| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.1 LAccepted-AOC GRAM BAIJLA PO CHAMU BARA PRAYAGRAJ UTTAR PRADESH 212106 | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 212106 | L1 | Accepted-AOC Due to L1 bidder | |
| 2 | L2₹33.0 L+₹94,877.90 (2.96%)Rejected-Finance | L2 | Rejected-Finance Bidder rank L2 |
Tender Value
₹35 L
EMD Value
₹1.8 L
Closing Date
15 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE
EE MGCCD13 GARMUKTESHWAR
construction of fall cum head regulator of Adampur minor kokapur mr of fall at km 11.180 of Ujhari Dy.
2021_UPIDC_633161_28
Tender Notice No-02/EE/2021-22
Open Tender
Civil Works
Item Rate
90 days
Hasanpur
please refer tender documents
2 documents required · 2 mandatory
₹854
₹1.8 L
24 Dec 2021
10 Dec 2021
15 Dec 2021
10 Dec 2021
15 Dec 2021
10 Dec 2021
90 days
Amount
Excavation in foundation in ordinary soil (Loam,clay or sand ) i/c lift upto 1.50 M.and lead 30 M. including filling watering and ramming of excavated earth into the trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge.
Supplying & Laying Cement Concrete 1:3:6 (A40 M10) in foundation and wing walls etc. including cost of all materials labour and T&P etc Complete.
P/Laying Ist Class brick work in 1:4 (cement,coarse sand) including cost of all materials labour and T&P etc Complete.
Supplying & Laying Cement Concrete 1:1.5:3 ( M20) for C.C. Work in abutment and wing walls etc. including cost of all materials labour and T&P etc Complete.
Supplying & Laying Cement Concrete 1:1.5:3 ( M20) for R.C.C. Work in abutment and wing walls including cost of all materials labour and T&P etc Complete.
Supplying & Laying Cement Concrete 1:2:4 ( M15) for C.C. Work in floor including cost of all materials labour and T&P etc Complete.
Providing steel reinforcement with cutting bending,binding and placing in position with cost of steel and all materials,labour and T&P etc.Complete.
Centering and shuttering for R.C.C.work including coast of all materials ,labours and T& P etc. Complete.
Providing and laying water stopper for construction joint i/c cost of materials,labour and T&P etc Complete.
Providing and laying water stopper for expansion joint i/c cost of materials,labour and T&P etc Complete.
Supplying & Fixing G.I. Pipe 75 mm dia including cost of all materials,labour and T&P.etc. in fall crest.
S/Laying course sand in filler i/c cost of materials ,laour,T&P etc. complete.
S/Laying Pea Gravel/Shingle 10-20mm size in filler i/c cost of materials ,laour,T&P etc. complete.
P/Laying Stone boulder 20-40 kg wt. i/c cost of materials ,laour,T&P etc. complete.
P/Laying brick pitching.. i/c cost of materials ,laour,T&P etc. complete.
Nepal Singh Contractor
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .