| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance KARUR | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
29 Jul 2022, 3:00 pmClosed
District Collector/Chairman
IInd Floor, DRDA, Collectorate, Karur
Cremation of Infrastructure facilities to the Cremation shed in 2 Nos Village Panchayats in Kulithalai Block of Karur District under AGAMT II 2021-22
2022_RDTN_238206_4
Karur District-Kulithalai Block-AGAMT-II 2021-22
Open Tender
Civil Works - Others
Item Rate
90 days
IInd Floor, DRDA, Collectorate
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,000
Yes
IInd Floor, DRDA, Collectorate
4 Aug 2022
30 Jun 2022
29 Jul 2022
30 Jun 2022
29 Jul 2022
30 Jun 2022
8 Jul 2022
Amount
Name of the Work : Construction of Cremation shed, Compound wall (20m) and CC pavement (54m) at Pudur Samathuva Mayanam H/O Inungur Panchayat.Kulithalai Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Supplying and erecting centring for sides centering for soffits of rcc slabs of plane surface like lintels,beams etc, including strutting 3m high using mild steel sheeets of size 90cmx60cmxand B>G 10 stiffened with M.S angles of size 25mmx25
Above ground level
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
plastering surface of rcc items such as slab, beam,sunshade with cement mortor 1:3 - 10mm thick including packing providing cement mortor beading for sunshades staircase, steps lands slabs etc, as directed by departmental officers etc, complete
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Colour washing with Exterier Emulsion Painting two coats using shell lime including costand conveyance of all materials to site and labour charges etc complete
Cement concrete 1:2:4 mix ( one cement two sand and four aggregate)using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Construction of Compound wall (Sub Estimate)
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and centering shuttering including necessary supports for plane surface in foundation and basement ad in all floors for RCC column footing column plinth beam roof slabs, staircase steps, bed blocks, critical pier etc.
Brick work in cement mortar 1:3 using country bricks of size 83/4"x41/4"x23/4" etc., complete., With W.P.C. 2%
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete .
Providing Cement Concrete pavement (Sub Estimate)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and erecting, centering by strutting using MS Sheets and casurina props including cost of material charges and all other labour charges etc, complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Provision for Bitumen Pad
Construction of Cremation shed, Compound wall (10m) and CC pavement (30m) at Rajendram Samathuva Mayanam H/O Rajendram Panchayat.Kulithalai Union Karur District.
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Brick work in cm 1:5 mix(one cement and five sand )using fly ash bricks ground maded of size 23 x 11 x 7 cm including curing,finishing and cost & Conveyance of all materials etc., complete.
Supplying and erecting centring for sides centering for soffits of rcc slabs of plane surface like lintels,beams etc, including strutting 3m high using mild steel sheeets of size 90cmx60cmxand B>G 10 stiffened with M.S angles of size 25mmx25
Above ground level
Supplying fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete
RCC 1: 1/2 :3 mix using 20 mm ISS HBG metal for RCC items of work excluding items of works excluding centering,shuttering, and ost of reinforcement grill ,out including curing etc complete and also including fixing fan clamps and ixtures in rcc works wh
plastering surface of rcc items such as slab, beam,sunshade with cement mortor 1:3 - 10mm thick including packing providing cement mortor beading for sunshades staircase, steps lands slabs etc, as directed by departmental officers etc, complete
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Colour washing with Exterier Emulsion Painting two coats using shell lime including costand conveyance of all materials to site and labour charges etc complete
Cement concrete 1:2:4 mix ( one cement two sand and four aggregate)using 20mm gauge hand broken granite tone jelly for foundation including dewatering if found ecessary and laid in layers of not more than 15 cm thick and compacted,etc., complete complying with standard specfication
Construction of Compound wall (Sub Estimate)
Earth work excavation for foundation in all clauses of soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and boiling out water whenever necessary et complete complying with standard specification
Cement concrete 1:4:8 [one cement four sand and eight jelly] using 40.m.m. H.B.G.Jelly for foundation including watering whereever necessary and laid in layers not more than 15.c.m. thick compacting etc. complete complying with standard specification and as directed.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supplying and centering shuttering including necessary supports for plane surface in foundation and basement ad in all floors for RCC column footing column plinth beam roof slabs, staircase steps, bed blocks, critical pier etc.
Brick work in cement mortar 1:3 using country bricks of size 83/4"x41/4"x23/4" etc., complete., With W.P.C. 2%
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick including cost and conveyance of all materials in all floors etc.,as directed by departmental officers etc, complete complying with standard specifications.
Painting two coats with ready mixed Exterior Emulsion paint of approved qualityand colour over a priming coat, including through scrapping,clean removel of dirt etc complete .
Providing Cement Concrete pavement (Sub Estimate)
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Supply and erecting, centering by strutting using MS Sheets and casurina props including cost of material charges and all other labour charges etc, complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for 10 cum.
Provision for Bitumen Pad
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Sri Navaladiyar And Co
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .