Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-AOC | ₹15.1 L | L1 | Accepted-AOC Bsed on L1 basis |
| 2 | L2₹15.2 L+₹8,550 (0.57%)Rejected-Finance | ₹15.2 L+₹8,550 (0.57%) | L2 | Rejected-Finance Based on L1 basis |
| 3 | L3₹15.7 L+₹64,100 (4.25%)Rejected-Finance | ₹15.7 L+₹64,100 (4.25%) | L3 | Rejected-Finance Based on L1 basis |
| 4 | L4₹16.7 L+₹1.6 L (10.7%)Rejected-Finance | ₹16.7 L+₹1.6 L (10.7%) | L4 | Rejected-Finance Based on L1 basis |
Tender Value
₹22.1 L
EMD Value
₹44,234
Closing Date
30 Jan 2023, 5:00 pmClosed
EE VI WRD Bicholim
EE VI WRD Bicholim
Construction of retaining wall in Sy. No. 9/9 at Ghoteli No. 1 V.P. Querim Sattari Goa
2023_WRD_6556_1
No.WRD/WDVI/Accts/F.17/TN-e- 27/2022-23/813 Line 9
Open Tender
Civil Works - Water Works
Item Rate
60 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹44,234
13 Jun 2023
9 Jan 2023
2 Feb 2023
9 Jan 2023
30 Jan 2023
9 Jan 2023
Amount
Earthwork in excavation in all types of strata comprising any of the materials such as soil silt clay, gravel , murrum of all varieties shingles, pebbles and all types of conglomerates laterite rock , fissured rock wheathyer rock, shattered rock, decomposed rock and all such other materials either in full or in part as the case may be adopting any method or methods as may be convenient or permitted including chiseling wedging etc. but blasting peobhited in all conditions such as dry, moist , saturated , submerged , foul conditions etc. including pumping and bailing out water including setting out constructions of shoring and bracing in removal of stumps and other deleterious materials , dressing of sides and bottom and back filling the excavated earth to the extend required and disposing off the remaining excavated soil/rock as directed by Engineer in Charge for initial leads of 50 m and all lifts etc. complete.
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Centering and shuttering including struttings, propping etc. and removal of formwork for : a)Foundations, footings, bases for columns and mass concrete.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge a) 110 mm
SAMAA CONSTRUCTIONS
NARAYAN HARWALKAR
Kamakshi Infrastructure Construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .