| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.4 LAccepted-AOC | ₹4.4 L | 1 | Accepted-AOC L1. Agreement executed |
| 2 | 2₹5.1 LRejected-AOC | ₹5.1 L | 2 | Rejected-AOC L2 |
| 3 | 3₹5.3 LRejected-AOC | ₹5.3 L | 3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | M.V.SAKKEER HUSSAIN L2 | ABUTHAHIR.M.V L3 | MUHAMMED SHAFI P.A. L1 |
|---|---|---|---|---|---|---|
| 1.00Appendix . A | ||||||
| 1.00 | 15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix) | 5.25 | cum | 1,554.43 ₹8,160.76 | 1,600 ₹8,400 | 1,338.67 ₹7,028.02 |
| 1.00 | 15.47.2:Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually / by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-Charge:Above 150 mm diameter | 10 | metre | 416.62 ₹4,166.20 | 500 ₹5,000 | 358.79 ₹3,587.90 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 166.25 | cum | 257.63 ₹42,830.99 | 300 ₹49,875 | 221.87 ₹36,885.89 |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 10.92 | cum | 2,967.19 ₹32,401.71 | 3,200 ₹34,944 | 2,555.34 ₹27,904.31 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 9.48 | cum | 7,932.89 ₹75,203.80 | 8,200 ₹77,736 | 6,831.8 ₹64,765.46 |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 132.6 | sqm | 386.16 ₹51,204.82 | 400 ₹53,040 | 332.56 ₹44,097.46 |
| 1.01 | 4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 16.68 | cum | 8,568 ₹1.4 L | 8,800 ₹1.5 L | 7,379.74 ₹1.2 L |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.83 | cum | 9,235.97 ₹16,920.30 | 9,500 ₹17,404 | 7,954.01 ₹14,571.75 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 76.5 | sqm | 343.79 ₹26,299.94 | 350 ₹26,775 | 296.07 ₹22,649.36 |
Tender Value
₹5.1 L
EMD Value
₹12,695
Closing Date
10 Nov 2025, 3:30 pmClosed
Ajayakumar V
Assistant Executive Engineer Office of the AEE,MI Subdivision,Shoranur
GENERAL-Annual Maintenance 2025-26- Annual maintenance works to LIS Kaladikkunnu in Thiruvegappura Panchayath.- General Civil Work
2025_Irrig_818102_1
IRR/IA/TR/3517/2025_5_3_2/1
Open Tender
Civil Works - Lift Irrigation Schemes
180 days
Thiruvegappura
Please refer tender documents
7 documents required · 7 mandatory
₹1,120
₹12,695
9 Jan 2026
1 Nov 2025
13 Nov 2025
1 Nov 2025
10 Nov 2025
1 Nov 2025
Amount
Appendix . A
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 or leaner mix ( including equivalent design mix)
15.47.2:Dismantling asbestos cement pressure pipes including excavation and refilling trenches after taking out the pipes manually / by mechanical means and stacking the pipes within 50 metres lead as per direction of Engineer-in-Charge:Above 150 mm diameter
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
OD15939/2025-2026:Engaging labor for cleaning pump house and surroundings and slipped earth and other floating materials in canal during distribution etc. including direction of departmental officers at site.
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
M.V.SAKKEER HUSSAIN (BID ID -2433391)
ABUTHAHIR.M.V (BID ID -2433395)
Bidder Name
M.V.SAKKEER HUSSAIN
MUHAMMED SHAFI P.A.
ABUTHAHIR.M.V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1370921.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.96 MB
BOQ_1370921.xls
BOQ • 0.31 MB
preliminaryagreement.pdf
Tender Documents • 0.11 MB
affidavitformandepayment.pdf
Additional Documents • 0.08 MB
formoftender.pdf
Additional Documents • 0.18 MB
integritypact.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid