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CHAIRMAN AND MANAGING DIRECTOR
KSRTC TRANSPORT BHAVAN FORT THIRUVANANTHAPURAM
Yard maintenance work at Pavangad and Yard Concreting at Pavangad KSRTC garage
2026_KSRTC_876937_1
OEO/KSRTC/776/2026-2027
Open Tender
Civil Works - Others
Item Wise
90 days
KSRTC KOZHIKODE DEPOT
Please refer NIT
5 documents required · 5 mandatory
₹2,760
₹50,000
4 Nov 2026
6 Oct 2026
26 Oct 2026
6 Oct 2026
23 Oct 2026
6 Oct 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1YARD WORK | |||||
| 1.001 | OD129902/2026-2027:JCB engaged for cutting and leveling the yard | 16 | hour | - | - |
| 1.002 | OD129916/2026-2027:Arrange labour for cleaning premisses | 10 | each | - | - |
| 1.003 | 16.79:Providing , laying spreading and compacting graded stone aggregate ( size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub - base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge. | 510.49 | cum | - | - |
| 1.004 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 390.6 | cum | - | - |
| 1.005 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 11,717.88 | kilogram | - | - |
| 1.006 | OD129905/2026-2027:Providing and fixing in possition bitumen felt type - 3 grade (two layer) for expansion joint.
Details of cost for a joint of 10m length, 15cm depth
10mx0.15=1.5m2
Double layer 2x1.50m2 = 3m2 | 102.69 | sqm | - | - |
| 1.007 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 69.48 | metre | - | - |
| 1.008 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 5.25 | cum | - | - |
| 1.009 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 500 | kg | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
Tendernotice_2.pdf
PDF • 0.05 MB
BOQ_1489758.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .