Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
28 Sept 2026, 11:00 am
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
DRAWING
16 conditions · 3 needing a document upload
[Refer Para- 10.2 of Tender form (second sheet) of IRSGCC] The tenderer must have minimum average annual contractual turnover of 1.5 V/N crores; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer shall possess a valid Electrical Contractor License, issued by any State Government or Union Territory Administration, authorizing execution of electrical works up to 650 V. The contractor shall have in his employment or shall engage a person holding a valid certificate of competency issued by any State Government or Union Territory Administration for supervision of electrical works up to 650 V. Offers not accompanied by a valid Electrical Contractor License and requisite Supervisor competency for works up to 650 V shall be summarily rejected.
40 conditions · 4 needing a document upload
Contractor should have GST Registration and Certificate should be submitted along with tender. The Tenderer should be GST Compliant. No Bills will be acceptable without GST Registration, which is mandatory after starting of GST Implementation. Responsibility for remitting the GST lies with the Tenderer. This GST will be reimbursed on submission of proof of payment to the Government at prevailing rates for this work.
The contractor should have PAN card, they should attach copy of PAN card
The contractor has to submit the certificates required as per Tender document in support of their legal authority to participate in the tender in favor of the individual to sign the tender on behalf of the tenderer and create liability against them.
The tenderer should submit the copy of ANNEXURE-VA online(if applicable)
The tenderer should submit the copy of duly signed PART-I, PARTII, PART-III (A) & PART-III(B) of Tender Document [PDF file to be uploaded].
If the Bid of a Tenderer is seriously unbalanced in relation to the Engineers estimate of the cost of work to be performed under the contract, the Railways may require the tenderer to produce detailed price analysis for any or all items of the Tender Schedule, to demonstrate the internal consistency of those prices with the construction methods and schedule proposed.
STATUTORY VARIATION CLAUSE: Any addition or variation of statutory taxes, levies and duties after the date of opening of tender shall be paid to the contractor after production of necessary document proof. Similarly benefit of reduction/abolition of duties, taxes or levies, if any, should be passed on to Railway.
The tenderer should submit the copy of filled up & duly signed (NEFT) MANDATE FORM-NEW (ANNEXURE-IV) along with tender
The contractor should have to pay statutory payments like EPF, ESI & Bonus etc., to the contract staff engaged for the subject work without fail and proof of such payments made shall have to be submitted to railways along with the bills for ensuring the compliance. However, Railways will not reimburse the same to the contractor.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The General Conditions of Contract governing the performance of the works covered by this tender are the Indian Railway Standard General Conditions of Contract as amended from time to time up to date. A soft copy of the Indian Railway Standard General conditions of Contract is uploaded in the annexed documents to the tender. Hard copy may be perused in the office of the Assistant Divisional Electrical Engineer/Carriage Repair Shop/Tirupati. In submitting his tender it would be deemed that the tenderer has kept himself fully informed of the provision of the IRS General conditions of Contract including all corrections and Amendments issued up to date and claim that he is not aware of any amendment or correction slip to the IRSGCC shall not be entertained.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through www.ireps.gov.in [II] Prospective Bidders shall keep watch for CORRIGENDUM upto 15 days prior to the deadline for submission of bids. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer. [III]To give prospective bidders a reasonable time on account of CORRIGENDUM in preparing their bids, the Railways may at their discretion extend as necessary, the deadline for submission of Tender document. Railways decision will be final and no correspondence will be entertained from prospective bidders
Tenderer is instructed to carefully go through the Tender Schedule/Scope of Work, Measurement of Work & also visit the Site, before quoting his own percentage rates
Provision of Online Energy Management system for monitoring and control of substations at Carriage repair Shop Tirupati
CRS-E-04-26-27~SCOR
CRS-E-04-26-27
Open
Works - General
4 Months
Tirupati, Andhra Pradesh
₹0
₹2.3 L
5 Sept 2026
5 Sept 2026
14 Sept 2026
15 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 1,15,28,600 | ||
| — | 1.00 | — | — | ||
| AUTOMATION SYSTEM (As per Bill of Materials enclosed at Annexure-A): (a) SIEMENS PLC - IFD WIRELESS SYSTEM; (b) Control & Monitoring of all feeders in MRSS, NUSS, WUSS; (c) Remote ON/OFF for 3 Pumps + 9 Solar Inverters; (d) Energy Consumption in all LT feeders (HT not included); (e) SCADA Monitoring System from Office; (f) Alarms, SMS & Report Generation | — | — | — | 70,80,000 | |
| — | 1.00 | — | — | ||
| PLC CABLE - Supply & Laying | — | — | — | 7,08,000 | |
| — | 1.00 | — | — | ||
| Supply and Installation of ACB of Capacity 2000A for WUSS Transformer-2; MAKE: ABB/ L&T | — | — | — | 3,00,900 | |
| — | 10.00 | — | — | ||
| Supply and Installation of ACB of Capacity 800A for WUSS FEEDERS ; MAKE: ABB/ L&T | — | — | — | 17,70,000 | |
| — | 8.00 | — | — | ||
| Supply and Installation of Spring Motors | — | — | — | 5,66,400 | |
| — | 20.00 | — | — | ||
| Supply and Installation of Energy Meters along with CT coils ; MAKE: ELMEASURE | — | — | — | 5,19,200 | |
| — | 33.00 | — | — | ||
| Supply and Installation of control circuit with local and remote operation for all ACBs | — | — | — | 5,84,100 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TENDER DOCUMENT
ATTACHMENT
I_CT_GCC-
ATTACHMENT
GCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
finaltenderschedule-onlineems-05-09-26.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .