Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹28.1 L
EMD Value
₹56,273
Closing Date
6 Mar 2026, 6:00 pmClosed
Commissioner SMC
Baghajatin road, Collegepara, Siliguri
Construction of both side drain S/F - Bana Roy house to Kamal Ice cream factory via Babli jha house at Baikuntha pally , Ward no - 41
2026_MAD_1008582_22
33/WBMAD/SMC/PW/2025-2026
Open Tender
CIVIL WORKS
Percentage
120 days
Siliguri
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,500
₹56,273
Yes
14 Mar 2026
18 Feb 2026
9 Mar 2026
18 Feb 2026
6 Mar 2026
18 Feb 2026
Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. .
(a) Depth of excavation not exceeding 1.500 mm.
Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
Cost of stone boulder 150 mm size delivered ans stacked at site.
(II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor .
(a) 1:3:6 proportion.
Ordinary cement concrete (mix 1:1.5:3) with graded stone chips (20mm nominal size) excluding shuttering and reinforcement, if any, in ground floor as per relevant codes.
(ii) River bazree.
Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).
(f) 25mm. To 30mm. Shuttering with out staging in foundation etc.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction.
(a) For works in foundation, basement and up to roof of ground floor/up to 4m. Tor steel/Mild steel.
SAIL/ TATA/RINL
Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor). [Excluding cost of chipping over concrete surface].
(ii) With 1:4 cement mortar .
(c)10 mm. thick plaster.
Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
BOQ_2477979.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .