Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NEAR DFO OFFICE VIDYA NAGAR MEHAM ROAD BHIWANI 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 247 DHAMPURA LAKSAR ROAD DISTT HARIDWAR 249408 UTTARAKHAND | HARIDWAR | HARIDWAR | UTTARAKHAND | 249408 | Rejected-Technical Not meet TQR |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
11 Mar 2024, 1:00 pmClosed
Superintending Engineer
SE O and M Circle PTCUL 26- Civil Lines Roorkee.
Work of repairing of store and associated work at 220 KV Substation SIDCUL, Haridwar.
2024_PTCUX_69323_1
T-44/SE(OandM)CR/2023-24
Open Tender
Miscellaneous Works
Item Rate
60 days
SIDCUL Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹590
Yes
SE O and M PTCUL Roorkee
₹29,000
Yes
7 Jun 2024
12 Feb 2024
12 Mar 2024
12 Feb 2024
11 Mar 2024
12 Feb 2024
Amount
Earth work excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or pits of any size, including dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, including all leads & lifts.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. All work up to plinth level 1:4:8 ( 1 Cement, 4 Coarse sand, 8 graded stone aggregate 40 mm nominal size.)
Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering. All work up to plinth level 1:2:4 ( 1 Cement, 2 Coarse sand, 4 graded stone aggregate 20 mm nominal size.)
Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering and shuttering, finishing. All work up to plinth level 1:1.5:3 ( 1 Cement, 1.5 Coarse sand, 3 graded stone aggregate 20 mm nominal size).
Iron work in plain such as reinforced necessary including cuttting, bending & proper binding for proper completion of work and including supply of steel and authorized over lapping shall be measured (including supply).
First class brick work in 1:4 cement and sand mortar including cost of material, labour and T&P required for proper completion of work.
12 mm Plaster of Mix 1:4 ratio with cement and sand including cost of material, labour and T&P required for proper completion of work.
Chirag Construction company
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .