Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 CrAccepted-AOC | ₹3.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.3 CrRejected-AOC | ₹3.3 Cr | L2 | Rejected-AOC L2 |
Tender Value
₹3.2 Cr
EMD Value
₹6.3 L
Closing Date
22 Jul 2024, 3:00 pmClosed
District Collector/Chairman
DRDA, II FLOOR,COLLECTORATE
TN-07-178 (1 Work) MRL04-M KS- road to Poongodipatty via Naganottak karanpatty, Ponnampatty Km 0/0-4/260
2024_RDTN_134090_1
TN07178
Open Tender
Civil Works - Roads
Item Rate
270 days
DRDA, II FLOOR, COLLECTORATE
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹6.3 L
DRDA, II FLOOR,COLLECTORATE
25 Oct 2024
15 May 2024
22 Jul 2024
15 May 2024
22 Jul 2024
15 May 2024
29 May 2024
Amount
Upgradation of MRL - 04 MKS Road to Poongodipatty Via Naganottakkaran patty, Ponnampatty Km 0/0 - 4/260
Clearing and Grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. (i) (A) - By Manual Means (In Area of Non - Thorny Jungle)
Scarifying the Existing Bituminous road surface to a depth of 100 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Construction of Embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5
Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel Shoulder)
Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 (WMM).
Providing and laying Bituminous Macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.
Providing and applying Prime Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502. (i) Low Porosity
Providing and applying Tack Coat with Bitumen Emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared Granular surface treated with Primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 (ii).
Providing, laying and rolling of Close-Graded Premix Surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 MSS (Using Waste Plastic).
Construction of 1.5 m SPAN RCC Slab culvert at Ch 675, 873, 1270, 1953, 2182, 3360 in the road from MKS Road to Poongodipatty Via Naganottakkaranpatty
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of Pipes in culvert at : 675, 873, 1270, 1953, 2182, 3360
Removal of Body wall in culvert at : 675, 873, 1270, 1953, 2182, 3360
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
1.5m Culvert @ Ch. 675, 873,
1.5mCulvert @ Ch. 1270, 1953,
1.5mCulvert @ Ch. 2182,
1.5mCulvert @ Ch. 3360,
Construction of 1.5 m SPAN RCC Slab culvert at Ch 800, 1380 in the road from MKS Road to Poongodipatty Via Naganottakkaranpatty
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of Deck, Abutment & Wings in culvert at : 800 & 1380
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
1.5m Culvert @ Ch. 800,
1.5mCulvert @ Ch. 1380,
Construction of 2.0 m SPAN RCC Slab culvert at Ch 20, 1031 in the road from MKS Road to Poongodipatty Via Naganottakkaranpatty
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.
Removal of Pipes in culvert at : 20 & 1031
Removal of Body wall at : 20 & 1031
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Supplying and Filling foundation and basement with filling sand in layers not more than 15cm . Thick well ramed, watered and compacted Complete complying with stanard specification.
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Cement concrete 1 : 2.5 : 5 mix using 40mm HBG metal for foundation including watering , centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed . For Footings as 4% Rate for Centering Works
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Cement concrete 1 : 2 : 4 mix using 40mm HBG metal for foundation including watering, centering and shuttering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed For STEM as 10% Rate for Centering Works
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
2.0 m Culvert @ Ch. 20
2.0 mCulvert @ Ch. 1031
Provision of Rumble Strips covered with premix bituminous carpet, 15-20 mm high at centre, 250 mm wide placed at 1 m centre-to-centre at approved locations to control speed, marked with white strips of road marking paint.
Provision for Road Marking with Hot applied Thermoplastic compound with Reflectorising Glass beads on Bituminous Surface
Provision for Road Marker/ Road stud with lens Reflector
Painting Name Board
Painting PMGSY Logo Board board
Painting Sign Board
Chevron Sign Octogan Board (90cm)
60 cm Circle(Mandatory Sign Board)
Reflector - Traffic signs (Near culverts & trees) - Star sign Sticker
Citizen Information Board
Maintenance Board
Km Stone
HM Stone
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
P CHINNASAMY-Kumaresan and Co
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].