Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.7 LAccepted-AOC | ₹25.7 L | L1 | Accepted-AOC Lowest tender
Agreement No 80 |
| Sl No | Description | Qty | Unit | NIYAS ISHAKU KUNJU L1 |
|---|---|---|---|---|
| 1.00Appendix A Reactive Maintenance/Initial rectification | ||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 2.96 | cum | 2,685 ₹7,961.03 |
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 1.05 | cum | 2,751 ₹2,888.55 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 2.96 | cum | 5,923 ₹17,561.70 |
| 1.00 | 55.9.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 12mm departmental broken stone and compacting with power roller to get a compact surface. | 1.05 | cum | 13,601 ₹14,281.05 |
| 1.00 | 10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. | 475 | sqm | 65 ₹30,875 |
| 1.01 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | 428 | sqm | 32 ₹13,696 |
| 2.00Appendix B Premonsoon Works | ||||
| 2.00 | OD129584/2024-2025:Filling up pot holes with bituminous ready mix compacting (25kg bag) and compacted (rate is arrived a bag of 25kg )and compacted by ramming to get a compact surface including cost of materials laying charges, transportation to site etc complete. Assuming that an average of 30 bag of 25kg ready mix compound will laid in pot holes in a day | 100 | each | 835 ₹83,500 |
| 2.00 | 10.5.1a:Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm. Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 - For grading I Material | 30 | sqm | 518 ₹15,540 |
Tender Value
₹23.7 L
EMD Value
₹50,000
Closing Date
23 Oct 2025, 4:00 pmClosed
Executive Engineer
Executive Engineer PWD Roads Division Kollam
GENERAL-RM 2024 25 RC2 Phase 1Cluster 2One Year Sasthamcotta KLM RM 2024 25 Zone 3 One Year Running Contract for Various PWD Roads Under Roads Section Sasthamcotta in Kollam District 3 road stretches for a length of 8Km in Kunnathur LAC
2025_PWD_802182_2
52/EE/ET/2025-26
Open Tender
Civil Works - Roads
360 days
Kollam
Please refer Tender documents.
13 documents required · 13 mandatory
₹2,760
Yes
₹50,000
Yes
23 Jan 2026
14 Oct 2025
25 Oct 2025
14 Oct 2025
23 Oct 2025
14 Oct 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.09 MB
SBD.pdf
Tender Documents • 1.63 MB
NIT.pdf
Other Document • 0.07 MB
BOQ_1350624.xls
BOQ • 0.33 MB
Spcl.pdf
Other Document • 0.31 MB
Download all tender documents and submit your bid