Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAdmitted-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L1 | Admitted-Finance | |
| 2 | L2₹2.8 L+₹13,814.19 (5.12%)Admitted-Finance AT ARGADA DISTT RAMGARH JHARKHAND | L2 | Admitted-Finance | |
| 3 | L3₹4.2 L+₹1.5 L (55.5%)Admitted-Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | L3 | Admitted-Finance | |
| 4 | L4₹4.4 L+₹1.7 L (61.3%)Admitted-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | L4 | Admitted-Finance | |
| 5 | L5₹4.5 L+₹1.8 L (65.6%)Admitted-Finance ARGADA RAMGARH JHARKHAND 829101 | RAMGARH | JHARKHAND | 829101 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | coalfields engineering works L4 | M/S ADITYA ENTERPRISES L3 | M/S VAISHALI ELECTRIC COMPANY L5 | CENTRAL ENGINEERS L1 | Maa Katyayani Enterprises L2 |
|---|---|---|---|---|---|---|---|---|
| 2.00 | Cost of Copper wire with DPC Covering. Size - 9 SWG | 390 | KG | 1,376.7 ₹5,36,913 | 1,327.5 ₹5,17,725 | 1,414 ₹5,51,460 | 900 ₹3,51,000 | 897.3 ₹3,49,947 Lowest |
| 3.00 | Insulation cost @ 15% of wire cost | 1 | L/S | 80,536.95 ₹80,536.95 | 77,658.75 ₹77,658.75 | 82,719 ₹82,719 | 52,650 ₹52,650 | 52,492.05 ₹52,492.05 Lowest |
| 4.00 | Labour cost @ 15% of wire cost | 1 | L/S | 80,536.95 ₹80,536.95 | 77,658.75 ₹77,658.75 | 82,719 ₹82,719 | 52,650 ₹52,650 | 52,492.05 ₹52,492.05 Lowest |
| 5.00 | Less Scrap value @60% on Sl No-1 | 1 | L/S | 3,22,147.8 ₹-3,22,147.8 | 3,10,635 ₹-3,10,635 | 3,30,876 ₹-3,30,876 | 2,10,600 ₹-2,10,600 | 2,09,968.2 ₹-2,09,968.2 Lowest |
| 6.00 | Cost of LT Bushing Insulator with Studs | 2 | nos | 7,165 ₹14,330 | 6,910 ₹13,820 | 7,360 ₹14,720 | 2,000 ₹4,000 Lowest | 4,670 ₹9,340 |
| 7.00 | Cost of Gasket/Corksheet | 2 | nos | 2,845 ₹5,690 | 2,745 ₹5,490 | 2,830 ₹5,660 | 1,200 ₹2,400 Lowest | 1,855 ₹3,710 |
| 8.00 | Profit @ 10% | 1 | L/S | 39,585.91 ₹39,585.91 | 38,171.75 ₹38,171.75 | 40,640.2 ₹40,640.2 | 17,900 ₹17,900 Lowest | 25,801.29 ₹25,801.29 |
| 9.00 | Total impact of GST for the purpose of CTC | 1 | nos | - | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹5,800
Closing Date
11 Aug 2025, 6:55 pmClosed
SO(ENM)
GM UNIT KUJU
Repairing and rewinding of One no.500KVA, 11 KV/415V, Make - PEE, Distribution Transformer installed at main substation of Karma Project under Kuju Area.
2025_CCL_340679_1
GM (K)/EnM/eTender/24-25/116
Open Tender
Electrical and Maintenance Works
Item Rate
20 days
GM UNIT KUJU
2 documents required · 2 mandatory
₹5,800
9 Oct 2025
1 Aug 2025
12 Aug 2025
1 Aug 2025
11 Aug 2025
1 Aug 2025
1 Aug 2025 - 8 Aug 2025
Amount
Cost of Copper wire with DPC Covering. Size - 9 SWG
Insulation cost @ 15% of wire cost
Labour cost @ 15% of wire cost
Less Scrap value @60% on Sl No-1
Cost of LT Bushing Insulator with Studs
Cost of Gasket/Corksheet
Profit @ 10%
Total impact of GST for the purpose of CTC
Maa Katyayani Enterprises (BID ID -1174629)
M/S ADITYA ENTERPRISES (BID ID -1174605)
coalfields engineering works (BID ID -1174594)
M/S VAISHALI ELECTRIC COMPANY (BID ID -1174752)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .