Tender Value
₹19.3 L
EMD Value
₹19,400
Closing Date
18 Jun 2026, 6:40 pmClosed
Executive Engineer (R & B) Division, Rajpipla (State)
SR to Jilla Seva Sadan at Rajpipla Dist. Narmada (Repairing of Internal Road & Paver block)
313227
04 of 2026-27 (sudharo)
Open
Civil Works
Works
Vadodara
6 documents required · 5 mandatory · 1 optional
₹900
Executive Engieer R and B Division Rajpipla
₹19,400
11 Jun 2026
11 Jun 2026
11 Jun 2026
18 Jun 2026
11 Jun 2026
Name of Work :- SR to Jilla Seva Sadan at Rajpipla, Dist.Narmada ( Repairing
Road & Paver Block).
BILL OF QUANTITY
Memorandum showing item of works to be carried out.
It. Item of Work Qty. Unit Estimated Rates Total
No. In Figure In Words Amount
1 Providing and laying 50 mm thick Bituminous 316.00 MT 2675.49|Rupees Two Thousand
Six Hundred Seventy
Macadam with B.T. aggregate as per MORTH Five And Paise Forty
specification and using bitumen emulsion RS-1 as per Nine Only
IS 8887: for tack coat @2.50 KG. / 10 Sq.m. on BT
Surface with mechanical sprayer and Bulk asphalt VG
|30 for mixing @ 34.00 KG. / M.T. ie. 3.40 % of total
|weight of mix including heating and mixing the
aggregate and asphalt in continuous of drum mix plant
and hot laid process spreading the same by paver
|finisher and consolidation with roller as per MORTH
specification to achieve desire density, including
providing almaterials equipments, tools and plants,
fire wood, oil, kerosene, labour charges etc. complete
using contractor's own machinery drum mix plant and
paver finisher etc. complete.
2 Providing and laying 25 mm thick Semi Dense 165.00 MT 3300.68 Rupees Three
Bituminous Concrete with B.T. aggregate as per Hundred And Paise
MORTH gradation VG-30 for mixing @ 50.00 KG. Sixty Eight Only
M.T. including heating and mixing the aggregate and
asphalt by continuouS of batch mix plant and hot laid
process laying with paver finisher and consolidation
with roller as per MORTH specification to achievel
desire density, including cost allmaterials equipments,
tools and plants, oil, kerosene, firewood, labour
|charges etc. complete using contractor's own
|machineries batch mix plant and paver finisher etc.
lcomplete. Rupees Five Hundred
3 Providing and laying 100 mm thick specified quarry 27.00 Cum 583.78
Eighty Three And Paise
spall in side shoulders including carriage of materials Seventy Eight Only
spreading in live and level and consolidation.
4 Place ideatification sign :-Providing and fixing sing 2.00 No 9390.66Rupees Nine Thousand
Three Hundred Ninety
boards made out of 2mm aluminium sheet; size 150 x And Paise Sixty Six Only
90cms. rectangle as as per the design of IRC-67-1977|
pre treated with phospheting process & acid etching:
coated with one coat of epoxy primer and two coats of
best quality epoxy paint; reflectorised with retro
refiective sheeting as per latest M.O.S.T.
Specifications; Letters and numerals should be as per
IRC-30-1968, 3.1m long (2 nos) stand post and frame
|fabricated from suitable size iron angle of 50x50x5mm
75x75x6mm as required; painted with best quality
epoxy coatings in black and white bends. the details of
symbol or inscription /numerals for each board shall
be as per the instruction of engineer in charge. The
fixing at site shall be in 1:2:4 CC block of size 45 x
x 60cms. for each leg. including excavation curing etc.
complete under the supervision of engineer in
|charge.(A) Engineer Grade(VR),..
Estimated Rates Total
Item of Work Amount
In Figure In Words
3 Rupees Three Hundred 38206,
with hot applied thermoplastic paints Sixty Seven And Paise
Road marking glass beads on bitumin surface Seventy Two Only
with reflectorising
laying a hot applied thermoplastic
2.5 mm thick including reflectorising glass
heads Q 250gms per sqm area, thickness
of surface applied
2015. The finished surface to be level,
IRC:35- and free from streaks and holes. zebra patta
Juniformpatta lane/center linel edge line/cut patta. The
ump provide liminance
white color marking should shall be min
coefficinet on cemend road road shall be min
Imcd/m2ux and Asphaltservice life during the day
mcd/m2/ lux during the
Itime. The marking should meet the performance
lcriteria for night time reflectivity, wet reflectivity and
skid resistance as mentioned in the section-15 of IRC
35-2015. Warranty for the Retro reflectivity should be
two vears. Rupees Fifty And Paise
Dismentaling tiled of stone floors laid in mortar
6 Twenty Eight Only
including stacking of serviceable with
disposal of unserviceable materials all lead and
lift. Rupees Five Hundred
7 Demolition of Brick work and stone masonry including 39.00 Cum
Seventy Six And Paise
stacking of serviceable materilas and disposal of Thirty Only
unserviceable materials with all lead and lift.(ii) in
Cement Mortar..
8Providing and laying cement concrete 1:4:8 (1 39.00 Cum 2738.11 Rupees Two Thousand
Seven Hundred Thirty
Cement: 4- coarse sand : 8- hand broken stone Eight And Paise Eleven
laggregates 40 mm nominal size) and curing complete Only
excluding cost of formwork in (A) Foundation and
9 Providing and fixing pre-cast Rubber Dye / steel Dye 389.00 Sqm 705.95 Rupees Seven Hundred
inter locking concrete block 60mm thick with grade of Five And Paise Ninety
concrete M300 pnumatic compressed / vibrated
mechanically and as per approved design Confirming
to IS 15658 : 2006 including 35 mm Sand layer for
levelling and filling the joint with sand in proper line
and level as per guidlines of IRC : SP 63-2018 etc.
Providing and fxing pre-cast concrete kerb stone of 102.00 Rmt 374.93 Rupees Three Hundred
|gray cement based concrete block 30cm length,30cm Seventy Four And
height and 15cm thick of M250 grade concret as per Paise Ninety Three Only
approved design and including excavation for fixing in
proper line and level,filling the joint with C:M 1:3
(1cement:3fine sand) etc complete.
Item of Work Qty. Unit Estimated Rates Total
No. In Figure In Words
11 Providing and fixing pre-cast
Concrete Cover For 4.00 No 2514.90 Rupees Two Thousand 10059,6o|
lChambers 90 x 120 Cm & 100mm thick with/ vibrated
Five Hundred Fourteen
And Paise Ninety Only
M300 pnumatic compressed
mechanically and as per approved design Confirming
to IS 15658: 2006 including Steelin proper line and
level as per quidlines etc. Complete. TOTAL Rs.
And Paise Forty Four Onty
Rupees Nineteen Lakh(s) Thirty Four Thousand Five Hundred Fifty Four
% above/below percent (Should be written
IWe am/are willingto carTy out the work @
/our tender works out as under.
in figures andwords) of the estimated rate mentioned above. Amount of my
*Estimated amount
Estimated amount
put to tender Rs. put to tender Rs.
Net Rs. Total Rs.
In words Rupees |Inwords Rupees
(*Please strike out whichever is not applicable)
Above allitems of "Bill of Quantity with Item Description, Unit, Rate & Amount have verified by me and
Deputy Eyecutive Engineer Sr. Divisional Account Officer Execolive Engineer
Rajpipla (R& E) Sub Division, Rajpipla (R& B) Division, Rajpipla (R& B) Division,
Rajajpla Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E tender Notice Sr to jilla seva sadan (internal road).pdf
SBD Book jilla seva sadan at rajpipla Internal Road.pdf
Sch b sr to jilla seva sadan at raj.pdf
5.1 Bill Of Quantity.pdf
7.1 All Specification COB Internal Road.pdf
BOQ NOTES Sr to jilla seva sadan.pdf
8.1 All Grs Circulars.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .