Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC MANJUSHA KARIPOOR NEDUMANGAD | ₹1.5 Cr | L1 | Accepted-AOC Accepted as L1 Bidder |
| 2 | L2₹1.7 Cr+₹28.8 L (19.7%)Rejected-Finance | ₹1.7 Cr+₹28.8 L (19.7%) | L2 | Rejected-Finance L2 Bidder so Reject |
| 3 | L3₹1.8 Cr+₹33.6 L (23.0%)Rejected-Finance | ₹1.8 Cr+₹33.6 L (23.0%) | L3 | Rejected-Finance L3 Bidder so Reject |
| 4 | L4₹1.9 Cr+₹45.2 L (30.9%)Rejected-Finance | ₹1.9 Cr+₹45.2 L (30.9%) | L4 | Rejected-Finance L4 Bidder so Reject |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
8 Sept 2021, 5:00 pmClosed
CEO, Technopark
Park center building, Technopark, Trivandrum 69558
CONSTRUCTION OF ROAD NEAR SUNTEC CAMPUS IN TECHNOCITY, TRIVANDRUM
2021_ETPK_434412_1
ETPK/TC/75/2021-22
Open Tender
Civil Works - Roads
Item Rate
30 days
Technocity, Trivandrum
As mentioned in the tender document
6 documents required · 6 mandatory
₹2,950
₹50,000
Park center building, Technopark, Trivandrum 69558
18 Jan 2022
11 Aug 2021
10 Sept 2021
11 Aug 2021
8 Sept 2021
12 Aug 2021
26 Aug 2021
Amount
Site Development work
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyound 30 cm girth up to and including 60 cm girth. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyound 60 cm girth up to and including 120 cm girth. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth up to and including 240 cm girth.The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed for all kinds of soil.The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials for all kinds of soil. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Road Work
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Construction of granular sub- base by Providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, Carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per specifications and directions of Engineer-in- Charge. With material conforming to Grade-II (size range 53 mm to 0.075 mm ) having CBRValue-25. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing , laying spreading and compacting graded stone aggregate ( size range 53 mm to 0.075 mm) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub - base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer - in- Charge. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and applying primer coat by using bituminous emulsion complying to IS 8887 over prepared surface of granular base with emulsion at a temperature between 20-60 deg. C and applying a uniform coat with the aid of self propeiied bitumen pressure sprayer with self heating arrangement and spraying bar with nozzles of constant volume or pressure system at the rate of 10Kg/10m2 including all material, Labour, machinery, with all leads and lifts complete.The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and applying tack coat using bitumen emulsion conforming to IS : 8887, using emulsion pressure distributor including preparing the surface & cleaning with mechanical broom. With medium setting bitumen emulsion On W.B.M/ W.M.M @ 0.4 kg / sqm. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to works site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying semi - dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per direction of Engineer- in- Charge. 25 mm compacted thickness with bitumen of grade VG - 30 @ 5% ( percentage by weight of total mix) and lime filler @ 2% ( percentage by weight of Aggregate prepared in batch type hot Mix plant of 100-120 TPH capacity . The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Supplying and stacking quarry dust of 3mm and down particle upto 150 micron minimum size and stacking in standard heaps for measurement including cast, conveyance to site and spreading over the premix chipping carpet etc. complete as per the direction of Enginner - in - charge. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Duct, Drain & Path way
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size). The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Conveying the R.C.C slab of size 1.65 X 0.60 X 0.15 meter or nearest size from the casting yard to the drain site and placing in position at a distance of 150m including hire charges of all appliances labour charge for loading and unloading etc complete. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x15 cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15cm in: CM 1:6 ( 1 cement :6 coarse sand) etc complete. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete: 300 mm dia R.C.C. pipe. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes includingcollars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2(1 cement : 2 fine sand) including testing of joints etc. complete. 600 mm dia RCC pipes. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes. 110 mm diameter. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
12 mm cement plaster of mix: 1:4 ( 1 cement : 4 coarse sand). The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength,thickness & size/ shape, made by table vibratory method using PU mould, laid inrequired colour & pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sand bedding layerthrough vibratory compaction by using plate vibrator, filling the joints with sand andcutting of paver blocks as per required size and pattern, finishing and sweepingextra sand. complete all as per direction of Engineer-in-Charge. 60mm thick cement concrete paver block of M-35 grade with approved colour, design& pattern. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature jointed with cement mortar 1:3 ( 1 cement : 3 coarse sand) , including making joints with or without grooves ( thickness of joints except at sharp curve shall not to more than 5 mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge ( length of finished kerb edging shall be measured for payment ). ( Precast C.C. kerb stone shall be approved by Engineer-in-Charge). The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS: 164, on bituminous surface in white / yellow shade, including cleaning the surface of all dirt, scales oil, grease and foreign material etc. complete. New work (Two or more coats). As per the satisfaction of engineer in charge. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete. on concrete work. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
Providing and fixing 100 mm sand cast Iron grating for gully trap. The rate is inclusive of all material charge, labour, transportation, scaffolding (if needed) loading/ unloading at the work space etc complete as per the direction of engineer in charge.
HARY AUSTIN
THOPPIL CONSTRUCTIONS
Y.SHAJAHAN
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .