Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹419.85 (0.21%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
EMD Value
₹4,000
Closing Date
27 Jul 2026, 6:00 pmClosed
Executive Engineer REW ganderbal
Executive Engineer REW ganderbal
Filling of Graveyard at Ganie Mohalla Safapora Block Safapora Pyt Halqa Safapora-A DDC GS No. 177
2026_RDPR_316499_11
E NIT No. 35/2026-27 of REW Ganderbal
Open Tender
Civil Works
Percentage
30 days
RDD AND PR
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Rural Development and Panchayati Raj
₹4,000
31 Jul 2026
17 Jul 2026
28 Jul 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | P/L in position cement concrete of specific grade M10 (1:3:6) incl. curing | - | cum | - | - |
| 2 | Plum | - | cum | - | - |
| 3 | 12 mm cement-sand plaster in 1:6 mix | - | sqm | 1 | - |
| 4 | Carriage of Various materials sand/aggregate from source to W.S by MT. Average lead 10 km | - | Cum | - | - |
| 5 | Formwork for shuttering and centering incl. strutting, propping, removal thereof and all carriages | - | sqm | - | - |
| 6 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer and painting - all complete. | - | kg | 1 | - |
| 7 | Removal and refixing of GI chainlink fencing incl. the structural steel supporting the fencing | - | sqm | - | - |
| 8 | Supply, stacking , laying and spreading of earth incl. all costs, loading , unloading and carriages/ head loads upto site of work complete (Earth measured in stacks will be reduced by 20% for payment) | - | cum | - | - |
| 9 | Add Provision for CIB<Photographs and other unforeseen items (to be paid as per actual) | - | Job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.59 MB
BOQ_1032163.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .