Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 270 D 3RD FLOOR RABINDRA SARANI BURRABAZAR KOLKATA WEST BENGAL 700007 | KOLKATA | WEST BENGAL | 700007 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹25,053
Closing Date
13 Nov 2026, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE,SWEC,PWD, MIDNAPORE
OFFICE OF THE SUPERINTENDING ENGINEER (P.W.Dte) South-Western Electrical Circle PWD Compound,Midnapore,Paschim Medinipur
SITC of Hybrid roof top solar power generation system at Block-A building within the campus of Mahatma Gandhi College, Lalpur, Daldali, Purulia in the District of Purulia.
2026_WBPWD_5078125_2
WBPWD/SE/SWEC/NIQ43/2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
45 days
PURULIA
Please refer Tender documents.
3 documents required · 3 mandatory
₹25,053
OFFICE OF THE SE,SWEC,PWD,MIDNAPORE
17 Nov 2026
27 Oct 2026
17 Nov 2026
27 Oct 2026
13 Nov 2026
30 Oct 2026
29 Oct 2026
120 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Solar Module:
Supplying, Installation, Testing and Commissioning of MNRE (Ministry of Renewable Energy, Govt. of India)/ IEC approved Solar Module of Bifacial/ Monocrystaline cell with min. efficiency of 20% and fill factor more than 70%, laminated between sheet of -Ethylene Vinyl Acetate (EVA) and high transmissivity 3.2 mm tempered glass, framed in anodized aluminium frame. The power output of individual PV modules used in the PV array, under STC, should be a minimum of 500 Watt peak with adequate provision for measurement tolerances. Modules supplied with the Spy system should have certificate as per IEC61215 specification or equivalent National or International standards. Modules must qualify to IEC61730 part I and part II for safety qualification testing and Salt Mist Corrosion Testing as per IEC61701/IS 61701 and having warranty for output wattage, which should not be less than 90% at the end of 10 years and 80% at the end of 25 years.
Updated OEM / MAF must have to submit with the recommended data sheet [HR/Sova/Navitus/Renesys/Tata/Any MNRE approved] | 10,355 | Watt-peak | - | - |
| - | Supply and installation of Module Mounting Structure:
The PV modules shall be mounted on fixed metallic structures having adequate strength and appropriate design, which can withstand the load of the modules and high wind velocities. The array structure will be made of hot dip galvanized MS Angles of size not less than 50mm x 50 mm x 6 mm size / Aluminium (L Angle – 50 mm x 50 mm x 5 mm, U Channel – 33 mm x 30 mm x 33 mm x 3 mm). The Support structure shall be hot dip galvanized steel or aluminium.
Detailed specifications for the mounting structure are given below:
Wind velocity withstanding capacity: 150 km / hour
Structure material: Hot dip galvanised steel with a minimum galvanisation thickness of 80 microns or aluminium alloy.
Bolts, nuts,fasteners, panel mounting clamps: Stainless steel SS 304.
Mounting arrangement for metal sheet roofs: Mounting directly on the sheet metal, ensuring stability and wind withstanding capacity, or penetrating the sheet metal and fixing to the sub-structure, ensuring that the roof remains water proof and ensuring stability and wind withstanding capacity.
Installation:The structures shall be designed for simple mechanical on-site installation. There shall be no requirement of welding or complex machinery at the installation site.
Minimum distance between roof edge and mounting structure: 0.35m
Access for panel cleaning and maintenance: All solar panels must be accessible from the top for cleaning and from the bottom for access to the module-junction box.
Panel tilt angle: North – south orientation with a fixed tilt angle of 15 – 22 degrees (depending on location), south facing.
The mounting structure steel shall be as per latest IS 2062: 1992 and galvanization of the mounting structure shall be in compliance of latest IS 4Structural material shall be corrosion resistant and electrolytically compatible with the materials used in the module frame, its fasteners, nuts and bolts.
Aluminium structures also can be used which can withstand the wind speed of respective wind zone.
Necessary protection towards rusting need to be provided either by coating or anodization.
[Design to be approved by EIC before fabrication]. | 435 | KG | - | - |
| - | PCC Construction with Slopping, Plastering, Net Finishing with non-stagging of water Facility. The column must be 300 X 300 X 300 mm size. Ordrnary Cement concrete (mix 1:2:3) with graded stone chips (20 mm size) excluding shuttering and reinforcement (if required) [M15 Grade] | 1 | Set | - | - |
| - | Supplying, Installation, Testing and Commissioning of Hybrid Solar Inverter Rating: 10KW, 3Ph Inverter,
Total output power (AC): 10 kW.
Input DC voltage range: 160V-800 VDC.
Maximum power point (MPPT): tracking Shall be incorporated as mentioned above.
Number of independent MPPT inputs: 2 or more
Operation AC voltage: Three phase 400V (+ 12.5%, -20%)
Operating Frequency: range 45~55Hz
Nominal frequency: 50 Hz
Power factor of the inverter: 0.8 leading - 0.8 lagging
Total harmonic distortion: Less than 3%
Built-in Protection: AC high / low voltage; AC high /low frequency, SPD Type II At AC & DC SIde,
Anti-islanding protection: As per VDE 0126-1-1, IEC 60255.5 / IEC 60255.27
Operating ambient temperature range: -10 oC - +60 oC
Humidity: 0 – 95% Rh
Inverter efficiency: >=95%
Inverter weighted efficiency: >=94%
Protection degree: IP 65 for outdoor mounting, IP 54 for indoor mounting
Communication interface: RS 485 / RS 232 / RJ45
Safety compliance: IEC 62109-1, IEC 62109-2
Cooling: Convection
Display type : LCD for data display. LCD / LED for status display
Updated OEM / MAF must have to submit with the recommended data sheet [Make: VSOLE/THEA/STATCON ENERGIAA/GoodWe/SUNGROW] | 1 | Set | - | - |
| - | Supplying, Installation, Testing and Commissioning of Solar Battery
Rated Capacity-200Ah (12V)
Cycle Count-1500 @80% DOD, & 5000 @ 20% DOD.
self-discharge rate- 3% per month @ STC.
efficiency > 90% Ampere-Hour, & >80% Watt-Hour.
Low maintenance with a topping frequency of 8-10 months,
with Water level indicator.
Puncture-resistant polyethylene separator which minimize the possibility of internal short circuits. [Make: /Exide/Amaron/TATA] | 8 | Nos | - | - |
| - | Battery Rack
Sppply Fitting Fixing of Ground Mounted Battery Rack System Made Using Heavy Duty GI Bars and Angles, Capable of Holding 8 Nos 12V 150 Ah Tall Tubular Batteries | 1 | Nos | - | - |
| - | AJB (2 in 2 out):
Supply, installation , Testing and Commissioning of 01 Nos DC distribution box shall be mounted close to the solar inverter. The DC distribution box shall be of the thermo-plastic IP65 DIN-rail mounting type and shall comprise the following components and cable terminations:
▪ Incoming positive and negative DC cables from the DC Combiner Box;
▪ DC circuit breaker, 4 pole (the cables from the DC Combiner Box will be connected to this circuit breaker on the incoming side);
▪ DC surge protection device (SPD Make: Mersen/ABB/Lk(L&T)/ Elmax/Phonex), as per IEC 60364-5-53;
▪ Outgoing positive and negative DC cables to the solar grid inverter.
As an alternative to the DC circuit breaker a DC isolator may be used inside the DC Distribution Box or in a separate external thermoplastic IP 65 enclosure adjacent to the DC Distribution Box. If a DC isolator is used instead of a DC circuit breaker, a DC fuse shall be installed inside the DC Distribution Box to protect the DC cable that runs from the DC Distribution Box to the Solar Grid Inverter.
The Junction Boxes shall have suitable arrangement monitoring and disconnection for each of the groups. Voltage: Max. 1000V DC with all test certificate with Adequet size cable gland. | 1 | Set | - | - |
| - | DCDB:
Supply, installation , Testing and Commissioning of 1 Nos DC distribution box shall be mounted close to the solar grid inverter. The DC distribution box shall be of the thermo-plastic IP65 DIN-rail mounting type and shall comprise the following components and cable terminations:
▪ Incoming positive and negative DC cables from the Battery;
▪ DC circuit breaker, 2 pole (the cables from the DC Combiner Box will be connected to this circuit breaker on the incoming side);
▪ Outgoing positive and negative DC cables to the solar inverter.
As an alternative to the DC circuit breaker a DC isolator may be used inside the DC Distribution Box or in a separate external thermoplastic IP 65 enclosure adjacent to the DC Distribution Box. If a DC isolator is used instead of a DC circuit breaker, a DC fuse shall be installed inside the DC Distribution Box to protect the DC cable that runs from the DC Distribution Box to the Solar Grid Inverter.
The Junction Boxes shall have suitable arrangement monitoring and disconnection for each of the groups. Voltage: Max. 60V DC with all test certificate with Adequet size cable gland | 1 | Set | - | - |
| - | Supplying, Installation, Testing and Commissioning of Grid Interfacing pannel (GIP) 1 In 1 Out:
Designed for 10.0 KWp solar power plant with all protections as per MNRE guidelines.
AC DPBs shall have sheet from enclosure of dust & vermin proof conform to IP 65 protection. The bus bars are made of copper of suitable size. Suitable capacity fuse & MCBs/MCCB shall be provided for controlling the DC power output to the PCU along with necessary surge arrestors.
AC Distribution Panel Board (DPB) shall control the AC power from PCU/ inverter, and should have necessary surge arrestors.
Interconnection from ACDB to mains at LT Bus bar while in grid tied mode. All switches and the circuit breakers, connectors should conform to IEC 60947, part I, II and III/ IS60947 part I, II and III. All the Panel’s shall be metal clad, totally enclosed, rigid, floor mounted, air - insulated, cubical type suitable for operation on three phase / single phase, 415 or 230 volts, 50 Hz. All indoor panels will have protection of IP54 or better.
All outdoor panels will have protection of IP65 or better.
▪ Incoming 4.0 (Single Phase) cable from the solar grid inverter
▪ AC circuit breaker, 3-pole / 4-pole
▪ AC surge protection device (SPD), class 2 as per IEC 60364-5-53
▪ Outgoing cable to the building electrical distribution board.
[Make: ABB/LK(L & T)/Schneider] | 1 | Nos | - | - |
| - | ACDB:
Supplying, Installation, Testing and Commissioning of the AC Distribution Panel Board (DPB6) shall have a sheet / PVC from the enclosure of dust & vermin proof conforming to IP 65 protection. The bus bars are made of copper of suitable size. Suitable capacity fuse & MCB/MCCB shall be provided for controlling the DC power output to the PCU along with necessary surge protectors.
The AC Distribution Panel Board (DPB) shall control the AC power from the PCU/inverter and should have necessary surge protectors.
Interconnection from ACDB to main at LT Bus bar while in grid-tied mode. All switches and the circuit breakers, connectors should conform to IEC 60947, part I, II and III and IEC 60947 part I, II and III. All the panels shall be metal clad, ideally enclosed, resilient, floor mounted, air-insulated, and with the switch for operation on three-phase/single-phase, 415 or 230 volts, 50 Hz. All indoor panels will have a protection of IP54 or better.
All outdoor panels will have protection of IP68 or better with competible braking capacity for Solar System with branded make braking with protection system. | 1 | Set | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
Tendernotice_2.pdf
PDF • 1.59 MB
2911.pdf
Tender Documents • 0.51 MB
NIQ43Retender.pdf
Tender Documents • 1.56 MB
BOQ_5191254.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .