Construction of Proposed Staff Quarter building at Govt.ITI Bheden in the District of bargarh for the year 2025-26
2026_CERWI_138947_1
ONLINE-RWCSBP-18/2026-27
Open Tender
Civil Works - Buildings
Percentage
450 days
Bargarh
2 documents required · 2 mandatory
₹10,000
₹4.3 L
Yes
17 Aug 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
17 Aug 2026 - 28 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unservicable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres inclusing removal and disposal of top organic soil not exceed ing 150 mm in thickness. | 750 | sqm | 8.6 | ₹6,450 |
| 2 | Earthwork in excavation in foundation in hard soil with initial lead and lift including rough dressing and levelling the bed and depositing the excavated earth at places away from work site including cost, conveyance, royalty and taxes of all materials, labour, T & P and dewatering if required for the work etc. complete and as per specification and direction of the Engineer -in-charge.
Building work, Compound wall, CC Approach ,RCC Storm Water Drain | 1,075.73 | cum | 282.88 | ₹3,04,302.5 |
| 3 | Extra lift or 1.5m or part there of over the initial lift of 1.5m in all kinds of embankments and road works and ordinary earth work in general. (upto 3m) | 207.36 | cum | 22.5 | ₹4,665.6 |
| 4 | Filling in foundtaion and plinth with excavated materials including watering and ramming as directed by the Engineer-in-charge. | 273.75 | cum | 157.2 | ₹43,033.5 |
| 5 | Carraige of surplus earth by mechanical means (within 5 Km. lead) | 547.5 | cum | 278.8 | ₹1,52,643 |
| 6 | Supplying,filling in foundation & plinth with sand in layers not exceeding 23 cum (9") thick including watering & ramming with the cost,conveyance,royalty,taxes of all materials,labour,T&P required for the work etc. complete as per specification & direction of the Engineer-in-charge.
Building worksCompound wall, CC Approach ,RCC Storm Water Drain | 1,288.65 | cum | 685.72 | ₹8,83,653.08 |
| 7 | Providing & applying of pre constructional anti-termite treatment by drilling 12mm dia holes at distance of 30cm @ junction of wall & floor about 300mm apart deep enough to reach the soil below & chemical emulsion (PREMISE, IMIDACHLOPRIED 30.5SC OF BAYER MAKE mixed with 47.5ltr water) pumped these holes to soak the soil @ 1 ltr solution of each hole as per manufactures specification & the holes should be pluged the filling materials including cost of all materials, labour,conveyance, T&P , all taxes and hire charges of machinaries as per direction of Engineer-in-charge.
Supplying, Diluting & spreading chemical emulsion like CHLORPYRIPHOS or other Chemical approved by the Central Insectivides Board as directed by the manufacturer and spraying the mixture uniformly by the sprayer as preconstructional anti-termite treatment and creating a chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floors along with external perimeter of the building, expansion joints, surrounding the pipes and conduits etc. complete at the rate of 7.5 litres (or as directed by the manufacturer) per sqm on vertical and 5.0 litres per sqm on horizontal sufaces, 50% of the emulsion to be filled in center to center etc. complete as per the holes made in trenches at 150mm IS:8313/1981 (Part-II) complete including cost, conveyance, loading, unloading and taxes of all materials, cost of all labour, T&P, sundries and scaffolding where required for the work etc. complete in all respect as per specification as directed by the Engineer-in-charge.
a) Treatment to soil below raft: Before laying the rubble soling and PCC the compacted and leveled soil shall be treated at 5 litre/ sq.m
b) Treatment to soil along the retaining wall: The soil coming in contact with the retaining wall shall be treated at 5 litre per sq.m. The treatment shall follow the backfilling as backfilling is done in stages of 30 cms but not to exceed a depth of 1 metre. Rodding may be carried out to facilitate the treatment.
d) Treatment of soil surrounding pipes, wastes and conduits; When pipes, wastes and conduits enter the soil inside the area of the foundation, the soil surrounding the point of entry must be loosened around each such pipe, waste or conduit for a distance of 15 cm and upto a depth of 7.5cm and loosened soil shall be treated with chemical emulsion.
e) Spraying equipment: A pressure pump shall be used to carry out spraying opernations to facilitate proper distribution of chemical in the soil.
Note: All the Anti-termite treatment shall be executed through a recognised agency approved by the Engineer-in-charge. A written guarantee on non-jdicial stamp paper shall be submitted by the Contractor for a minimum period of 10 (Ten) years from the certified date of completion for the satisfactory performance of the entire Anti-termite treatment is Ten years. The contractor has to furnish bank guarantee amounting to Rs.4,00,000/- which will be released after 10(Ten) years from the date of completion of the whole work. In case, the contractor fails to furnish the B.G., equal amount i.e. Rs.4,00,000/- will be kept withheld from the Security Deposit till the end of the Defect Liability Period. | 922.6 | cum | 140.33 | ₹1,29,468.46 |
| 8 | Cement concrete (1:2:4) using 12 mm size hard black broken granite stone chips of approved quality & frorm approved quarry including hoisting,lowering & laying concrete & compacting by using vibrators,watering & curing for 4 weeks centering & shuttering & finishing the exposed surface smooth providing grooves of beads where necessary including cost,conveyance,royalties & taxes of all material & labour required for the work etc. complete excluding cost & conveyance of M.S. rod or steel & binding wires of 18 to 20 gauge & labour charges for straighting,cutting etc of the MN.S. rods or tor steel & tying grills & placing in proper position as per specification & direction of the Engineer-in-charge.
CC Approach Road | 5.63 | cum | 7,839.44 | ₹44,136.06 |
| 9 | Cement concrete of proportion (1:3:6) in foundation & floors using 4 cm (3/2") size clean hard black broken granite stone metal of approved quality & from approved quarry including hoisting,lowering & laying concrete in layers not exceeding 15 cm (6") thick to the required level ramming watering & curring etc. complete including cost & conveyance of all materials with alltaxes & royalties & all labour wuth T&P required for the work etc. complete including dewatering if required as per specification & direction of the Engineer-in-charge.
Building workCompound wall, CC Approach ,RCC Storm Water Drain | 184.97 | cum | 6,095.73 | ₹11,27,527.18 |
| 10 | Fly ash brick masonary in cement mortar (1:6) in foundation & plinth & basements & ornamental flower bed plinth moulding & similar such types of works with all necessary projections using fly ash bricks of 9"/10" size having a crushing strength of not less than 75 kg/cm2 including splays cutting circular moulding chamfering & cobelling watering & curing after immersing the bricks in water for six hours before use etc. complete including cost & conveyance of all materials & labour required for the work with all taxes & royalties etc. with all T&P complete in all respect as per specification & direction of the Engineer-in-charge.
Foundation and Plinth, Compound wall | 113.18 | cum | 5,879.88 | ₹6,65,484.82 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 5.44 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_606337.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].