Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹12.6 L+₹2,231 (0.18%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Chandrakant Narayan Gawas L1 | FATO A GAONKAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottomS, lift upto 1.5m including getting out the excavated soil and disposal of surplus excacated soil as directed within a lead of 50m.
a) All kind of soil | 104 | Cum | 295 ₹30,680 Lowest | 296 ₹30,784 |
| 2.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 20 | Cum | 2,310 ₹46,200 Lowest | 2,315 ₹46,300 |
| 3.00 | Providing & Laying cement 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering & shuttering and finishing in
a) All works upto Plinth level | 76 | Cum | 7,110 ₹5,40,360 Lowest | 7,111 ₹5,40,436 |
| 4.00 | Providing & Laying cement 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering & shuttering and finishing in
b) In retaining walls, return walls (any thk) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping bed blocks, anchor blocks, plain window sills, fillets etc, upto floor five level. | 71 | Cum | 7,765 ₹5,51,315 Lowest | 7,766 ₹5,51,386 |
| 5.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while laying pipes of approved the concrete of retaining wall, wing wall and earth retaining structure complete as directed by the Engineer incharge.
a) 110mm dia | 30 | Rmt | 375 ₹11,250 Lowest | 380 ₹11,400 |
| 6.00 | Centering and shuttering including struttings, propping etc. and removal of formworks for:
a) Foundation, footings, bases of coulmns and mass concrete. | 173 | M2 | 425 ₹73,525 Lowest | 435 ₹75,255 |
Tender Value
₹14.2 L
EMD Value
₹28,327
Closing Date
25 Nov 2025, 5:30 pmClosed
EEVI, WRD, Bicholim
EEVI, WRD, Bicholim
Improvement and renovation to the Ganapati Visarjan Platform with footpath at Gauthan, Sankhali in Sankhali Constituency.
2025_WRD_26335_1
WRD/WDVI/PB/F.30/TN e 35/2025-26/698 line 15 Dated 12/11
Open Tender
Civil Works - Water Works
Item Rate
60 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹28,327
23 Jan 2026
14 Nov 2025
26 Nov 2025
14 Nov 2025
25 Nov 2025
14 Nov 2025
Earthwork in excavation by mechanical means (hydraulic excavator)/ manual means in foundation pipeline trenches drain (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottomS, lift upto 1.5m including getting out the excavated soil and disposal of surplus excacated soil as directed within a lead of 50m. a) All kind of soil
Centering and shuttering including struttings, propping etc. and removal of formworks for: a) Foundation, footings, bases of coulmns and mass concrete.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 0.93 MB
BOQ_26772.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .