| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical | Rejected-Technical non compliance of tender condition. |
Tender Value
Refer Docs
Closing Date
21 Dec 2024, 6:00 pmClosed
DGM SRM
P O PERMUNAOOR SRM DEPT COCHIN SHIPYARD LTD KERALA
ACCOMMODATION REPAIR JOBS FOR THE VESSEL MV SWARAJ DWEEP AT CKSRU, KOLKATA
2024_CSL_219569_1
KP1/Accommodation Repair Jobs/MV Swaraj Dweep/CKSRU
Open Tender
Marine Services
Turn-key
30 days
CKSRU KOLKATA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
30 Dec 2024
16 Dec 2024
23 Dec 2024
16 Dec 2024
21 Dec 2024
16 Dec 2024
16 Dec 2024 - 19 Dec 2024
PANELS REMOVAL AND REFITTING ***Panels should be placed in proper manner at suitable location
1)BULKHEAD PANELS REMOVAL AND REFITTING ***Panels should be placed in proper manner at suitable location
2)DECK HEAD PANELS REMOVAL AND REFITTING ***Panels should be placed in proper manner at suitable location
3) VERTICAL PANELS TO BE RENEW WITH. APPROVED TYPE FIRE RETARDANT PANELS ( SIZE : 2.15 MTR X 1.3 MTR X 20 MM THICK - GYPSUM BOARD ) - CONTRACTOR SUPPLY.
1)PANEL RENEWAL ***MATERIALS CONTRACTOR SUPPLY.
1)EXISTING INSULATION LAGGINGS TO BE REMOVED SAME TO BE RE-USED DURING RE-FITTING OF THE PANELS.
2)Renewal of Lagging CERTIFIED CLASS-A LAGGING ***All material contractor supply
REMOVAL AND REFITTING OF INSULATION AND BULKHEAD SHEET
1ST DECK: IN DRINKING WATER COMPARTMENT 139 CEILING BROKEN SAME TO BE RENEWED
IN 2ND DECK LOBBY ROOM SKYLIGHT BULKHEAD PANNEL BROKEN SAME TO BE RENEWED. NECESSARY CLAMPING TO BE WELDED
2ND DECK: BULKHEAD PANNEL NEAR 216 HYDRAULIC ROOM PARTED. SAME TO BE RENEWED. APPROX SIZE 1200MM X 2500M
1)IN 3RD DECK 2ND CLASS FWD. PORTION 4NOS. SHOWER ROOM BULKHEAD AND DECKHEAD DAMAGED AND BROKEN, SAME TO BE COMPLETELY RENEWED WITH GYUPSUM BOARDS AND GI CEILING. NECESSARY CLAMPING TO BE WEILDED AND ON COMPLETION PROPER SEALING TO BE DONE .
2)Remove & refit of pipe SCH80 GI 40NB PIPE
IN DELUX CABINS FRIDGE COMPARTMENT BULKHEAD PANEL BOTTOM PORTION BROKEN AND WASTED , SAME TO BE RENEWED APPROX 2 SQ MTR X 6 NOS
IN CREW AND OFFICER GALLEY PORT HOLE BOX BOTTOM PANEL BROKEN IN 6 NOS. SAME TO BE RENEWED. APPROX SIZE 670MM X 330MM. NECESSARY SUPPORT ANGLE TO BE WELDED.
205- CEILING PANEL CORRODED AND WASTED SAME TO BE RENEW
2ND DECK: IN WC 262 CEILING PANNEL CORRODED AND WASTED, SAME TO BE RENEWED NECESSARY CLAMPING TO BE WELDED
1)BOX TYPE CEILING PANEL IN BUNK AREA ARE MISSING, SAME TO BE FITTED. SIZE: 150 MM . ***MATERIAL CONTRACTOR SUPPLY.
2)BOX TYPE CEILING PANEL IN BUNK AREA ARE MISSING, SAME TO BE FITTED.SIZE 550 MM . ***MATERIAL CONTRACTOR SUPPLY.
3)BOX TYPE CEILING PANEL IN BUNK AREA ARE MISSING, SAME TO BE FITTED.SIZE 600 MM . ***MATERIAL CONTRACTOR SUPPLY.
NEAR ENTRANCE CEILING PANEL AND HOLDING CLAMP CORRODED & WASTED, SAME TO BE RENEWED.
264 (A) - CEILING PANEL TO BE RENEWED. (APPROX. 850 MM X 500 MM)
APPROX. 10 SQ. METERS CEILING TO BE RENEWED IN 107 W.C.
125 - CEILING APPROX. 3 SQ. METERS TO BE RENEWED.
INSIDE BLOWER TRUNKING , CEILING (APPROX> 250 MM X 500 MM ) TO BE RENEWED.
TANK NO. 21 STBD TANK TOP BUNK CLASS ACCOMMODATION REMOVAL AND REFITTING OF BUNK BED
REMOVAL AND REFITTING OF BULKHEAD PANNEL.
CARPENTARY / PANELING JOBS :
BRIDGE WINGS: 4 NOS. WOODEN GRATINGS(1M X 1.5M) EACH TO BE RENEWED.
CARBYN'S COVE - 1 NO. REVOLVING BAT STOOL TO BE REPAIRED.
2ND DECK : NEAR HYDRAULIC ROOM HYDRANT BOX DOOR FRAME CORRODED AND WASTED. APPROX SIZE 800MM X 500MM SAME TO BE RENEWED.
WOODED DOORS ARE NOT CLOSING PROPERLY SAME TO BE RECTIFIED NECESSARY REPAIRS TO BE DONE. RENEWAL OF HINGES WITH HEAVY DUTY HINGES WELDED TO BULKHEAD. ADJCENT BULKHEADS AND FRAME TO BE STRENGTHEN/ RENEWED WITH NECESSARY CLAMPING.
IN PASSENGER AND CREW ACCOMMODATION. SOFA IS BROKEN SAME TO BE REPAIRED BY RENEWAL OF PLY WOOD, CUSHION IN NECESSARY STRENGTHENING TO BE DONE.
IN PASSENGER AND CREW ACCOMMODATION READING TABLE, TEA TABLE AND CUPBOARD BROKEN SAME TO BE REPAIRED SUITABLY. APPROX SIZE 1.5 METERS X 1 METER EACH
1ST DECK : IN BUNK PANTRY MAIN ENTERANCE WOODED DOOR HINGES BROKEN SAME TO BE REPAIRED AND DOOR TO BE ALIGNED.
2ND DECK : IN BUNK PANTRY MAIN ENTERANCE WOODED DOOR HINGES BROKEN SAME TO BE REPAIRED AND DOOR TO BE ALIGNED.
IN VARIOUS PAX CABIN TEA TABLE BROKEN AND WASTED , SAME TO BE RENEWED APPROX SIZE 800 MM X 1200 MM WITH LEGS AND DOOR
1)SUPPLY OF DOORS ALONG WITH STEEL DOOR FRAME. DOOR TYPE"B" CLASS. APPROX DOOR SIZE 1750MM X 630MM X 50MM
2)ACCOMODATION W.C DOORS TO BE RENEWED ALONG WITH STEEL DOOR FRAME.NECESSARY STRENGHTENING OF BULKHEAD TO BE DONE.
REMOVING AND REFITTING OF WOODEN DOORS.
REMOVING AND REFITTING OF DOOR
REMOVING AND REFITTING OF DOOR
IN 4TH DECK PORT SIDE BELOW LIFE BOAT NO. 10 REMOVAL AND REFITTING OF ISPS DOORS.
IN 4TH DECK CRANE NO. 03 ENTERANCE DOOR COMPRESSION BAR CORRODED AND WASTED, DOOR NOT CLOSING PROPERLY, SAME TO BE RECTIFIED. APPROX DOOR SIZE 1800MM X 650MM
STBD SIDE WEATHERTIGHT DOOR'S COMPRESSION BAR TO BE RENEWED. ( APPROX. 50 MM X 1.5 METERS) INCLUDING REMOVING AND REFITTING OF WOODEN DOOR.)
1)STBD SIDE SHIP'S GANGWAY AFT RAM DOOR'S FRAME CORRODED AND WASTED: FOR THE LENGTH OF 1 METER AND 150 BULB ANGLES
2)HINGES TO BE RENEWED APPROX. SIZR : 600 MM X 300 MM X 20 MM.
IN MAIN DECK FWD. HOLD NO. 02 OPERATING BOX COMPRESSION BAR AND DOOR CORRODED AND WASTED, SAME TO BE RENEWED. APPROX DOOR SIZE 650MM X 450MM.
IN 262 MAIN ENTERANCE DOOR AND INNER MAIN DOOR FRAME CORRODED AND WASTED FOR HEIGHT OF 500MM , SAME TO BE RENEWED 50MM L- ANGLE X 2000MM
IN WC 232 MAIN ENTERANCE DOOR FRAME CORRODED AND WASTED SAME TO BE RENEWED FOR A HEIGHT OF 500MM WITH 50MM L-ANGLE X 2000MM.
IN 264K WC DOOR FRAME AND 264 WC INNER ENTERANCE DOOR FRAME CORRODED AND WASTED SAME TO BE RENEWED 50MM L- ANGLE X 2000MM.
IN 2ND DECK WC. 218 CLEANING GEAR COMPARTMENT DOOR FRAME CORRODED AND WASTED SAME TO BE RENEWED FOR A HEIGHT OF 2000MM FROM BOTTOM LEVEL AND ADJECENT BULKHEAD PANNEL TO BE FIXED.
IN WC 232C ( CREW ACCOMMODATION) PARTITION BULKHEAD FWD PORTION WASTED SAME TO BE REPAIRED WITH STAINLESS STEEL SHEET 3MM.
IN 263 WC DOOR FRAME CORRODED AND WASTED FOR HEIGHT OF 500MM , SAME TO BE RENEWED 50MM L- ANGLE X 2000MM
IN 265 WC DOOR FRAME CORRODED AND WASTED FOR HEIGHT OF 500MM , SAME TO BE RENEWED 50MM L- ANGLE X 2000MM
DOOR FRAME ( 50 MM L ANGLES X 1.5 METERS) CORRODED & WASTED, SAME TO BE RENEWED.
271: DOOR FRAME CORRODED & WASTED.( APPROX. 50MM L ANGLES X 1.5 METERS.
264 (A) DOOR'S FRAME 50 MM L ANGLES TO BE RENEWED AROUND 5.5 RUNNING METERS.
231- DOOR FRAME'S 50 MM L ANGLES TO BE RENEWED APPROX. 1.5 RUNNING METERS.
262 ( A) - DOOR'S FRAME CORRODED & WASTED , SAME TO BE RENEWED, ( L ANGLES 50MM X 1.5 METERS APPROX.)
266 - SHOWER ROOM'S DOOR FRAME TO BE RENEWED,( L ANGLES 50 MM X 1.5 METERS APPROX.)
109 B - DOOR DAMAGED SAME TO BE RENEWED. ( APPROX. DOOR SIZE: 750 MM X 1800 MM X 1 INCH)
109- MAIN ENTRANCE DOOR FRAME BOTTOM L ANGLES 50 MM X 2 METERS(APPROX.) TO BE RENEWED.
109 A - DOOR FRAME BOTTOM L ANGLES 50 MM X 10 METERS(APPROX.) TO BE RENEWED
125- INSIDE DOOR FRAME 50 MM L ANGLES APPROX. 1.5 METERS TO BE RENEWED.
MISCELLANEOUS WORKS :
2ND DECK BUNK PANTRY S.S. CEILING HOLDING BRACKET FROM DECK HEAD CORRODED AND WASTED, SAME TO BE RENEWED.(70MM. X 70 MM ) INCLUDING CEILING REMOVING AND REFITTING.
2ND DECK BUNK MESS ROOM CHAIRS BACK REST WITH CUSHION NEEDS TO BE RENEWED. ( SIZE: 300 MM X 350 MM )
VERTICAL BULKHEAD SKIRTINGS ARE MISSING SAME TO BE RENEWED WITH SS /PVC STRIPS APPROX 50 MMX 200 RUNNING MTRS
IN ACCOMMODATION AREA LADDERS ANTI SKID STRIPS ARE MISSING , SAME TO BE RENEWED WITH ANTI SKID STRIPS WITH THROUGH AND THROUGH HOLE AND SS BOLT NUTS ANTI-SKID STRIPS CONTRACTOR SUPPLY.
VINYL FLOORING WORKS
DAMAGED VINYL SHEET TO BE RENEWED AT VARIOUS PLACES. ( 1ST DECK 2ND DECK AND 3RD DECK 4TH DECK 5TH DECK 6TH DECK 7 DECK & 8TH DECK ). PRIOR PASTING THE VINYL SHEET THE EXISTING FLOOR TO BE REMOVED NEW LIGHT WEIGHT FLOOR COMPOUND OF 25MM HEIGHT TO BE LAID LEVELED PROPERLY DRIED AND THEN THE VINYL SHEET TO BE LAID & PASTED . THE VINYL SHEET WHICH WILL BE USED FOR RENEWAL SHOULD MATCH IN COLOUR WITH THE EXISTING ADJACENT FLOOR VINYL SHEET. IN THIS WORK ANY UNEVEN SURFACE / WAVINGS OF THE SHEET / AIR LOCK INSIDE THE VINYL SHEET WILL NOT BE ACCEPTED. FINALLY VERTICAL BULKHEAD BOTTOM SKIRTING METAL STRIPS TO BE REFITTED IN PLACE. (NOTE : VINYL SHEET COLOUR/DESIGN/QUALITY AS PER INSTRUCTION OF YARD&SHIP STAFF)
REMOVAL AND REFITTING OF VINYL FLOORING & FLOORING COMPOUND
TILES WORKS
TILES ( NON - SKID TYPE AND MATCHING COLOUR WITH THE EXISTING ADJACENT FLOOR TILES ) TO BE RENEWED AT VARIOUS BATH ROOMS TOILETS GALLEYS ACCOM ENTRANCES ETC. PRIOR LAYING THE TILES THE EXISTING FLOOR COMPOUND TO BE REMOVED AND A FRESH LIGHT WEIGHT FLOOR COUMPOUND TO BE PUT AND PROPERLY LEVELED. AND SURVEYEOR RECOOMEDATION ALSO ATTENDED APPROX . TILES - CONTRACTOR SUPPLY.
IN 1ST DECK , ANIDCO FRIDGE ROOM TILES AND INSULATION ARE BROKEN, SAME TO BE RECTIFIED, REQUIRED TO LAY PUFFED FOAM INSULATION AND CEMENTING. WITH TILES
IN MASTER CABIN BATHROOM TILES FOUND DAMAGED, SAME TO BE RENEWED. APPROX AREA 6 SQ MTRS.
TANK NO. 21 STBD TANK REMOVAL AND RELAYING OF FLOORING, CEMENTING AND VINYL SHEET.
IN WC 264 REMOVAL AND RELAYING OF TILES .
IN 1ST DECK BUNK PANTRY REMOVAL AND RELAYING OF TILES.
PORT HOLE DEFECTS
COMPRESSION BAR PORT HOLE GLASS LOCKING RING IN 1ST , 2ND &3RD DECK ( INNER DIA : 400MM BRASS MATERIAL ) & ITS COAMING TO BE CHECKED FOR WEAR DOWN IF REQUIRED SAME TO BE RENEWED SUITABLY. AFTER RENEWAL . SATISFACTORY HOSE TESTING TO BE SHOWN TO SURVEYOR .***BRASS RING CONTRACTOR SUPPLY.
HOSE TESTING TO BE DONE ON 4TH & 5TH & 6TH & 7TH DECK RECTANGULAR PORT HOLES TO FIND OUT THE LEAKAGES PRIOR REPAIRING . LEAK IN PORT HOLES RUBBER PACKING TO BE RENEWED COMPRESSION BAR & ITS COAMING TO BE CHECKED FOR WEAR DOWN IF REQUIRED SAME TO BE REPAIRED SUITABLY. ASSUME 40% OF THE PORT HOLES REQUIRE RUBBER PACKING RENEWAL & 30 % OF THE PORT HOLES REQUIRE COMPRESSION BAR & ITS COAMING RENEWAL. FINALLY PORT HOLES TO BE HOSE TESTED SATISFACTORILY IN PRESENCE OFYARD & SHIP STAFF.
4TH DECK : PORT HOLES : 57 NOS SIZE : 800 X 580 MM
5TH DECK : PORT HOLES : 15 NOS SIZE : 1400 X 590 MM
5TH DECK : PORT HOLES : 40 NOS SIZE : 800 X 580 MM
6TH DECK : PORT HOLES : 18 NOS SIZE : 800 X 580 MM
7TH DECK : PORT HOLES : 16 NOS SIZE : 800 X 580 MM
PORT HOLES OF 1ST, 2ND AND 3RD DECK TO BE HOSE TESTED ,AND RENEWAL OF RUBBER BEADING AND SAME TO BE SHOWN TO SHIPS STAFF/SURVEYOR.
01 NO.RADAR MAST WEATHER TIGHT DOOR NOT CLOSING PROPERLY SAME TO BE ATTENDED
FUNNEL DECK PLATE (STBD SIDE) PANEL REMOVING AND REFITTING)
LONG PORT HOLE PORT SIDE (APPROX. SIZE: 1.45 MM X 600 MM) GLASS BROKEN , SAME TO BE RENEWED.(GLASS SHIP SUPPLY)
2 NOS. PORT HOLES OF CORBINES COVE(STBD SIDE) PARTED WITH BULKHEAD, SAME TO BE RENEWED. ( APPROX. SIZE 650 MM X 1450 MM)
WATER TIGHT DOORS- MAKE:Winel Tm Electro-Hydraulic, Type-Seagull.
All water tight doors to be check for proper operation
WASHING MACHINE-MAKE: NYBORG, TYPE-1803, CAPACITY 1:10, 22KG, NOT WORKING SAME TO REPAIR AND SATISFACTORY TRIAL TO BE SHOWN TO SHIP STAFF.
THE FOLLOWING GAUGE GLASS TO RENEW. (G/GLASS CONTRACTOR SUPPLY)
Hot well gauge glass:- Length=1008mm(in three pieces)
L.T. Gauge glass. Total Length=1000mm (in three pieces)
H.T. Gauge glass. Total Length=1500mm (in Five pieces)
Technical Tank Gauge Glass: L=1000mm( in three Pieces.)
Chillers Tank Gauge Glass: L=880mm( in three Pieces.)
BATH ROOM REPAIRS
BATHROOM CUBICAL APPROX SIZE 3SQ.M. THE BATHROOM CUBICALS BOTTOM TUB IS CORRODED AND HOLED. SAME TO BE CROPED AND RENEWED AT THE BOTTOM PORTION AND CUBICAL VERTICAL SIDES ALSO TO BE RENEWED FOR A HEIGHT 500mm ALL AROUND THE CUBICAL AS SAME ARE CORRODED AND WASTED .THE PLATE BELOW BATHROOM CUBICAL BOTTOM ARE CORRODED SAME TO BE CHECKED AND IF REQUIRED TO CROPED AND RENEWED APPROX 6sqmt. WHILE DOING THIS REPAIR BATHROOM CUBICAL, ADJACENT BULKHEADS TO BE REMOVED AND REFIT, AND BELOW ACCOMMODATION DECK HEAD PANEL INCLUDING LAGGINGS TO REMOVE AND REFIT APPROX 10sqmt, WHILE DOING THIS REPAIR THE WASH BASIN DRAIN PIPE, BATHROOM SCUPPER 2NOS, COMMODE DISCHARGE LINE ALL TO BE BLANKED AND IF ANY LINE FOUND CHOKED, SAME TO BE CLEARED AT THE END OF TUB RENEWAL AND THESE LINES TO BE MADE OPERATIONAL AND SHOWN TO SHIP STAFF NOTE: EXISTING INULATIONS LAGGING TO BE REMOVE IN PROFESSIONAL MANNER AS SAME TO BE REUSED DURING REFITTINGOF THE PANELS. ASSUME 10% OF LAGGING REQUIRES RENEWAL IF DAMAGE THE FOLLOWING MATERIALS MAY BE TAKEN OUT DURING THE JOB FOR EACH CABIN A. COMMODE AND FLUSH TANK- 1SET B.WASH BASIN- 1NOS. C.SHOWER MIXER- 1NO D. DRAINAGE SCUPPER- 3NOS. E. ELECTRICAL SWITCH-1 NO F. VERTICAL PANELING OUTSIDE CABIN – 6sqmt G. VERTICAL PANELING INSIDE CABIN -5sqmt H. BED -1NO I. BATHROOM DOOR AND FRAME- 1SET J. NON- SKID TILES- 2SQM,TILES COLOUR OF SHIP STAFF CHOICE FOR ATTENDING THE JOBS THE FOLLOWING MENTION ITEMS ( A TO J ) TO BE REMOVE AND REFIT IN EACH BATHROOM. IN CASE OF ANY OF THE ABOVE THE ITEMS GETS DAMAGE WHILE REMOVAL/ REFITTING, SAME TO BE RENEWED.
CABIN- 405, 424, 433, 453, 507, 508, 526, 605, 803 & STBD OWNERS CABIN -- BATHROOM CUBICAL TO BE RENEWED.(Refer DD24013.1)*** MATERIAL CONTRACTOR SUPPLY
CABIN - 430 -- WESTERN TOILET SUPPORT PLATE WITH ANGLES.
CABIN - 510 BATHROOM REMOVAL AND REFITTING
CABIN 607 & 611 - COMMODE SUPPORT FROM BACKSIDE TO BE RENEWED.
BATH TUB TOP PORTION OF THE CUBICAL AREA TO BE PROPERLY FIBRE COATED ATLEAST 03 LAYERS TO AVOID WATER LEKAGE INTO THE CABIN. FINALLY WATER PROOF LIGHT WEIGHT CEMENT FLOORING OF ONE INCH THICK TO BE DONE AT THE TUB BOTTOM ( APPROX AREA 3 SQM ). WATER PROOF LIGHT WEIGHT CEMENT & FRP -CONTRACTOR SUPPLY.
VINYL FLOORING AROUND BATH ROOM AREA TO BE RENEWED ALONG WITH FLOOR PREPARATION. ASSUME IN EACH CABIN 06 SQM (Total 6sqm X 10 nos = 60sqm) FLOOR VINYL SHEET RENEWAL WITH LIGHT WEIGHT UNDERLAY OF ONE INCH THICNESS APPROX. VINYL SHEET & LIGHT WEIGHT UNDERLAY COMPOUND - CONTRACTOR SUPPLY. ( NOTE : VINYL SHEET COLOUR/DESIGN/QUALITY AS PER INSTRUCTION OF YARD&SHIP STAFF ).
IN CASE IF THE VERTICAL BULKHEAD PANELS' BOTTOM GETS DAMAGED WHILE REMOVAL OF THE SAME THEN THEY TOO TO BE SUITABLY REPAIRED. ASSUME 4 SQM AREA MAY REQUIRE REPAIR.
IN WC 264 REMOVAL AND REFITTING OF INDIAN AND WESTERN COMMODES ( 4NOS), INCLUDING REMOVAL AND REFITTING OF FRESH WATER SUPPLY AND DRAIN LINES.
DECK NO-1 105 BAGGAGE ROOM REMOVAL AND REFITTING OF W.C.
BUNK GALLEY PORT AND STBD REMOVAL AND REFITTING OF 6NOS WASH BASIN AND PIPE LINES.
IN 265 WC WASHBASIN CLAMPING BROKEN SAME TO BE RENEWED.
IN 232 SHOWER PARTITION BULKHEAD BOTTOM PORTION WASTED, SAME TO BE RENEWED WITH STAINLESS STEEL SHEET FOR ABOUT 1SQ METER.
IN BUNK CLASS BATHROOM AND WC, 10 NOS DOOR, HINGES BROKEN, SAME TO BE WELDED WITH HEAVY DUTY HINGES AND TO BE FIXED WITH THROUGH AND THROUGH BOLT NUTS :- 03 NOS HINGES IN EACH DOOR
IN 215 WC COMMODE CHAMBER
FW SUPPLY LINE(SCH 80,GI 50NB) CORRODED AND SAME TO BE RENEWED
REMOVAL AND REFITTING OF STAINLESS STEEL COMMODE
RENEWAL AND RELAYING OF TILES APPROX 3 SQM
Island Ship Repairers (BID ID -793342)
SGS Marine Habitability Pvt Ltd (BID ID -793249)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .