| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-AOC | 1 | Accepted-AOC L1. Agreement executed | |
| 2 | 2₹5.1 L+₹70,466.63 (16.1%)Rejected-AOC | 2 | Rejected-AOC L2 | |
| 3 | 3₹5.3 L+₹95,914.05 (21.9%)Rejected-AOC | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | M.V.SAKKEER HUSSAIN L2 | ABUTHAHIR.M.V L3 | MUHAMMED SHAFI P.A. L1 |
|---|---|---|---|---|---|---|
| 1.00Appendix . A | ||||||
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 5.25 | cum | 1,554.43 ₹8,160.76 | 1,600 ₹8,400 | 1,338.67 ₹7,028.02 Lowest |
| 1.00 | 15.47.2:Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually / by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-Charge:Above 150 mm diameter | 10 | metre | 416.62 ₹4,166.2 | 500 ₹5,000 | 358.79 ₹3,587.9 Lowest |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 166.25 | cum | 257.63 ₹42,830.99 | 300 ₹49,875 | 221.87 ₹36,885.89 Lowest |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 10.92 | cum | 2,967.19 ₹32,401.71 | 3,200 ₹34,944 | 2,555.34 ₹27,904.31 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9.48 | cum | 7,932.89 ₹75,203.8 | 8,200 ₹77,736 | 6,831.8 ₹64,765.46 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 132.6 | sqm | 386.16 ₹51,204.82 | 400 ₹53,040 | 332.56 ₹44,097.46 Lowest |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 16.68 | cum | 8,568 ₹1,42,914.24 | 8,800 ₹1,46,784 | 7,379.74 ₹1,23,094.06 Lowest |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.83 | cum | 9,235.97 ₹16,920.3 | 9,500 ₹17,404 | 7,954.01 ₹14,571.75 Lowest |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 76.5 | sqm | 343.79 ₹26,299.94 | 350 ₹26,775 | 296.07 ₹22,649.36 Lowest |
Tender Value
₹5.1 L
EMD Value
₹12,695
Closing Date
10 Nov 2025, 3:30 pmClosed
Ajayakumar V
Assistant Executive Engineer Office of the AEE,MI Subdivision,Shoranur
GENERAL-Annual Maintenance 2025-26- Annual maintenance works to LIS Kaladikkunnu in Thiruvegappura Panchayath.- General Civil Work
2025_Irrig_818102_1
IRR/IA/TR/3517/2025_5_3_2/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Thiruvegappura
Please refer tender documents
7 documents required · 7 mandatory
₹1,120
₹12,695
9 Jan 2026
1 Nov 2025
13 Nov 2025
1 Nov 2025
10 Nov 2025
1 Nov 2025
Amount
Appendix . A
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
15.47.2:Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually / by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-Charge:Above 150 mm diameter
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD15939/2025-2026:Engaging labor for cleaning pump house and surroundings and slipped earth and other floating materials in canal during distribution etc. including direction of departmental officers at site.
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
M.V.SAKKEER HUSSAIN (BID ID -2433391)
ABUTHAHIR.M.V (BID ID -2433395)
Bidder Name
M.V.SAKKEER HUSSAIN
MUHAMMED SHAFI P.A.
ABUTHAHIR.M.V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1370921.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.96 MB
BOQ_1370921.xls
BOQ • 0.31 MB
preliminaryagreement.pdf
Tender Documents • 0.11 MB
affidavitformandepayment.pdf
Additional Documents • 0.08 MB
formoftender.pdf
Additional Documents • 0.18 MB
integritypact.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .