Loading…
Loading…
Tender Value
Refer Docs
Closing Date
29 Jun 2026, 2:00 pmClosed
Single Packet
Normal Tender
No
Not Applicable
Total Value Wise
Lowest to Highest
Please see item details
Not Applicable
120 days
Expenditure
General
OE
4 conditions · 1 needing a document upload
Order will be placed only on manufacturers/authorized dealers with satisfactory past performance for supply of at least 01 No. of tendered item (COIL SPREADING MACHINE) as per Para 2.6 of GCC. The firm may read the Para 2.6 of GCC for full details.
Authozised dealers must upload tender specific authorization in proper format preferably as per Annexure-4 of GCC attached with the tender failing of which their offer will not be considered as valid offer and summarily be rejected. No back reference will be entertained.
In keeping with the Public Procurement (Preference to Make in India) Order, 2017, as amended, it has been found that there is sufficient local capacity and competition in supply of the tendered item of required quality and therefore public procurement of the item is restricted to Class I local suppliers only and the vendors who do not qualify to be Class I local supplies should not quote in the tender as their offers shall not be considered for any ordering. In case any vendor who does not qualify to be a Class I local supplier for the tendered item participates in the tender it does so at their own risk and cost and Railways shall not beliable for any loss or damage Caused to the vendor.
Tenderers must submit compliance against technical specification attached at document section.
42 conditions · 1 needing a document upload
Have you attached the past performance credentials with your offer?
Have you mentioned the complete address of the work premises of the OEM where Third Party Inspection (TPI) inspection will be carried out before dispatch of the material?
Have you submitted Annexure A of Section III of technical specifications?
Have you quoted Warranty Obligations as per Clause 16 of Section II?
Have you quoted price of basic machine, Concomitant Accessories, essential spares, consumables, essential services, AMC and other items as per the requirement. It is mandatory to submit offers against all these items otherwise the bid shall not be considered in ranking.
Have you attached the price break up of concomitants accessories, optional accessories, consumables and Essential Spares in PDF file through attach document template or otherwise?
Have you quoted Delivery Period correctly and precisely as per SR NO 7 of Section I of specification attached?
Commercial Details and Performance Appraisal form (Annexure E of Section III of specification attached).
FOR: Destination by road is referrable
Bidders should confirm following certificate for Compliance (a) I have read the clause Sr. No. 32 of GCC attached with the tender regarding restrictions on Procurement from a bidder of a country which shares a land border with India and on sub-contracting to contractors from such countries. (b) I certify that this bidder is not from such a country and will not subcontract any work to a contractor from such countries unless such contractor is registered with the Competent Authority. I also certify that this bidder will not offer any products/services of entity from such countries unless such entity is registered with the Competent Authority. (c) I hereby certify that this bidder fulfills all requirements in this regard and is eligible to be considered. (d) I hereby acknowledge that in the event of acceptance of my bid on above certificate and if the certificate is found to be false at any stage, the false certificate would be a ground for immediate termination of contract and further legal action in accordance with the Law. (Bidders confirming this certificate for Compliance shall select Yes in the Complied column. However, in case you dont confirm above certificate for Compliance, select NO in the complied column. In such cases you are required to submit the certificate for Compliance as per Part B of Annexure8 of GCC attached with the tender along-with their Bid/Offer.)
Tenderers who are OEM, must give undertaking for supply of spare parts for a period of expected life of the machine/equipment. Other Tenderers must submit undertaking from OEM for supply of spare parts for a period of expected life of the machine/ equipment
Bidders are reminded to carefully go through IRS conditions of contract (included and uploaded along with the bid document) particularly those pertaining to Code of Integrity, Misdemeanor and penal measures". If two or more bidders are found to be sister concerns or affiliates (having common partner/director/promoter/owner/holding company decision control etc.) the offers of all such sister concerns are liable to be rejected as per relevant provisions of IRS terms and condition
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
1 condition
Code of Integrity Declaration: I/We have carefully gone through the IRS conditions of contract (included and uploaded along with the bid document) particularly Para 2500 pertaining to "Code of Integrity, Misdemeanor and Penalties". I/We hereby certify that no other concerns or affiliates (such as having common partner/ director/promoter/owner/holding company /management control etc.) have participated in this tender which give rise to a conflict of interest or fall under anti-competitive practices. We understand that the offers of all such related concerns including ours are liable to be rejected as per relevant provisions of IRS terms and conditions. I/We, affirm that we shall abide by the Code of Integrity in general, with specific reference to conflict of interest [Para 2502 (e)], anti competitive practices [Para 2502(c)] and obligation to proactive disclosures [Para2503]. I/We understand that we are fully responsible for the above declaration and it shall not be the Railway's responsibility to verify the same. I/We are aware that we shall be liable for all consequences of violation of Code of Integrity, if detected at any stage.
1 location across West Bengal · 7 Numbers total
Supply & commissioning of PNEUMATIC COIL SPREADING MACHINE (ON TURNKEY BASIS) AS PER ANNEXURE
OE265420
OE265420
Open - Indigenous
Mixed (Goods/Service/AMC)
West Bengal
₹0
Exempted
29 Jun 2026
2 Jun 2026
9 items · 7 Numbers total
THE COST OF THE BASIC MACHINE PNEUMATIC COIL SPREADING MACHINE (ON TURNKEY BAS IS) as per Attached Technical Specification Section - I of Sl no. 5.(i). [ Warranty Period: 24 Months after th e date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| DY,CME/DW/KGP, SER | West Bengal | 1.00 Numbers |
| Total | 1 Numbers | |
Cost of comprehensive AMC for 5 year after the warranty period as per SECTION-II clause 17 of attached technical specification [ Warranty Period: 2 years, AMC Period: 5 years, Rate of Discounti ng: 10 % ] ]
Cost of the concomitant accessories for machine according to tender as per Attached Technic al Specification Section - I of Sl no. 5.(ii). [ Warranty Period: 24 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| DY,CME/DW/KGP, SER | West Bengal | 1.00 Numbers |
| Total | 1 Numbers | |
Cost of any other accessory which in the opinion of supplier is essentially required for making the machine fully functional as per Attached Technical Specification Section - I of Sl no. 5.(iii). [ Warranty Period: 24 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| DY,CME/DW/KGP, SER | West Bengal | 1.00 Numbers |
| Total | 1 Numbers | |
Cost of turnkey charges viz. foundation, installation & commissioning, etc as per Attached Te chnical Specification Section - I of Sl no. 5.(iv). ]
Consumables as per clause 6 of Section- II with break up of individual items as applicable as per Attached Technical Specification Section - I of Sl no. 5.(v). [ Warranty Period: 24 Months after the dat e of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| DY,CME/DW/KGP, SER | West Bengal | 1.00 Numbers |
| Total | 1 Numbers | |
Spares for two years normal operation and maintenance as per Attached Technical Specificat ion Section - I of Sl no. 5.(vi). [ Warranty Period: 24 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| DY,CME/DW/KGP, SER | West Bengal | 1.00 Numbers |
| Total | 1 Numbers | |
Optional Accessories with break up of individual items as specified in clause 4.3 of Section-I a s per Attached Technical Specification Section - I of Sl no. 6.(i). [ Warranty Period: 24 Months after the da te of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| DY,CME/DW/KGP, SER | West Bengal | 1.00 Numbers |
| Total | 1 Numbers | |
Cost of Preventive Maintenance during 1st & 2nd year of Warranty Period as per Attached Te chnical Specification Section - I of Sl no. 6.(iii). [ Warranty Period: 24 Months after the date of delivery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| DY,CME/DW/KGP, SER | West Bengal | 1.00 Numbers |
| Total | 1 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
SPECIFICATION-PNEUMATICCOIL.pdf
ATTACHMENT
5772557.pdf
ATTACHMENT
5772553.pdf
ATTACHMENT
QAP-PNEUMATICCOIL-TRSPOHSHOP.pdf
ATTACHMENT
LB2947_SPECIFICATION-PNEUMATICCOIL.pdf
ATTACHMENT
LB2947_QAP-PNEUMATICCOIL-TRSPOHSHOP.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .